{"id":38107,"date":"2025-12-15T15:35:43","date_gmt":"2025-12-15T21:35:43","guid":{"rendered":"https:\/\/www.projectmanager.com\/?p=38107"},"modified":"2026-07-17T13:52:43","modified_gmt":"2026-07-17T18:52:43","slug":"statement-work-definition-examples","status":"publish","type":"post","link":"https:\/\/www.projectmanager.com\/blog\/statement-work-definition-examples","title":{"rendered":"What Is a Statement of Work? Definition &#038; Examples"},"content":{"rendered":"<p>There&#8217;s always plenty of project management paperwork to create, get approved, file and archive. All project documents are important, but the statement of work (SOW) is easily one of the most important because it\u2019s made at the outset of a project and outlines everything that needs to go into your project.<\/p>\n<p>Using effective\u00a0<a href=\"https:\/\/projectmanager.com\/software\/planning\" target=\"_blank\" rel=\"noopener noreferrer\">project planning tools<\/a> and a thorough and well-written statement of work (SOW) will set you up to successfully lead a project over the finish line on schedule and within budget.<\/p>\n<h2 id=\"section-1\">What Is a Statement of Work (SOW)?<\/h2>\n<p>The statement of work (SOW) is a legally binding document that captures and defines all the <a href=\"\/blog\/what-is-work-management\">work management<\/a> aspects of your project. You\u2019ll note the activities, deliverables and timetable for the project. It\u2019s an extremely detailed work contract that defines the terms and conditions agreed upon between parties and lays the groundwork for the project plan.<\/p>\n<p>The statement of work (SOW) is one of the first documents you\u2019ll create to lay out the entire landscape of the project before you create a <a href=\"https:\/\/www.projectmanager.com\/project-planning\">project plan<\/a> and execute it. Because of the great amount of detail required, the prospect of writing one can be daunting. Let\u2019s break it down into more digestible parts. Your statement of work will be much more detailed than your job estimate, which is a simpler document that outlines the work that&#8217;ll be performed and the costs associated with it.<\/p>\n<div class=\"template-download-holder\">\n\t<div class=\"template-download-image-holder\">\n\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"900\" src=\"\/wp-content\/uploads\/2020\/09\/Statement-of-Work-Template.png\" class=\"attachment-large size-large\" alt=\"\" srcset=\"\/wp-content\/uploads\/2020\/09\/Statement-of-Work-Template.png 1600w, \/wp-content\/uploads\/2020\/09\/Statement-of-Work-Template-600x338.png 600w, \/wp-content\/uploads\/2020\/09\/Statement-of-Work-Template-300x169.png 300w, \/wp-content\/uploads\/2020\/09\/Statement-of-Work-Template-768x432.png 768w, \/wp-content\/uploads\/2020\/09\/Statement-of-Work-Template-1536x864.png 1536w, \/wp-content\/uploads\/2020\/09\/Statement-of-Work-Template-450x253.png 450w, \/wp-content\/uploads\/2020\/09\/Statement-of-Work-Template-384x216.png 384w, \/wp-content\/uploads\/2020\/09\/Statement-of-Work-Template-800x451.png 800w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/>\t<\/div><p class=\"intro\">Get your free<\/p>\n<h3>Statement of Work Template<\/h3>\n<p class=\"subtitle\">\n\tUse this free Statement of Work Template to manage your projects better.<\/p>\n\t<a class=\"button green\" href=\"https:\/\/www.projectmanager.com\/templates\/statement-of-work-template\">Get the template<\/a>\n<\/div> \n\n<p>&nbsp;<\/p>\n<p>When you\u2019re writing a statement of work, it can help to use a statement of work template because of the various aspects of the project that it must capture. Most statement-of-work templates include things such as a glossary of terms defining what you\u2019re referencing in the SOW. There will be a place for you to write the statement of purpose as well as administrative information. If you like our statement of work template, you can also try our <a href=\"\/pm-templates\">free project management templates<\/a> to manage your projects.<\/p>\n<h2 id=\"section-2\">What Is the Purpose of a Statement of Work (SOW)?<\/h2>\n<p>As noted, the statement of work is a detailed overview of the <a href=\"https:\/\/www.projectmanager.com\/blog\/project-scope\">project scope<\/a>. It\u2019s also a way to share the project requirements, acceptance criteria and payment terms with those who are working on the project, whether they&#8217;re collaborating or are contracted to work on the project. This includes stakeholders like vendors and contractors who are bidding to work on the project.<\/p>\n<p>An SOW contract is also helpful to <a href=\"https:\/\/www.projectmanager.com\/blog\/project-manager-job-description\">project managers<\/a> as it provides a structure on which the project plan can be built. The statement of work helps to avoid conflicts in the project. With detail and clarity, the SOW helps keep everyone who&#8217;s involved in the project on the same page and works to leave confusion to a minimum.<\/p>\n<p>When building your schedule, it helps to use <a href=\"\/\">project management software<\/a>. It can help organize your tasks and resources, as it&#8217;s critical to make an accurate schedule at this stage in the project. Project management software can also help you to create a work breakdown structure (<a href=\"\/guides\/work-breakdown-structure\">WBS<\/a>) to zoom into your project scope and identify your project\u2019s activities, deliverables and milestones.<\/p>\n<p><a href=\"https:\/\/www.projectmanager.com\">ProjectManager<\/a> can organize the information you&#8217;re gathering in our list view. But our tool does more than make a fancy to-do list. Choose between online Gantt charts, kanban boards, project calendars and other project management views to plan, schedule and track your projects. Our real-time software tracks your progress and the list shows the percentage complete for each task. See for yourself by taking our free 30-day trial.<\/p>\n<figure id=\"attachment_63413\" aria-describedby=\"caption-attachment-63413\" style=\"width: 1554px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.projectmanager.com\/freetrial?edition=d\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-63413 size-full\" src=\"\/wp-content\/uploads\/2022\/07\/construction-gantt-resources-costs-150-CTA-BUTTON-1.jpg\" alt=\"Gantt chart for tracking statement of work\" width=\"1554\" height=\"831\" srcset=\"\/wp-content\/uploads\/2022\/07\/construction-gantt-resources-costs-150-CTA-BUTTON-1.jpg 1554w, \/wp-content\/uploads\/2022\/07\/construction-gantt-resources-costs-150-CTA-BUTTON-1-600x321.jpg 600w, \/wp-content\/uploads\/2022\/07\/construction-gantt-resources-costs-150-CTA-BUTTON-1-300x160.jpg 300w, \/wp-content\/uploads\/2022\/07\/construction-gantt-resources-costs-150-CTA-BUTTON-1-768x411.jpg 768w, \/wp-content\/uploads\/2022\/07\/construction-gantt-resources-costs-150-CTA-BUTTON-1-1536x821.jpg 1536w, \/wp-content\/uploads\/2022\/07\/construction-gantt-resources-costs-150-CTA-BUTTON-1-450x241.jpg 450w\" sizes=\"auto, (max-width: 1554px) 100vw, 1554px\" \/><\/a><figcaption id=\"caption-attachment-63413\" class=\"wp-caption-text\">ProjectManager&#8217;s Gantt chart is powerful enough to keep track of your SOW. <a href=\"\/software\/gantt-chart\">Learn more.<\/a><\/figcaption><\/figure>\n<h2>When to Use a Statement of Work<\/h2>\n<p>A statement of work should be used at the start of any project that requires clear deliverables, defined responsibilities and a formal agreement between stakeholders. In the project management industry, it&#8217;s especially important for projects involving external vendors, multiple teams or complex tasks, where ambiguity can lead to delays, budget overruns or disputes.<\/p>\n<p>A SOW is also useful when projects have strict timelines, regulatory requirements or fixed budgets, as it sets expectations and defines scope upfront. Additionally, it serves as a reference point throughout <a href=\"https:\/\/www.projectmanager.com\/blog\/project-execution\">execution<\/a>, helping manage changes, prevent scope creep and ensure accountability across all parties.<\/p>\n<h2>Statement of Work vs. Scope of Work<\/h2>\n<p>While they sound the same, a statement of work isn&#8217;t a <a href=\"https:\/\/www.projectmanager.com\/training\/write-scope-work\">scope of work<\/a>. The statement of work, as we\u2019ve shown, is a formal document that details the goals of the project.<\/p>\n<p>The scope of work is part of the larger statement of work. In it, the way the project team will deliver the outcomes laid out in the SOW is described, so the scope of work is a much shorter <a href=\"\/blog\/great-project-documentation\">project document<\/a>.<\/p>\n<figure id=\"attachment_69043\" aria-describedby=\"caption-attachment-69043\" style=\"width: 600px\" class=\"wp-caption aligncenter\"><a href=\"\/templates\/scope-of-work-template\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-69043 size-medium\" src=\"\/wp-content\/uploads\/2023\/12\/Scope-of-work-template-screenshot-600x611.png\" alt=\"Scope Of Work Template Screenshot\" width=\"600\" height=\"611\" \/><\/a><figcaption id=\"caption-attachment-69043\" class=\"wp-caption-text\">Scope of work template <a href=\"\/blog\/statement-work-definition-examples\">Free download<\/a><\/figcaption><\/figure>\n<h2>What Does SOW Stand for In Business and Project Management?<\/h2>\n<p>Now that we\u2019ve cleared the difference between a statement of work and scope of work, it\u2019s important to note that the SOW acronym stands for statement of work and not scope of work, which is a component of the SOW. Similarly, the terms SOW contract, SOW document and SOW agreement also refer to statements of work in <a href=\"\/guides\/project-management\">project management<\/a> and business.<\/p>\n<h2>Statement of Work Template<\/h2>\n<p>Templates make everything a little bit easier. Jump-start your statement of work document with our <a href=\"\/templates\/statement-of-work-template\">free SOW template for Word<\/a>. It helps you outline your project background, schedule, deliverables, communication plan and more. Download your free copy today.<\/p>\n<figure id=\"attachment_61444\" aria-describedby=\"caption-attachment-61444\" style=\"width: 600px\" class=\"wp-caption aligncenter\"><a href=\"\/templates\/statement-of-work-template\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-61444 size-medium\" src=\"\/wp-content\/uploads\/2020\/09\/Statement-of-Work-Screenshot-600x473.jpg\" alt=\"Free statement of work template for Word\" width=\"600\" height=\"473\" srcset=\"\/wp-content\/uploads\/2020\/09\/Statement-of-Work-Screenshot-600x473.jpg 600w, \/wp-content\/uploads\/2020\/09\/Statement-of-Work-Screenshot-300x236.jpg 300w, \/wp-content\/uploads\/2020\/09\/Statement-of-Work-Screenshot-768x605.jpg 768w, \/wp-content\/uploads\/2020\/09\/Statement-of-Work-Screenshot-450x355.jpg 450w, \/wp-content\/uploads\/2020\/09\/Statement-of-Work-Screenshot.jpg 1010w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><figcaption id=\"caption-attachment-61444\" class=\"wp-caption-text\">ProjectManager&#8217;s statement of work template <a href=\"\/templates\/statement-of-work-template\">Free download<\/a><\/figcaption><\/figure>\n<h2 id=\"section-3\">Types of Statement of Work<\/h2>\n<p>An SOW can be broken down into three main categories, which can be defined as follows.<\/p>\n<ul>\n<li><strong>Design\/detail SOW<\/strong><strong>:\u00a0<\/strong>When you&#8217;re writing this SOW, you&#8217;re conveying to the supplier how you want the work done. What are the buyer requirements that&#8217;ll control the supplier&#8217;s process? You can use a <a href=\"https:\/\/projectmanager.com\/templates\/requirements-gathering-template\" rel=\"noopener noreferrer\">requirements gathering template<\/a> to ensure you gather them all. These project requirements can run the gamut from quality acceptance criteria and payment terms to the measurement of materials. In this SOW, it\u2019s the buyer who&#8217;s being held responsible for the performance, as he&#8217;s the one directing the project course.<\/li>\n<li><strong>Level of effort\/time and materials\/unit rate SOW: <\/strong>This SOW agreement is an almost universal version and it can apply to most projects. It defines the <a href=\"\/blog\/level-of-effort\">level of effort<\/a> as well as the materials and cost per unit. It tends to find use in short-term contracts.<\/li>\n<li><strong>Performance-based SOW: <\/strong>This is the preferred SOW of project managers as it focuses on the purpose of the project, the resources and the quality level expected of the <a href=\"https:\/\/www.projectmanager.com\/training\/what-are-project-deliverables\">deliverables<\/a>. It does not, however, explain how the work is supposed to get done. This allows a great deal of autonomy in how to get to an outcome without requiring a specific process.<\/li>\n<\/ul>\n<h2 id=\"section-4\">How to Write a Statement of Work (SOW)<\/h2>\n<p>A statement of work is a legally binding agreement between a client and a vendor that describes the terms and conditions for the execution of a project&#8217;s scope of work. There\u2019s a lot of information to describe in the SOW. You can create this on your own if you want, but using <a href=\"\/software\">project management tools<\/a> to make sure nothing is left out will prove helpful. You only have one chance to create your SOW document and you want it done right.<\/p>\n<p>Here\u2019s an overview of the steps you\u2019ll need to follow to write your statement of work:<\/p>\n<ol>\n<li>Create a brief introduction for your project<\/li>\n<li>Define the purpose of your project<\/li>\n<li>Define your project scope<\/li>\n<li>Create a work breakdown structure to identify your project tasks, milestones and <a href=\"\/blog\/project-deliverable\">deliverables<\/a><\/li>\n<li>Create a <a href=\"\/project-scheduling\">project schedule<\/a><\/li>\n<li>Define project requirements and acceptance criteria<\/li>\n<li>Define payment terms and conditions<\/li>\n<\/ol>\n<p>In terms of writing the statement of work, you\u2019ll want to be specific with this project document. You want to clarify the terms used to make them universally understood and clearly define who&#8217;s going to do what and by what time those tasks must be completed. This avoids confusion later in the <a href=\"\/blog\/project-definition\">project<\/a> when you can\u2019t afford miscommunications or disputes.<\/p>\n<p>Besides writing clearly, include visuals in the SOW to help focus the lens on various project aspects. Including visuals, be they <a href=\"\/blog\/3-best-project-management-charts\">project charts<\/a>, graphs or other illustrations to help you clarify the project, will make the SOW agreement more digestible.<\/p>\n<p>After all the work you&#8217;ve done to detail the specifics of the project, you don\u2019t want to neglect the final, crucial step \u2014 getting the work signed off. You can&#8217;t proceed if you don\u2019t have the authority to do so. Or, more accurately, you can, but it might cost you the <a href=\"\/blog\/5-ways-to-measure-project-success\">success of the project<\/a>. Make sure that those in authority have signed off on the statement of work.<\/p>\n<h2><a class=\"trapdoor\" href=\"https:\/\/learn.projectmanager.com\/pm-101-ebook\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-73861 size-full\" src=\"\/wp-content\/uploads\/2025\/02\/PM-101-eBook-banner-ad.jpg\" alt=\"PM 101 eBook banner-ad\" width=\"2021\" height=\"521\" srcset=\"\/wp-content\/uploads\/2025\/02\/PM-101-eBook-banner-ad.jpg 2021w, \/wp-content\/uploads\/2025\/02\/PM-101-eBook-banner-ad-600x155.jpg 600w, \/wp-content\/uploads\/2025\/02\/PM-101-eBook-banner-ad-1600x412.jpg 1600w, \/wp-content\/uploads\/2025\/02\/PM-101-eBook-banner-ad-300x77.jpg 300w, \/wp-content\/uploads\/2025\/02\/PM-101-eBook-banner-ad-768x198.jpg 768w, \/wp-content\/uploads\/2025\/02\/PM-101-eBook-banner-ad-1536x396.jpg 1536w, \/wp-content\/uploads\/2025\/02\/PM-101-eBook-banner-ad-450x116.jpg 450w\" sizes=\"auto, (max-width: 2021px) 100vw, 2021px\" \/><\/a><\/h2>\n<h2>What Should Be Included in a Statement of Work (SOW)?<\/h2>\n<p>There are as many parts in a statement of work as there are in a project, so it&#8217;s advisable to use a <a href=\"\/blog\/a-complete-guide-to-pmis\">project management information system<\/a> to help you manage its components. If you start by focusing on the parts, you can work yourself up to the whole. For a full understanding of an SOW, first, note the major aspects of the project it addresses.<\/p>\n<h3>1. Project Background<\/h3>\n<p>Project background is a concise summary of the circumstances, conditions and prior decisions that led to the initiation of the project. It describes the situation that exists before work begins, including relevant history, business context and triggering events, without proposing solutions or commitments.<\/p>\n<p>In a statement of work, the project background establishes shared context between the parties, explains why the engagement exists and provides a factual foundation for interpreting scope, objectives, assumptions and contractual obligations that follow, reducing ambiguity and misalignment during execution.<\/p>\n<h3>2. Purpose Statement<\/h3>\n<p>Start with the big question: why are you initiating this project? What&#8217;s the purpose of the project? Create a purpose statement to lead this section and provide a thorough answer to these questions, such as what are the project objectives, deliverables and return on investment?<\/p>\n<h3>3. Project Goals and Objectives<\/h3>\n<p>Project goals and objectives define the desired outcomes and specific results a project is expected to achieve within a statement of work. Goals describe the broader purpose and direction of the project, while objectives translate those goals into measurable, actionable targets. Together, they establish a clear framework for <a href=\"https:\/\/www.projectmanager.com\/blog\/decision-making-tools-techniques\">decision-making<\/a>, align stakeholder expectations and provide criteria for evaluating performance, progress and successful project completion.<\/p>\n<h3>4. Scope of Work<\/h3>\n<p>What work needs to be done in the project? Note it in the <a href=\"https:\/\/projectmanager.com\/training\/write-scope-work\">scope of work<\/a>, including what hardware and software will be necessary. What&#8217;s the process you\u2019ll use to complete the work defined in your project scope? This includes outcomes, time involved and even general steps it\u2019ll take to achieve that. You&#8217;ll need to create a project scope statement to capture the information about your project scope.<\/p>\n<ul>\n<li><strong>Project tasks:<\/strong> Specific activities required to complete the work outlined in a statement of work. They break the project scope into manageable units, defining what actions must be performed, by whom and often within what timeframe. Defined tasks help ensure accountability, support accurate scheduling and cost estimates and provide a structured path for executing the scope.<\/li>\n<li><strong>Project task dependencies:<\/strong> Describe the relationships between tasks, identifying which activities must be completed before others can begin. In an SOW, documenting <a href=\"https:\/\/www.projectmanager.com\/training\/estimate-tasks-and-dependencies\">dependencies<\/a> clarifies workflow, sequencing and timing constraints. This helps set realistic schedules, anticipate potential delays and ensure that interrelated tasks are coordinated effectively to support smooth project execution.<\/li>\n<li><strong>Roles and responsibilities:<\/strong> Define who is accountable for specific tasks, decisions and deliverables within a statement of work. This section clarifies expectations for project sponsors, managers, team members and external parties. Clearly assigning responsibilities reduces confusion, prevents overlap or gaps in ownership and supports efficient <a href=\"https:\/\/www.projectmanager.com\/blog\/what-is-project-collaboration\">collaboration<\/a> and accountability throughout the project lifecycle.<\/li>\n<li><strong>Project deliverables:<\/strong> Tangible or measurable outputs the project is expected to produce, as defined in the statement of work. They specify what will be delivered, in what format and often to what standard. Defined deliverables provide a basis for acceptance, performance measurement and payment.<\/li>\n<li><strong>Project milestones:<\/strong> Key points or events that mark significant progress or achievements within a project. In a statement of work, milestones help structure the timeline, track progress and align stakeholders on critical phases. They are often tied to reviews, approvals or payments and provide clear checkpoints for measuring advancement toward project completion.<\/li>\n<li><strong>Project exclusions:<\/strong> Identify tasks, deliverables or responsibilities that are intentionally outside the project\u2019s scope. In a statement of work, stating exclusions helps prevent misunderstandings and scope creep. By defining what is not included, stakeholders can align expectations and reduce the risk of disputes.<\/li>\n<\/ul>\n<p><strong>Related:\u00a0<\/strong><a href=\"\/templates\/project-scope-template\">Project Scope Template<\/a><\/p>\n<p>Use project management software to monitor your progress and ensure you&#8217;re meeting your milestones. <a href=\"https:\/\/www.projectmanager.com\">ProjectManager<\/a> has a real-time dashboard that&#8217;s built into the tool, unlike other software that makes you build your own. We not only have a dashboard embedded but it automatically calculates and displays the metrics in easy-to-read charts and graphs. Keep up with more than milestones, but also project variance, costs and more.<\/p>\n<a href=\"\/software\/dashboard\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-61502 size-full\" src=\"\/wp-content\/uploads\/2022\/03\/Dashboard_Construction_Wide_Zoom-150.jpg\" alt=\"ProjectManager\u2019s dashboard view, which shows six key metrics on a project\" width=\"1568\" height=\"816\" srcset=\"\/wp-content\/uploads\/2022\/03\/Dashboard_Construction_Wide_Zoom-150.jpg 1568w, \/wp-content\/uploads\/2022\/03\/Dashboard_Construction_Wide_Zoom-150-600x312.jpg 600w, \/wp-content\/uploads\/2022\/03\/Dashboard_Construction_Wide_Zoom-150-300x156.jpg 300w, \/wp-content\/uploads\/2022\/03\/Dashboard_Construction_Wide_Zoom-150-768x400.jpg 768w, \/wp-content\/uploads\/2022\/03\/Dashboard_Construction_Wide_Zoom-150-1536x799.jpg 1536w, \/wp-content\/uploads\/2022\/03\/Dashboard_Construction_Wide_Zoom-150-450x234.jpg 450w\" sizes=\"auto, (max-width: 1568px) 100vw, 1568px\" \/><\/a>\n<h3>5. Work Schedule<\/h3>\n<p>The work schedule defines when contracted work will be performed across the engagement period for the statement of work. It identifies key dates, phases, milestones, review points and the overall performance window at a high level.<\/p>\n<p>The work schedule establishes timing expectations and phase relationships, supports coordination between parties and provides a <a href=\"https:\/\/www.projectmanager.com\/blog\/project-baseline\">baseline<\/a> for tracking progress, evaluating schedule changes and assessing timing impacts on costs, resources and deliverable acceptance throughout the duration of the agreement.<\/p>\n<h3>6. Project Requirements<\/h3>\n<p>Project requirements establish the mandatory conditions that must be satisfied for the work to proceed, be reviewed and be accepted. They specify obligations related to communication, approvals, reporting, access, compliance, quality and documentation that govern how the parties interact during delivery.<\/p>\n<ul>\n<li><strong>Communication and reporting requirements:<\/strong> Define how progress is communicated, including reporting frequency, formats, meetings and points of contact, ensuring visibility, alignment and timely issue identification throughout the engagement.<\/li>\n<li><strong>Review, approval and decision requirements:<\/strong> Specify required reviews, approval authorities and response timelines that govern deliverable evaluation, change authorization and decision-making, preventing delays and ambiguity during execution.<\/li>\n<li><strong>Acceptance criteria and validation requirements:<\/strong> Establish acceptance criteria and processes for confirming deliverables meet agreed standards, including testing, inspections and formal sign-off, forming the basis for acceptance and payment.<\/li>\n<li><strong>Compliance, quality and documentation requirements: <\/strong>Define applicable laws, standards, quality benchmarks and documentation obligations that must be met to ensure contractual, regulatory and operational compliance throughout delivery.<\/li>\n<\/ul>\n<h3>7. Project Assumptions<\/h3>\n<p>Project assumptions are conditions or factors that are accepted as true for planning purposes, even though they may not be fully verified. In a statement of work, documenting assumptions provides context for scope, timelines and cost estimates. They help align <a href=\"https:\/\/www.projectmanager.com\/training\/how-to-manage-stakeholder-expectations\">stakeholder expectations<\/a>, identify potential risks and establish a baseline for decision-making if conditions change during project execution.<\/p>\n<h3>8. Project Constraints<\/h3>\n<p>Project constraints are the limitations or restrictions that affect how a project is planned and executed, such as budget, schedule, resources, or regulatory requirements. In a statement of work, defining these constraints sets realistic expectations and establishes boundaries for delivery. This information guides planning decisions, supports <a href=\"https:\/\/www.projectmanager.com\/blog\/risk-management-plan\">risk management<\/a> and helps ensure the project remains achievable within agreed-upon limits.<\/p>\n<h3>9. Quality Assurance Guidelines<\/h3>\n<p>Quality assurance guidelines define the standards, processes and criteria used to ensure project work meets required levels of quality and performance. In a statement of work, these guidelines establish how quality will be measured, reviewed and maintained throughout execution. They help align expectations, support consistent results, reduce rework and provide a clear basis for evaluating deliverables against agreed-upon quality standards.<\/p>\n<h3>10. Quality Control Procedures<\/h3>\n<p>Quality control procedures are the specific methods and activities used to inspect, test and verify that project deliverables meet defined quality requirements. In a statement of work, these procedures outline how quality will be checked, who is responsible and when reviews will occur. They support consistent evaluation, early detection of defects and acceptance of deliverables that meet agreed-upon standards.<\/p>\n<h3>11. Project Success Criteria<\/h3>\n<p>Quality control procedures are the specific inspection, testing and verification activities used to confirm that project deliverables meet defined quality standards. In a statement of work, documenting these procedures clarifies how outputs will be reviewed, who is responsible for checks and when evaluations occur. This ensures consistent quality, supports acceptance decisions and reduces defects, rework and disputes during project execution.<\/p>\n<h3>12. Change Management Approach<\/h3>\n<p>A <a href=\"https:\/\/www.projectmanager.com\/training\/how-to-make-a-change-management-plan\">change management<\/a> approach defines the formal process for requesting, evaluating, approving and implementing changes to the project scope, schedule, or cost. In a statement of work, it establishes how changes will be documented, who has approval authority and how impacts will be assessed. This approach helps control scope creep, maintain alignment with project objectives and ensure changes are managed consistently and transparently.<\/p>\n<h3>13. Payment Terms<\/h3>\n<p>If the <a href=\"https:\/\/www.projectmanager.com\/training\/create-and-manage-project-budget\">project budget<\/a> has been created, then you can list the payments related to the project and how they&#8217;ll be delivered: upfront, over time or after completion. For example, you can pay after the completion of a milestone or on a fixed schedule, whichever is more financially feasible.<\/p>\n<h3>14. Other<\/h3>\n<p>There will be other parts of the project that aren&#8217;t suited to the above categories, and this is the place where you can add them so that everything is covered. For example, are there security issues, restrictions around hardware or software, travel pay, post-project support, etc?<\/p>\n<p><strong>Related:\u00a0<\/strong><a href=\"\/templates\/project-task-tracking-template\">Project Task Tracking Template<\/a><\/p>\n<h2>Statement of Work Example<\/h2>\n<p>We\u2019ve been talking a lot about a statement of work, but a statement of work example can help make the subject more understandable. Let\u2019s take a look at what a statement of work sample would look like in a real-life scenario.<\/p>\n<p>This statement of work defines the terms, scope and expectations for the construction of a new 12,000-square-foot light industrial warehouse expansion. The document establishes contractual alignment between the client and contractor by clearly defining objectives, scope boundaries, deliverables and responsibilities before the start of physical work.<\/p>\n<h3>Project Background<\/h3>\n<p>The client operates a growing regional distribution business and has outgrown its existing warehouse capacity. Increased inventory volumes and operational throughput have created space constraints that limit efficiency and future growth. This project involves constructing a warehouse expansion adjacent to the existing facility to support increased storage capacity, improve logistics flow and meet applicable zoning and building regulations.<\/p>\n<h3>Purpose Statement<\/h3>\n<p>The purpose of this statement of work is to formally document the construction services to be provided for the warehouse expansion project. It defines what work is included, how deliverables will be produced, who is responsible for execution and what activities fall outside the agreed scope, serving as the baseline for performance measurement and <a href=\"https:\/\/www.projectmanager.com\/blog\/what-is-change-control-in-project-management\">change control.<\/a><\/p>\n<h3>Project Goals and Objectives<\/h3>\n<p>The primary goal of the project is to deliver a fully operational warehouse expansion that meets structural, safety and regulatory requirements within the agreed schedule and budget. Supporting objectives focus on quality execution, coordination among trades and minimizing disruption to existing warehouse operations.<\/p>\n<table>\n<tbody>\n<tr>\n<td style=\"border: 1px solid gray;\"><b>Goal ID<\/b><\/td>\n<td style=\"border: 1px solid gray;\"><b>Project Goal<\/b><\/td>\n<td style=\"border: 1px solid gray;\"><b>Objective<\/b><\/td>\n<td style=\"border: 1px solid gray;\"><b>Success Metric<\/b><\/td>\n<td style=\"border: 1px solid gray;\"><b>Target Date<\/b><\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid gray;\">G-01<\/td>\n<td style=\"border: 1px solid gray;\">Construct warehouse expansion<\/td>\n<td style=\"border: 1px solid gray;\">Complete all construction activities<\/td>\n<td style=\"border: 1px solid gray;\">100% scope delivered<\/td>\n<td style=\"border: 1px solid gray;\">15\/11\/2025<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid gray;\">G-02<\/td>\n<td style=\"border: 1px solid gray;\">Maintain schedule performance<\/td>\n<td style=\"border: 1px solid gray;\">Avoid critical path delays<\/td>\n<td style=\"border: 1px solid gray;\">On-time completion<\/td>\n<td style=\"border: 1px solid gray;\">Project close<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid gray;\">G-03<\/td>\n<td style=\"border: 1px solid gray;\">Meet safety and compliance standards<\/td>\n<td style=\"border: 1px solid gray;\">Pass all inspections<\/td>\n<td style=\"border: 1px solid gray;\">100% approvals obtained<\/td>\n<td style=\"border: 1px solid gray;\">Final inspection<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3>Scope of Work<\/h3>\n<p>The scope of work defines the construction tasks required to deliver the warehouse expansion, including dependencies, deliverables, assigned responsibilities and explicit exclusions. Any work not expressly included in this section is considered outside the scope and subject to formal change control.<\/p>\n<table>\n<tbody>\n<tr>\n<td style=\"border: 1px solid gray;\"><b>Project Tasks<\/b><\/td>\n<td style=\"border: 1px solid gray;\"><b>Task Dependencies<\/b><\/td>\n<td style=\"border: 1px solid gray;\"><b>Project Deliverables<\/b><\/td>\n<td style=\"border: 1px solid gray;\"><b>Roles and Responsibilities<\/b><\/td>\n<td style=\"border: 1px solid gray;\"><b>Exclusions<\/b><\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid gray;\">Site preparation and grading<\/td>\n<td style=\"border: 1px solid gray;\">Approved site plans<\/td>\n<td style=\"border: 1px solid gray;\">Cleared and leveled site<\/td>\n<td style=\"border: 1px solid gray;\">General contractor manages earthworks<\/td>\n<td style=\"border: 1px solid gray;\">Environmental remediation<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid gray;\">Foundation construction<\/td>\n<td style=\"border: 1px solid gray;\">Completed site preparation<\/td>\n<td style=\"border: 1px solid gray;\">Poured and cured foundation<\/td>\n<td style=\"border: 1px solid gray;\">Concrete subcontractor executes foundation work<\/td>\n<td style=\"border: 1px solid gray;\">Underground utility relocation<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid gray;\">Structural framing<\/td>\n<td style=\"border: 1px solid gray;\">Foundation approval<\/td>\n<td style=\"border: 1px solid gray;\">Steel frame erected<\/td>\n<td style=\"border: 1px solid gray;\">Structural contractor installs framing<\/td>\n<td style=\"border: 1px solid gray;\">Future vertical expansion<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid gray;\">Building envelope installation<\/td>\n<td style=\"border: 1px solid gray;\">Completed framing<\/td>\n<td style=\"border: 1px solid gray;\">Roofing and exterior walls<\/td>\n<td style=\"border: 1px solid gray;\">Envelope subcontractors install roofing and cladding<\/td>\n<td style=\"border: 1px solid gray;\">Specialty fa\u00e7ade elements<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid gray;\">Interior utilities rough-in<\/td>\n<td style=\"border: 1px solid gray;\">Enclosed structure<\/td>\n<td style=\"border: 1px solid gray;\">Installed electrical and lighting systems<\/td>\n<td style=\"border: 1px solid gray;\">Electrical subcontractor performs installations<\/td>\n<td style=\"border: 1px solid gray;\">Office fit-out or furnishings<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3>Work Schedule<\/h3>\n<p>The work schedule outlines the planned sequencing and duration of major project phases. Dates are based on the notice to proceed and assume timely approvals and site access. The schedule establishes baseline expectations for progress tracking and milestone coordination.<\/p>\n<table>\n<tbody>\n<tr>\n<td style=\"border: 1px solid gray;\"><b>Project Phase<\/b><\/td>\n<td style=\"border: 1px solid gray;\"><b>Start Date<\/b><\/td>\n<td style=\"border: 1px solid gray;\"><b>End Date<\/b><\/td>\n<td style=\"border: 1px solid gray;\"><b>Duration<\/b><\/td>\n<td style=\"border: 1px solid gray;\"><b>Responsible Party<\/b><\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid gray;\">Site preparation and grading<\/td>\n<td style=\"border: 1px solid gray;\">01\/08\/2025<\/td>\n<td style=\"border: 1px solid gray;\">15\/08\/2025<\/td>\n<td style=\"border: 1px solid gray;\">2 weeks<\/td>\n<td style=\"border: 1px solid gray;\">General contractor<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid gray;\">Foundation construction<\/td>\n<td style=\"border: 1px solid gray;\">18\/08\/2025<\/td>\n<td style=\"border: 1px solid gray;\">05\/09\/2025<\/td>\n<td style=\"border: 1px solid gray;\">3 weeks<\/td>\n<td style=\"border: 1px solid gray;\">Concrete subcontractor<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid gray;\">Structural framing<\/td>\n<td style=\"border: 1px solid gray;\">08\/09\/2025<\/td>\n<td style=\"border: 1px solid gray;\">26\/09\/2025<\/td>\n<td style=\"border: 1px solid gray;\">3 weeks<\/td>\n<td style=\"border: 1px solid gray;\">Structural contractor<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid gray;\">Building envelope<\/td>\n<td style=\"border: 1px solid gray;\">29\/09\/2025<\/td>\n<td style=\"border: 1px solid gray;\">17\/10\/2025<\/td>\n<td style=\"border: 1px solid gray;\">3 weeks<\/td>\n<td style=\"border: 1px solid gray;\">Envelope subcontractors<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid gray;\">Interior utilities and inspections<\/td>\n<td style=\"border: 1px solid gray;\">20\/10\/2025<\/td>\n<td style=\"border: 1px solid gray;\">14\/11\/2025<\/td>\n<td style=\"border: 1px solid gray;\">4 weeks<\/td>\n<td style=\"border: 1px solid gray;\">Electrical contractor<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3>Project Requirements<\/h3>\n<p>Project requirements define the technical, regulatory and performance standards that must be met for deliverables to be accepted. These requirements establish objective criteria for compliance, inspection and final approval.<\/p>\n<table>\n<tbody>\n<tr>\n<td style=\"border: 1px solid gray;\"><b>Requirement Category<\/b><\/td>\n<td style=\"border: 1px solid gray;\"><b>Requirement Description<\/b><\/td>\n<td style=\"border: 1px solid gray;\"><b>Verification Method<\/b><\/td>\n<td style=\"border: 1px solid gray;\"><b>Responsible Party<\/b><\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid gray;\">Structural<\/td>\n<td style=\"border: 1px solid gray;\">Warehouse structure must meet approved engineering specifications<\/td>\n<td style=\"border: 1px solid gray;\">Engineer inspection and certification<\/td>\n<td style=\"border: 1px solid gray;\">Structural contractor<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid gray;\">Regulatory<\/td>\n<td style=\"border: 1px solid gray;\">Compliance with local building and fire codes<\/td>\n<td style=\"border: 1px solid gray;\">Authority inspections<\/td>\n<td style=\"border: 1px solid gray;\">General contractor<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid gray;\">Safety<\/td>\n<td style=\"border: 1px solid gray;\">Adherence to site safety and OSHA standards<\/td>\n<td style=\"border: 1px solid gray;\">Safety audits and reports<\/td>\n<td style=\"border: 1px solid gray;\">Project manager<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid gray;\">Operational<\/td>\n<td style=\"border: 1px solid gray;\">Warehouse ready for storage operations upon completion<\/td>\n<td style=\"border: 1px solid gray;\">Final walkthrough and client sign-off<\/td>\n<td style=\"border: 1px solid gray;\">Client and contractor<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3>Project Assumptions<\/h3>\n<p>Project assumptions identify conditions believed to be true for planning purposes. If any assumption proves incorrect, schedule, cost or scope adjustments may be required through formal change control.<\/p>\n<table>\n<tbody>\n<tr>\n<td style=\"border: 1px solid gray;\"><b>Assumption ID<\/b><\/td>\n<td style=\"border: 1px solid gray;\"><b>Assumption Description<\/b><\/td>\n<td style=\"border: 1px solid gray;\"><b>Impact if Invalid<\/b><\/td>\n<td style=\"border: 1px solid gray;\"><b>Owner<\/b><\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid gray;\">A-01<\/td>\n<td style=\"border: 1px solid gray;\">Permits will be approved within planned timelines<\/td>\n<td style=\"border: 1px solid gray;\">Schedule delays<\/td>\n<td style=\"border: 1px solid gray;\">Client<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid gray;\">A-02<\/td>\n<td style=\"border: 1px solid gray;\">Site access will be available throughout construction<\/td>\n<td style=\"border: 1px solid gray;\">Reduced productivity<\/td>\n<td style=\"border: 1px solid gray;\">Client<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid gray;\">A-03<\/td>\n<td style=\"border: 1px solid gray;\">Key materials will be available as scheduled<\/td>\n<td style=\"border: 1px solid gray;\">Cost increases or resequencing<\/td>\n<td style=\"border: 1px solid gray;\">General contractor<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3>Project Constraints<\/h3>\n<p>Project constraints identify fixed limitations that restrict planning flexibility. These constraints must be managed throughout execution and cannot be altered without formal agreement.<\/p>\n<table>\n<tbody>\n<tr>\n<td style=\"border: 1px solid gray;\"><b>Constraint Type<\/b><\/td>\n<td style=\"border: 1px solid gray;\"><b>Description<\/b><\/td>\n<td style=\"border: 1px solid gray;\"><b>Impact<\/b><\/td>\n<td style=\"border: 1px solid gray;\"><b>Mitigation Approach<\/b><\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid gray;\">Schedule<\/td>\n<td style=\"border: 1px solid gray;\">Project must be completed before peak inventory season<\/td>\n<td style=\"border: 1px solid gray;\">Limited float<\/td>\n<td style=\"border: 1px solid gray;\"><a href=\"https:\/\/www.projectmanager.com\/blog\/critical-path-analysis-example-template\">Critical path<\/a> monitoring<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid gray;\">Budget<\/td>\n<td style=\"border: 1px solid gray;\">Total construction budget is fixed<\/td>\n<td style=\"border: 1px solid gray;\">Restricted scope flexibility<\/td>\n<td style=\"border: 1px solid gray;\">Cost control and approvals<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid gray;\">Operational<\/td>\n<td style=\"border: 1px solid gray;\">Existing warehouse operations must continue<\/td>\n<td style=\"border: 1px solid gray;\">Phased work required<\/td>\n<td style=\"border: 1px solid gray;\">Coordination with client operations<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3>Quality Assurance and Control<\/h3>\n<p>Quality assurance and control define the processes and standards used to ensure that all work performed under this statement of work meets contractual, regulatory and technical requirements. Quality activities focus on preventing defects through planning and oversight while verifying completed work through inspections, testing and formal acceptance before <a href=\"https:\/\/www.projectmanager.com\/blog\/project-closure\">project closeout.<\/a><\/p>\n<table>\n<tbody>\n<tr>\n<td style=\"border: 1px solid gray;\"><b>Quality Area<\/b><\/td>\n<td style=\"border: 1px solid gray;\"><b>Quality Standard<\/b><\/td>\n<td style=\"border: 1px solid gray;\"><b>Quality Control Method<\/b><\/td>\n<td style=\"border: 1px solid gray;\"><b>Acceptance Criteria<\/b><\/td>\n<td style=\"border: 1px solid gray;\"><b>Responsible Party<\/b><\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid gray;\">Site work and foundation<\/td>\n<td style=\"border: 1px solid gray;\">Approved engineering drawings and specifications<\/td>\n<td style=\"border: 1px solid gray;\">On-site inspections and material testing<\/td>\n<td style=\"border: 1px solid gray;\">Foundation meets design tolerances and passes inspection<\/td>\n<td style=\"border: 1px solid gray;\">General contractor<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid gray;\">Structural framing<\/td>\n<td style=\"border: 1px solid gray;\">Structural codes and approved shop drawings<\/td>\n<td style=\"border: 1px solid gray;\">Engineer review and field verification<\/td>\n<td style=\"border: 1px solid gray;\">Structure approved by structural engineer<\/td>\n<td style=\"border: 1px solid gray;\">Structural contractor<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid gray;\">Building envelope<\/td>\n<td style=\"border: 1px solid gray;\">Manufacturer specifications and installation standards<\/td>\n<td style=\"border: 1px solid gray;\">Installation inspections and water intrusion checks<\/td>\n<td style=\"border: 1px solid gray;\">Envelope is weather-tight and defect-free<\/td>\n<td style=\"border: 1px solid gray;\">Envelope subcontractors<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid gray;\">Electrical systems<\/td>\n<td style=\"border: 1px solid gray;\">Electrical codes and approved plans<\/td>\n<td style=\"border: 1px solid gray;\">Functional testing and authority inspections<\/td>\n<td style=\"border: 1px solid gray;\">All systems operational and approved<\/td>\n<td style=\"border: 1px solid gray;\">Electrical subcontractor<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid gray;\">Final completion<\/td>\n<td style=\"border: 1px solid gray;\">Contract requirements and regulatory approvals<\/td>\n<td style=\"border: 1px solid gray;\">Final walkthrough and punch-list verification<\/td>\n<td style=\"border: 1px solid gray;\">Client sign-off with no outstanding defects<\/td>\n<td style=\"border: 1px solid gray;\">Project manager<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>ProjectManager Can Improve Your Statement of Work<\/h2>\n<p><a href=\"\/\">ProjectManager<\/a> has a suite of project management tools that can help you put together a statement of work (SOW) that accurately depicts the forthcoming project. For starters, you can use our Gantt to start listing the tasks you can think of for the project.<\/p>\n<h3>Plan and Schedule Project Tasks With Gantt Charts<\/h3>\n<p>The online Gantt has the basics of a visual timeline and the ability to link dependencies to avoid bottlenecks and set milestones. Assign costs to tasks and see your planned costs for the project or specific phases. You can use the <a href=\"\/software\/critical-path\">critical path tool<\/a> to know what tasks can be skipped if necessary and set the baseline once your schedule and budget are done. That means you&#8217;ll be able to track in real time whether you&#8217;re staying on track and under budget. ProjectManager has the tools you want and delivers more functionality than the competition.<\/p>\n<a href=\"\/software\/gantt-chart\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-66428 size-full\" src=\"\/wp-content\/uploads\/2023\/03\/Gantt_Construction_Wide_Zoom-150-1.webp\" alt=\"Gantt Chart Hero Webp\" width=\"1568\" height=\"817\" srcset=\"\/wp-content\/uploads\/2023\/03\/Gantt_Construction_Wide_Zoom-150-1.webp 1568w, \/wp-content\/uploads\/2023\/03\/Gantt_Construction_Wide_Zoom-150-1-600x313.webp 600w, \/wp-content\/uploads\/2023\/03\/Gantt_Construction_Wide_Zoom-150-1-300x156.webp 300w, \/wp-content\/uploads\/2023\/03\/Gantt_Construction_Wide_Zoom-150-1-768x400.webp 768w, \/wp-content\/uploads\/2023\/03\/Gantt_Construction_Wide_Zoom-150-1-1536x800.webp 1536w, \/wp-content\/uploads\/2023\/03\/Gantt_Construction_Wide_Zoom-150-1-450x234.webp 450w\" sizes=\"auto, (max-width: 1568px) 100vw, 1568px\" \/><\/a>\n<p>As you can see, using our <a href=\"\/software\/gantt-chart\">Gantt chart software<\/a> can go a long way to making an accurate statement of work for your project. Accuracy means a lot to stakeholders when it comes time to deliver on the work that you scoped out.<\/p>\n<h3>Keep Track of Progress, Costs and Schedules With Real-Time Dashboards<\/h3>\n<p>ProjectManager&#8217;s <a href=\"\/software\/dashboard\">project dashboard<\/a> tracks progress, costs and workload in real time so you can monitor the execution of your statement of work and quickly determine whether your project team is delivering tasks on time and on budget. In addition, Gantt charts and kanban boards have built-in risk and resource management features for better project tracking.<\/p>\n<a href=\"\/software\/dashboard\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-64522 size-full\" src=\"\/wp-content\/uploads\/2022\/10\/Portfolio-dashboard-compressed.png\" alt=\"Portfolio Dashboard Compressed\" width=\"2268\" height=\"1301\" srcset=\"\/wp-content\/uploads\/2022\/10\/Portfolio-dashboard-compressed.png 2268w, \/wp-content\/uploads\/2022\/10\/Portfolio-dashboard-compressed-600x344.png 600w, \/wp-content\/uploads\/2022\/10\/Portfolio-dashboard-compressed-1600x918.png 1600w, \/wp-content\/uploads\/2022\/10\/Portfolio-dashboard-compressed-300x172.png 300w, \/wp-content\/uploads\/2022\/10\/Portfolio-dashboard-compressed-768x441.png 768w, \/wp-content\/uploads\/2022\/10\/Portfolio-dashboard-compressed-1536x881.png 1536w, \/wp-content\/uploads\/2022\/10\/Portfolio-dashboard-compressed-2048x1175.png 2048w, \/wp-content\/uploads\/2022\/10\/Portfolio-dashboard-compressed-450x258.png 450w\" sizes=\"auto, (max-width: 2268px) 100vw, 2268px\" \/><\/a>\n<h2>Related Work Management Content<\/h2>\n<ul>\n<li><a href=\"https:\/\/www.projectmanager.com\/templates\/workflow-template\">Workflow Template<\/a><\/li>\n<li><a href=\"https:\/\/www.projectmanager.com\/templates\/statement-of-work-template\">Statement of Work Template<\/a><\/li>\n<li><a href=\"https:\/\/www.projectmanager.com\/templates\/work-proposal-template\">Work Proposal Template<\/a><\/li>\n<li><a href=\"https:\/\/www.projectmanager.com\/blog\/work-templates\">9 Work Templates for Excel and Word<\/a><\/li>\n<li><a href=\"https:\/\/www.projectmanager.com\/blog\/work-proposal\">How to Write a Work Proposal (with Example &amp; Template)<\/a><\/li>\n<li><a href=\"https:\/\/www.projectmanager.com\/es\/declaracion-de-trabajo\">\u00bfQu\u00e9 es la declaraci\u00f3n de trabajo de un proyecto?<\/a><\/li>\n<li><a href=\"https:\/\/www.projectmanager.com\/de\/leistungsbeschreibung\">Was ist eine Leistungsbeschreibung? Definition &amp; Beispiele<\/a><\/li>\n<li><a href=\"https:\/\/www.projectmanager.com\/fr\/cahier-des-charges\">Qu\u2019est-ce qu\u2019un cahier des charges ? D\u00e9finition et exemples<\/a><\/li>\n<\/ul>\n<p><em>The statement of work is a foundational document of any project. Once created and approved, you\u2019ll have to create a plan and implement it. That\u2019s where <a href=\"https:\/\/projectmanager.com\/\" rel=\"noopener noreferrer\">ProjectManager<\/a> comes in. Our online project management software provides real-time data to help you manage and track your statement of work. Take it for a test spin and <a href=\"https:\/\/www.projectmanager.com\/freetrial?edition=d\" rel=\"noopener noreferrer\">see how it can help you with this 30-day free trial.<\/a><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>There&#8217;s always plenty of project management paperwork to create, get approved, file and archive. All project documents are important, but&#8230;<br \/><a class=\"excerpt-read-more button blue\" href=\"https:\/\/www.projectmanager.com\/blog\/statement-work-definition-examples\">Read More<\/a><\/p>\n","protected":false},"author":18,"featured_media":64299,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_yoast_wpseo_meta-robots-noindex":0,"_yoast_wpseo_canonical":"","_yoast_wpseo_opengraph-title":"","_yoast_wpseo_opengraph-description":"","_yoast_wpseo_opengraph-image":"","_yoast_wpseo_twitter-title":"","_yoast_wpseo_twitter-description":"","head_code_insert":"<link rel=\"alternate\" hreflang=\"en-us\" href=\"https:\/\/www.projectmanager.com\/blog\/statement-work-definition-examples\"\/>\n<link rel=\"alternate\" hreflang=\"es\" href=\"https:\/\/www.projectmanager.com\/es\/declaracion-de-trabajo\"\/>\n<link rel=\"alternate\" hreflang=\"fr\" href=\"https:\/\/www.projectmanager.com\/fr\/cahier-des-charges\"\/>\n<link rel=\"alternate\" hreflang=\"de\" href=\"https:\/\/www.projectmanager.com\/de\/leistungsbeschreibung\"\/>\n<link rel=\"alternate\" hreflang=\"x-default\" href=\"https:\/\/www.projectmanager.com\/blog\/statement-work-definition-examples\"\/>","footnotes":""},"categories":[195,320,193,131],"tags":[],"class_list":["post-38107","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-planning","category-project-documents","category-project-management","category-blog"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Statement of Work: Definition, Types &amp; Examples<\/title>\n<meta name=\"description\" content=\"A statement of work lays the foundation for the planning &amp; successful project execution. Read more to learn how to write one.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.projectmanager.com\/blog\/statement-work-definition-examples\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"What Is a Statement of Work? Definition &amp; Examples\" \/>\n<meta property=\"og:description\" content=\"A statement of work lays the foundation for the planning &amp; successful project execution. Read more to learn how to write one.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.projectmanager.com\/blog\/statement-work-definition-examples\" \/>\n<meta property=\"og:site_name\" content=\"ProjectManager\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/projectmanage\/\" \/>\n<meta property=\"article:published_time\" content=\"2025-12-15T21:35:43+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-17T18:52:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.projectmanager.com\/wp-content\/uploads\/2022\/09\/IT-Project-Management.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"778\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Peter Landau\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Peter Landau\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"20 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/statement-work-definition-examples#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/statement-work-definition-examples\"},\"author\":{\"name\":\"Peter Landau\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#\\\/schema\\\/person\\\/83c2340d10ac161661864c1938cd4953\"},\"headline\":\"What Is a Statement of Work? Definition &#038; Examples\",\"datePublished\":\"2025-12-15T21:35:43+00:00\",\"dateModified\":\"2026-07-17T18:52:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/statement-work-definition-examples\"},\"wordCount\":4248,\"publisher\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/statement-work-definition-examples#primaryimage\"},\"thumbnailUrl\":\"\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/IT-Project-Management.png\",\"articleSection\":[\"Planning\",\"Project Documents\",\"Project Management\",\"Project Management Blog\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/statement-work-definition-examples\",\"url\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/statement-work-definition-examples\",\"name\":\"Statement of Work: Definition, Types & Examples\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/statement-work-definition-examples#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/statement-work-definition-examples#primaryimage\"},\"thumbnailUrl\":\"\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/IT-Project-Management.png\",\"datePublished\":\"2025-12-15T21:35:43+00:00\",\"dateModified\":\"2026-07-17T18:52:43+00:00\",\"description\":\"A statement of work lays the foundation for the planning & successful project execution. Read more to learn how to write one.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/statement-work-definition-examples#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/statement-work-definition-examples\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/statement-work-definition-examples#primaryimage\",\"url\":\"\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/IT-Project-Management.png\",\"contentUrl\":\"\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/IT-Project-Management.png\",\"width\":1200,\"height\":778,\"caption\":\"IT Project Management\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/statement-work-definition-examples#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.projectmanager.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"What Is a Statement of Work? Definition &#038; Examples\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#website\",\"url\":\"https:\\\/\\\/www.projectmanager.com\\\/\",\"name\":\"ProjectManager\",\"description\":\"The Best Project Management Software for Managing your Projects\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.projectmanager.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#organization\",\"name\":\"ProjectManager\",\"url\":\"https:\\\/\\\/www.projectmanager.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/ProjectManager-Logo-for-Website.png\",\"contentUrl\":\"\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/ProjectManager-Logo-for-Website.png\",\"width\":696,\"height\":696,\"caption\":\"ProjectManager\"},\"image\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/projectmanage\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/projectmanager.com\\\/\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/projectmanagervideos\",\"https:\\\/\\\/en.wikipedia.org\\\/wiki\\\/ProjectManager.com\"],\"description\":\"ProjectManager is a project and portfolio management software that offers online project management tools like Gantt charts, dashboards, kanban boards, task management features and more. With advanced planning and scheduling, automated cost and time tracking, risk analysis and resource management, our platform ensures flawless execution for construction, manufacturing and professional services teams, while providing unbeatable insights at every stage.\",\"legalName\":\"ProjectManager.com, Inc.\",\"foundingDate\":\"2008-01-01\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":\"11\",\"maxValue\":\"50\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#\\\/schema\\\/person\\\/83c2340d10ac161661864c1938cd4953\",\"name\":\"Peter Landau\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7521970efa63d95fa368e8426d2b1e51db76ddf997de4e0377dc781de5d97489?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7521970efa63d95fa368e8426d2b1e51db76ddf997de4e0377dc781de5d97489?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7521970efa63d95fa368e8426d2b1e51db76ddf997de4e0377dc781de5d97489?s=96&d=mm&r=g\",\"caption\":\"Peter Landau\"},\"description\":\"Peter is the Content Editor at ProjectManager.com. He has worked as a writer and editor on print, digital and mobile platforms for both consumer and trade publications.\",\"sameAs\":[\"https:\\\/\\\/pmargo.wpengine.com\",\"https:\\\/\\\/www.linkedin.com\\\/pub\\\/peter-landau\\\/3\\\/572\\\/12\"],\"knowsAbout\":[\"Project management\",\"Project planning\",\"Blogs\"],\"knowsLanguage\":[\"English\"],\"jobTitle\":\"Project Management Expert Writer\",\"worksFor\":\"ProjectManager.com\",\"url\":\"https:\\\/\\\/www.projectmanager.com\\\/author\\\/peterlandau\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Statement of Work: Definition, Types & Examples","description":"A statement of work lays the foundation for the planning & successful project execution. Read more to learn how to write one.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.projectmanager.com\/blog\/statement-work-definition-examples","og_locale":"en_US","og_type":"article","og_title":"What Is a Statement of Work? Definition & Examples","og_description":"A statement of work lays the foundation for the planning & successful project execution. Read more to learn how to write one.","og_url":"https:\/\/www.projectmanager.com\/blog\/statement-work-definition-examples","og_site_name":"ProjectManager","article_publisher":"https:\/\/www.facebook.com\/projectmanage\/","article_published_time":"2025-12-15T21:35:43+00:00","article_modified_time":"2026-07-17T18:52:43+00:00","og_image":[{"width":1200,"height":778,"url":"https:\/\/www.projectmanager.com\/wp-content\/uploads\/2022\/09\/IT-Project-Management.png","type":"image\/png"}],"author":"Peter Landau","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Peter Landau","Est. reading time":"20 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.projectmanager.com\/blog\/statement-work-definition-examples#article","isPartOf":{"@id":"https:\/\/www.projectmanager.com\/blog\/statement-work-definition-examples"},"author":{"name":"Peter Landau","@id":"https:\/\/www.projectmanager.com\/#\/schema\/person\/83c2340d10ac161661864c1938cd4953"},"headline":"What Is a Statement of Work? Definition &#038; Examples","datePublished":"2025-12-15T21:35:43+00:00","dateModified":"2026-07-17T18:52:43+00:00","mainEntityOfPage":{"@id":"https:\/\/www.projectmanager.com\/blog\/statement-work-definition-examples"},"wordCount":4248,"publisher":{"@id":"https:\/\/www.projectmanager.com\/#organization"},"image":{"@id":"https:\/\/www.projectmanager.com\/blog\/statement-work-definition-examples#primaryimage"},"thumbnailUrl":"\/wp-content\/uploads\/2022\/09\/IT-Project-Management.png","articleSection":["Planning","Project Documents","Project Management","Project Management Blog"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.projectmanager.com\/blog\/statement-work-definition-examples","url":"https:\/\/www.projectmanager.com\/blog\/statement-work-definition-examples","name":"Statement of Work: Definition, Types & Examples","isPartOf":{"@id":"https:\/\/www.projectmanager.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.projectmanager.com\/blog\/statement-work-definition-examples#primaryimage"},"image":{"@id":"https:\/\/www.projectmanager.com\/blog\/statement-work-definition-examples#primaryimage"},"thumbnailUrl":"\/wp-content\/uploads\/2022\/09\/IT-Project-Management.png","datePublished":"2025-12-15T21:35:43+00:00","dateModified":"2026-07-17T18:52:43+00:00","description":"A statement of work lays the foundation for the planning & successful project execution. Read more to learn how to write one.","breadcrumb":{"@id":"https:\/\/www.projectmanager.com\/blog\/statement-work-definition-examples#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.projectmanager.com\/blog\/statement-work-definition-examples"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.projectmanager.com\/blog\/statement-work-definition-examples#primaryimage","url":"\/wp-content\/uploads\/2022\/09\/IT-Project-Management.png","contentUrl":"\/wp-content\/uploads\/2022\/09\/IT-Project-Management.png","width":1200,"height":778,"caption":"IT Project Management"},{"@type":"BreadcrumbList","@id":"https:\/\/www.projectmanager.com\/blog\/statement-work-definition-examples#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.projectmanager.com\/"},{"@type":"ListItem","position":2,"name":"What Is a Statement of Work? Definition &#038; Examples"}]},{"@type":"WebSite","@id":"https:\/\/www.projectmanager.com\/#website","url":"https:\/\/www.projectmanager.com\/","name":"ProjectManager","description":"The Best Project Management Software for Managing your Projects","publisher":{"@id":"https:\/\/www.projectmanager.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.projectmanager.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.projectmanager.com\/#organization","name":"ProjectManager","url":"https:\/\/www.projectmanager.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.projectmanager.com\/#\/schema\/logo\/image\/","url":"\/wp-content\/uploads\/2026\/06\/ProjectManager-Logo-for-Website.png","contentUrl":"\/wp-content\/uploads\/2026\/06\/ProjectManager-Logo-for-Website.png","width":696,"height":696,"caption":"ProjectManager"},"image":{"@id":"https:\/\/www.projectmanager.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/projectmanage\/","https:\/\/www.linkedin.com\/company\/projectmanager.com\/","https:\/\/www.youtube.com\/user\/projectmanagervideos","https:\/\/en.wikipedia.org\/wiki\/ProjectManager.com"],"description":"ProjectManager is a project and portfolio management software that offers online project management tools like Gantt charts, dashboards, kanban boards, task management features and more. With advanced planning and scheduling, automated cost and time tracking, risk analysis and resource management, our platform ensures flawless execution for construction, manufacturing and professional services teams, while providing unbeatable insights at every stage.","legalName":"ProjectManager.com, Inc.","foundingDate":"2008-01-01","numberOfEmployees":{"@type":"QuantitativeValue","minValue":"11","maxValue":"50"}},{"@type":"Person","@id":"https:\/\/www.projectmanager.com\/#\/schema\/person\/83c2340d10ac161661864c1938cd4953","name":"Peter Landau","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/7521970efa63d95fa368e8426d2b1e51db76ddf997de4e0377dc781de5d97489?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/7521970efa63d95fa368e8426d2b1e51db76ddf997de4e0377dc781de5d97489?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7521970efa63d95fa368e8426d2b1e51db76ddf997de4e0377dc781de5d97489?s=96&d=mm&r=g","caption":"Peter Landau"},"description":"Peter is the Content Editor at ProjectManager.com. He has worked as a writer and editor on print, digital and mobile platforms for both consumer and trade publications.","sameAs":["https:\/\/pmargo.wpengine.com","https:\/\/www.linkedin.com\/pub\/peter-landau\/3\/572\/12"],"knowsAbout":["Project management","Project planning","Blogs"],"knowsLanguage":["English"],"jobTitle":"Project Management Expert Writer","worksFor":"ProjectManager.com","url":"https:\/\/www.projectmanager.com\/author\/peterlandau"}]}},"_links":{"self":[{"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/posts\/38107","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/users\/18"}],"replies":[{"embeddable":true,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/comments?post=38107"}],"version-history":[{"count":1,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/posts\/38107\/revisions"}],"predecessor-version":[{"id":81777,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/posts\/38107\/revisions\/81777"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/media\/64299"}],"wp:attachment":[{"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/media?parent=38107"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/categories?post=38107"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/tags?post=38107"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}