{"id":49303,"date":"2024-10-28T13:52:31","date_gmt":"2024-10-28T18:52:31","guid":{"rendered":"https:\/\/www.projectmanager.com\/?p=49303"},"modified":"2026-04-24T15:21:51","modified_gmt":"2026-04-24T20:21:51","slug":"implementation-plan","status":"publish","type":"post","link":"https:\/\/www.projectmanager.com\/blog\/implementation-plan","title":{"rendered":"What Is an Implementation Plan? (Template &#038; Example Included)"},"content":{"rendered":"<h2>What Is Project Implementation?<\/h2>\n<p>Project implementation, or project execution, is the process of completing tasks to deliver a project successfully. These tasks are initially described in the project plan, a comprehensive document that covers all areas of project management. However, a secondary action plan, known as an implementation plan, should be created to help team members and project managers better execute and <a href=\"\/guides\/project-tracker\">track the project<\/a>.<\/p>\n<h2>What Is an Implementation Plan?<\/h2>\n<p>An implementation plan is a document that describes the necessary steps for the execution of a project. Implementation plans break down the project implementation process by defining the timeline, the teams and the resources that&#8217;ll be needed. It also outlines how the project will be executed, monitored and completed. An implementation is a <a href=\"https:\/\/www.projectmanager.com\/blog\/tips-for-project-roadmap\">roadmap<\/a> for the project team, showing the necessary steps to reach the goals and deliverables within a specified timeframe and budget.<\/p>\n<p>An implementation plan is commonly made of up certain key components. It opens with a brief project overview, then goes into the goals and objectives of the project. There is a detailed breakdown of the project tasks, and an outline of its timeline and resource allocation. The roles and responsibilities of the team members, stakeholders and external partners are defined. The project implementation also includes a <a href=\"https:\/\/www.projectmanager.com\/blog\/risk-management-plan\">risk management plan<\/a>, how the project will be monitored and evaluated, a communication plan and a budget.<\/p>\n<div class=\"template-download-holder\">\n\t<div class=\"template-download-image-holder\">\n\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"900\" src=\"\/wp-content\/uploads\/2023\/10\/Implementation-Plan-Template-Excel-image.jpg\" class=\"attachment-large size-large\" alt=\"\" srcset=\"\/wp-content\/uploads\/2023\/10\/Implementation-Plan-Template-Excel-image.jpg 1600w, \/wp-content\/uploads\/2023\/10\/Implementation-Plan-Template-Excel-image-600x338.jpg 600w, \/wp-content\/uploads\/2023\/10\/Implementation-Plan-Template-Excel-image-300x169.jpg 300w, \/wp-content\/uploads\/2023\/10\/Implementation-Plan-Template-Excel-image-768x432.jpg 768w, \/wp-content\/uploads\/2023\/10\/Implementation-Plan-Template-Excel-image-1536x864.jpg 1536w, \/wp-content\/uploads\/2023\/10\/Implementation-Plan-Template-Excel-image-450x253.jpg 450w, \/wp-content\/uploads\/2023\/10\/Implementation-Plan-Template-Excel-image-384x216.jpg 384w, \/wp-content\/uploads\/2023\/10\/Implementation-Plan-Template-Excel-image-800x451.jpg 800w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/>\t<\/div><p class=\"intro\">Get your free<\/p>\n<h3>Implementation Plan Template<\/h3>\n<p class=\"subtitle\">\n\tUse this free Implementation Plan Template to manage your projects better.<\/p>\n\t<a class=\"button green\" href=\"https:\/\/www.projectmanager.com\/templates\/implementation-plan-template\">Get the template<\/a>\n<\/div> \n\n<p>&nbsp;<\/p>\n<h3>Implementation Plan vs. Project Plan<\/h3>\n<p>A <a href=\"\/guides\/project-planning\">project plan<\/a> is a comprehensive project management document that should describe everything about your project, including the project schedule, project budget, scope management plan, risk management plan, stakeholder management plan and other important components. An implementation plan, on the other hand, is a simplified version of your project plan that includes only the information that\u2019s needed by the team members who will actually participate in the project execution phase, such as their roles, responsibilities, daily tasks and deadlines.<\/p>\n<h3>Execute Implementation Plans Online with ProjectManager<\/h3>\n<p>Project management software like <a href=\"\/\">ProjectManager<\/a> greatly simplifies the implementation planning process. Schedule and execute your implementation plan with our robust online Gantt charts. Then, use our other project views with real-time data to keep the plan on track.<\/p>\n<ul>\n<li>Set baselines, link dependencies and filter for the critical path to keep plans aligned<\/li>\n<li>Collaborate on multiple project views like sheets, task lists, kanban boards and calendars<\/li>\n<li>Track costs, resources and progress in real time with custom dashboards and reports. <a href=\"https:\/\/www.projectmanager.com\/freetrial?edition=d\">Try it free<\/a><\/li>\n<\/ul>\n<figure id=\"attachment_63413\" aria-describedby=\"caption-attachment-63413\" style=\"width: 1554px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.projectmanager.com\/freetrial?edition=d\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-63413 size-full\" src=\"\/wp-content\/uploads\/2022\/07\/construction-gantt-resources-costs-150-CTA-BUTTON-1.jpg\" alt=\"ProjectManager's Gantt chart is great for monitoring implementation plans\" width=\"1554\" height=\"831\" srcset=\"\/wp-content\/uploads\/2022\/07\/construction-gantt-resources-costs-150-CTA-BUTTON-1.jpg 1554w, \/wp-content\/uploads\/2022\/07\/construction-gantt-resources-costs-150-CTA-BUTTON-1-600x321.jpg 600w, \/wp-content\/uploads\/2022\/07\/construction-gantt-resources-costs-150-CTA-BUTTON-1-300x160.jpg 300w, \/wp-content\/uploads\/2022\/07\/construction-gantt-resources-costs-150-CTA-BUTTON-1-768x411.jpg 768w, \/wp-content\/uploads\/2022\/07\/construction-gantt-resources-costs-150-CTA-BUTTON-1-1536x821.jpg 1536w, \/wp-content\/uploads\/2022\/07\/construction-gantt-resources-costs-150-CTA-BUTTON-1-450x241.jpg 450w\" sizes=\"auto, (max-width: 1554px) 100vw, 1554px\" \/><\/a><figcaption id=\"caption-attachment-63413\" class=\"wp-caption-text\">Create and execute an implementation plan on ProjectManager&#8217;s Gantt chart. <a href=\"\/software\/gantt-chart\">Learn more<\/a><\/figcaption><\/figure>\n<h2 id=\"section-1\">When Should an Implementation Plan Be Used?<\/h2>\n<p>An implementation plan is used when the project moves into the execution phase, but its development begins prior to that. In fact, the first seeds of a project implementation plan are planted in the initiation phase when the need for <a href=\"https:\/\/www.projectmanager.com\/blog\/great-project-documentation\">such a document<\/a> is identified.<\/p>\n<p>During the planning phase is when the implementation plan for the project is primarily developed. All the key components are defined and stakeholders are included in the process to ensure their input is incorporated. When the project is executed, the plan will be put to use in the project\u2019s day-to-day operations: this includes the monitoring and controlling phase as it occurs parallel to execution. Even in closing a project, the plan is reviewed to evaluate the project\u2019s success.<\/p>\n<h2 id=\"section-2\">Why Is Implementation Planning Important?<\/h2>\n<p>There are a number of reasons why a project implementation plan is important. The fact that it\u2019s a roadmap for the project team to follow as they execute is reason enough to stress its importance, but that\u2019s only one. Here are some other reasons to use this plan in projects.<\/p>\n<ul>\n<li><strong>Allows Project Teams to Estimate Costs Accurately:<\/strong> By identifying necessary resources, such as materials and personnel, the project manager is able to better <a href=\"https:\/\/www.projectmanager.com\/blog\/resource-forecasting\">forecast project costs<\/a>. The plan also includes a detailed task breakdown, which allows for a granular analysis of costs. A well-defined timeline leads to more precise cost calculations, too.<\/li>\n<li><strong>Helps Avoid Scope Creep:<\/strong> <a href=\"https:\/\/www.projectmanager.com\/blog\/5-ways-to-avoid-scope-creep\">Scope creep<\/a> is when a project\u2019s scope grows beyond its original objects. The project plan for implementation helps to avoid this by setting clear objectives from the outset and ensuring all team members understand what is included in the project scope. This detailed scope definition allows everyone to know when that boundary is crossed.<\/li>\n<li><strong>Facilitates the Project Scheduling Process:<\/strong> The plan helps with project scheduling by breaking down tasks, making it easier to identify what needs to be done and in what order. This leads to a more realistic timeline for the project. The implementation plan also takes into account <a href=\"https:\/\/www.projectmanager.com\/training\/estimate-tasks-and-dependencies\">dependencies<\/a> and resource availability, which ensures the schedule runs smoothly and stays on track.<\/li>\n<\/ul>\n<h2 id=\"section-3\">Key Steps In Project Implementation<\/h2>\n<p>Here are some of the key steps that you must oversee as a project manager during the <a href=\"https:\/\/www.projectmanager.com\/blog\/project-execution\">project execution phase<\/a>. Your project implementation plan should have the necessary components to help you achieve these steps.<\/p>\n<h3>1. Communicate Goals and Objectives<\/h3>\n<p>Once you&#8217;ve outlined the project goals and objectives, the next step is to ensure that the team understands them. For the project to succeed, there must be buy-in from the project team. A meeting is a good way to communicate this, though having <a href=\"https:\/\/www.projectmanager.com\/blog\/great-project-documentation\">project documents<\/a> that they can refer to is also viable.<\/p>\n<h3>2. Define the Scope of Work<\/h3>\n<p>This critical step identifies project objectives, outlines goals and gathers requirements, including expectations and any constraints that might affect the project. This is when deliverables for the project are listed, boundaries of what\u2019s in and out of scope are defined and a work breakdown structure is used to identify all tasks and subtasks. Resources are also identified, success criteria carted and ensuring that the scope is communicated clearly to the team.<\/p>\n<h3>3. Estimate Resource Requirements<\/h3>\n<p>Resource requirements are first identified in the scope of work and now those resources are further defined. This starts with a listing of all project tasks and then determining the resource types needed, such as human, material, equipment and financial. Availability of those resources is then checked and quantities forecasted. This will be reviewed with stakeholders.<\/p>\n<h3>4. Identify Potential Risks<\/h3>\n<p>Risks are unexpected events, but they can be managed proactively by establishing a risk management team and defining risk criteria. The project team should brainstorm on what risks could arise during the project, list these and categorize them in terms of their impact and probability of occurrence. At this point, the risks can be prioritized to allow teams to know how to respond to them.<\/p>\n<h3>5. Define Team Roles and Responsibilities<\/h3>\n<p>The project manager will define the roles and responsibilities and communicate them to the <a href=\"https:\/\/www.projectmanager.com\/blog\/assemble-a-project-team\">project team<\/a>. They should understand what they&#8217;re expected to do and who they can reach out to with questions about their work, all of which leads to a smooth-running project.<\/p>\n<h3>6. Establish the Success Criteria for Deliverables<\/h3>\n<p>The <a href=\"\/blog\/project-deliverable\">project deliverables<\/a> need to meet quality standards, and to do this there must be a success criteria for handing off these deliverables. You want to have something in place to determine if the deliverable is what it\u2019s supposed to be. The measurement is called a success criteria and it applies to any deliverable, whether it\u2019s tangible or intangible.<\/p>\n<h3>7. Schedule Work on a Project Timeline<\/h3>\n<p>All projects require a <a href=\"\/guides\/project-scheduling\">schedule<\/a>, which at its most basic is a start date and an end date for your project. In between those two points, you\u2019ll have phases and tasks, which also have start and finish dates. To manage these deadlines, use a project timeline to visually map everything in one place.<\/p>\n<h3>8. Monitor Cost, Time and Performance<\/h3>\n<p>To make sure that you\u2019re keeping to your schedule and budget, you need to keep a close eye on the project during the execution phase. Some of the things you should monitor are your costs, time and performance. Costs refer to your <a href=\"https:\/\/www.projectmanager.com\/training\/create-and-manage-project-budget\">budget<\/a>, time refers to your schedule and performance impacts both as well as quality. By keeping track of these metrics, you can make adjustments to stay on schedule and on budget.<\/p>\n<h3>9. Report to Project Stakeholders<\/h3>\n<p>While the project manager is monitoring the project, the stakeholders, who have a vested interest in the project, are also going to want to stay informed. To manage their expectations and show them that the project is hitting all its milestones, you\u2019ll want to have <a href=\"https:\/\/www.projectmanager.com\/blog\/4-types-of-project-reports\">project reports<\/a>, such as project status reports. These can then be presented to the stakeholders regularly to keep them updated.<\/p>\n<a class=\"trapdoor\" href=\"https:\/\/learn.projectmanager.com\/pm-101-ebook\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-73861 size-full\" src=\"\/wp-content\/uploads\/2025\/02\/PM-101-eBook-banner-ad.jpg\" alt=\"PM 101 eBook banner-ad\" width=\"2021\" height=\"521\" srcset=\"\/wp-content\/uploads\/2025\/02\/PM-101-eBook-banner-ad.jpg 2021w, \/wp-content\/uploads\/2025\/02\/PM-101-eBook-banner-ad-600x155.jpg 600w, \/wp-content\/uploads\/2025\/02\/PM-101-eBook-banner-ad-1600x412.jpg 1600w, \/wp-content\/uploads\/2025\/02\/PM-101-eBook-banner-ad-300x77.jpg 300w, \/wp-content\/uploads\/2025\/02\/PM-101-eBook-banner-ad-768x198.jpg 768w, \/wp-content\/uploads\/2025\/02\/PM-101-eBook-banner-ad-1536x396.jpg 1536w, \/wp-content\/uploads\/2025\/02\/PM-101-eBook-banner-ad-450x116.jpg 450w\" sizes=\"auto, (max-width: 2021px) 100vw, 2021px\" \/><\/a>\n<h2 id=\"section-4\">Free Implementation Plan Template<\/h2>\n<p>Use this <a href=\"https:\/\/www.projectmanager.com\/templates\/implementation-plan-template\">implementation plan template for Excel<\/a> to define your strategy, scope, resource plan, timeline and more. It&#8217;s the ideal way to begin your implementation process. Download your template today.<\/p>\n<figure id=\"attachment_61430\" aria-describedby=\"caption-attachment-61430\" style=\"width: 1828px\" class=\"wp-caption aligncenter\"><a href=\"\/templates\/implementation-plan-template\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-61430 size-full\" src=\"\/wp-content\/uploads\/2021\/08\/Implementation-Plan-Screenshot.jpg\" alt=\"Implementation plan template for Excel\" width=\"1828\" height=\"569\" srcset=\"\/wp-content\/uploads\/2021\/08\/Implementation-Plan-Screenshot.jpg 1828w, \/wp-content\/uploads\/2021\/08\/Implementation-Plan-Screenshot-600x187.jpg 600w, \/wp-content\/uploads\/2021\/08\/Implementation-Plan-Screenshot-1600x498.jpg 1600w, \/wp-content\/uploads\/2021\/08\/Implementation-Plan-Screenshot-300x93.jpg 300w, \/wp-content\/uploads\/2021\/08\/Implementation-Plan-Screenshot-768x239.jpg 768w, \/wp-content\/uploads\/2021\/08\/Implementation-Plan-Screenshot-1536x478.jpg 1536w, \/wp-content\/uploads\/2021\/08\/Implementation-Plan-Screenshot-450x140.jpg 450w\" sizes=\"auto, (max-width: 1828px) 100vw, 1828px\" \/><\/a><figcaption id=\"caption-attachment-61430\" class=\"wp-caption-text\">Free implementation plan template for Excel <a href=\"https:\/\/www.projectmanager.com\/templates\/implementation-plan-template\">Download now<\/a><\/figcaption><\/figure>\n<h2 id=\"section-5\">What Are the Key Components of an Implementation Plan?<\/h2>\n<p>There\u2019s no standard one-size-fits-all solution when it comes to creating your implementation plan. However, we\u2019ve created an implementation plan outline for your projects. Here are its components.<\/p>\n<ul>\n<li><strong>Project goals &amp; objectives: <\/strong>The project goal is the ultimate goal of your project, while the objectives are the key milestones or achievements that must be completed to reach it.<\/li>\n<li><strong>Success criteria: <\/strong>The project manager must reach an agreement with stakeholders to define the project success criteria.<\/li>\n<li><strong>Project deliverables:<\/strong> Project deliverables are tangible or intangible outputs from project tasks.<\/li>\n<li><strong>Scope statement: <\/strong>The scope statement briefly describes your project scope, which can be simply defined as the project work to be performed.<\/li>\n<li><strong>Resource plan: <\/strong>Create a simple <a href=\"\/guides\/resource-management\">resource plan<\/a> that outlines the human resources, equipment and materials needed for your project.<\/li>\n<li><strong>Risk analysis: <\/strong>Use a risk assessment tool like a SWOT analysis or risk register. There are different tools with different levels of detail for your risk analysis.<\/li>\n<li><strong>Implementation timeline: <\/strong>Any implementation plan needs a clear project timeline to be executed properly. You should use an advanced tool such as a <a href=\"\/guides\/gantt-chart\">Gantt chart<\/a> to create one.<\/li>\n<li><strong>Implementation plan milestones: <\/strong>You need to identify key milestones of your implementation plan so that you can easily keep track of its progress.<\/li>\n<li><strong>Team roles &amp; responsibilities: <\/strong>The implementation plan won\u2019t execute itself. You\u2019ll need to assign roles and responsibilities to your team members.<\/li>\n<li><strong>Implementation plan metrics: <\/strong>You\u2019ll need KPIs, <a href=\"https:\/\/www.projectmanager.com\/blog\/what-is-okr\">OKRs<\/a> or any other performance metrics you can use to control the progress of your implementation plan.<\/li>\n<\/ul>\n<div class=\"mceTemp\"><\/div>\n<figure id=\"attachment_41297\" aria-describedby=\"caption-attachment-41297\" style=\"width: 600px\" class=\"wp-caption aligncenter\"><a href=\"\/templates\/project-management-dashboard\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-41297 size-medium\" src=\"\/wp-content\/uploads\/2016\/03\/Project-Dashboard-template-UPDATE-600x262.png\" alt=\"Project Dashboard Template\" width=\"600\" height=\"262\" srcset=\"\/wp-content\/uploads\/2016\/03\/Project-Dashboard-template-UPDATE-600x262.png 600w, \/wp-content\/uploads\/2016\/03\/Project-Dashboard-template-UPDATE-300x131.png 300w, \/wp-content\/uploads\/2016\/03\/Project-Dashboard-template-UPDATE-1600x698.png 1600w, \/wp-content\/uploads\/2016\/03\/Project-Dashboard-template-UPDATE-450x196.png 450w, \/wp-content\/uploads\/2016\/03\/Project-Dashboard-template-UPDATE.png 1657w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><figcaption id=\"caption-attachment-41297\" class=\"wp-caption-text\">Free project dashboard template <a href=\"\/templates\/project-management-dashboard\">Download now<\/a><\/figcaption><\/figure>\n<h2 id=\"section-6\">How to Write an Implementation Plan<\/h2>\n<p>Follow these steps to create an implementation plan for your project or business. You can also consider using <a href=\"\/\">project management software<\/a> like ProjectManager to help you with the implementation process.<\/p>\n<h3>1. Review Your Project Plan<\/h3>\n<p>Start by identifying what you\u2019ll need for the execution of your implementation plan:<\/p>\n<ul>\n<li>What teams need to be involved to achieve the strategic goals?<\/li>\n<li>How long will it take to make the strategic goals happen?<\/li>\n<li>What resources should be <a href=\"\/blog\/resource-allocation\">allocated<\/a>?<\/li>\n<\/ul>\n<p>By interviewing stakeholders, key partners, customers and team members, you can determine the most crucial assignments needed and prioritize them accordingly. It\u2019s also at this stage that you should list out all the goals you\u2019re looking to achieve to cross-embed the strategic plan with the implementation plan. Everything must tie back to that <a href=\"https:\/\/www.projectmanager.com\/blog\/strategic-planning-models\">strategic plan<\/a> in order for your implementation plan to work.<\/p>\n<h3>2. Map Out Assumptions and Risks<\/h3>\n<p>This acts as an extension to the research and discovery phase, but it\u2019s also important to point out assumptions and <a href=\"https:\/\/www.projectmanager.com\/training\/how-to-analyze-risks-project\">risks<\/a> in your implementation plan. This can include anything that might affect the execution of the implementation plan, such as paid time off or holidays you didn\u2019t factor into your <a href=\"\/guides\/project-timeline\">timeline<\/a>, budget constraints, losing personnel, market instability or even tools that require repair before your implementation can commence.<\/p>\n<figure id=\"attachment_66915\" aria-describedby=\"caption-attachment-66915\" style=\"width: 600px\" class=\"wp-caption aligncenter\"><a href=\"\/templates\/risk-tracking-template\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-66915 size-medium\" src=\"\/wp-content\/uploads\/2023\/05\/risk-register-example-600x99.png\" alt=\"risk register example\" width=\"600\" height=\"99\" srcset=\"\/wp-content\/uploads\/2023\/05\/risk-register-example-600x99.png 600w, \/wp-content\/uploads\/2023\/05\/risk-register-example-300x50.png 300w, \/wp-content\/uploads\/2023\/05\/risk-register-example-768x127.png 768w, \/wp-content\/uploads\/2023\/05\/risk-register-example-450x75.png 450w, \/wp-content\/uploads\/2023\/05\/risk-register-example.png 1496w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><figcaption id=\"caption-attachment-66915\" class=\"wp-caption-text\">Free risk tracking template <a href=\"\/templates\/risk-tracking-template\">Download now<\/a><\/figcaption><\/figure>\n<h3>3. Identify Task Owners<\/h3>\n<p>Each activity in your implementation plan must include a primary task owner or champion to be the owner of it. For tasks to be properly assigned, this champion will need to do the delegating. This means that they ensure that all systems are working as per usual, keep track of their teams\u2019 productivity and more. <a href=\"https:\/\/projectmanager.com\/software\/planning\">Project planning software<\/a> is practically essential for this aspect.<\/p>\n<h3>4. Define Project Tasks<\/h3>\n<p>Next, you need to finalize all the little activities to round out your plan. Start by asking yourself the following questions:<\/p>\n<ul>\n<li>What are the steps or milestones that make up the plan?<\/li>\n<li>What are the activities needed to complete each step?<\/li>\n<li>Who needs to be involved in the plan?<\/li>\n<li>What are the stakeholder requirements?<\/li>\n<li>What resources should be allocated?<\/li>\n<li>Are there any <a href=\"https:\/\/projectmanager.com\/blog\/milestones-project-management\">milestones<\/a> we need to list?<\/li>\n<li>What are the risks involved based on the assumptions we notated?<\/li>\n<li>Are there any dependencies for any of the tasks?<\/li>\n<\/ul>\n<p>Once all activities are outlined, all resources are listed and all stakeholders have approved (but no actions have been taken just yet), you can consider your implementation plan complete and ready for execution.<\/p>\n<h2 id=\"section-7\">Implementation Plan Example<\/h2>\n<p>Implementation plans are used by companies across industries on a daily basis. Here\u2019s a simple project implementation plan example we\u2019ve created using <a href=\"\/\">ProjectManager<\/a> to help you better understand how implementation plans work. Let\u2019s imagine a software development team is creating a new app.<\/p>\n<ul>\n<li><strong>Project goal:<\/strong> Create a new app<\/li>\n<li><strong>Project objectives:<\/strong> All the project deliverables that must be achieved to reach that ultimate goal.<\/li>\n<li><strong>Success criteria:<\/strong> The development team needs to communicate with the project stakeholders and agree upon success criteria.<\/li>\n<li><strong>Scope statement:<\/strong> Here\u2019s where the development team will document all the work needed to develop the app. That work is broken down into tasks, which are known as user stories in product and software development. Here, the team must also note all the exceptions, which means everything that won\u2019t be done.<\/li>\n<li><strong>Resource plan:<\/strong> In this case, the resources are all the professionals involved in the software development process, as well as any equipment needed by the team.<\/li>\n<li><strong>Risk analysis:<\/strong> Using a risk register, the product manager can list all the potential risks that might affect the app development process.<\/li>\n<li><strong>Timeline, milestones and metrics:<\/strong> Here\u2019s an image of an implementation plan timeline we created using ProjectManager\u2019s Gantt chart view. The diamond symbols represent the implementation plan milestones.<\/li>\n<li><strong>Team roles &amp; responsibilities:<\/strong> Similarly, we used a Gantt chart to assign implementation plan tasks to team members according to their roles and responsibilities.<\/li>\n<\/ul>\n<figure id=\"attachment_69955\" aria-describedby=\"caption-attachment-69955\" style=\"width: 1919px\" class=\"wp-caption aligncenter\"><a href=\"\/software\/project-planning\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-69955 size-full\" src=\"\/wp-content\/uploads\/2023\/02\/operations-implementation-gantt-chart-150.png\" alt=\"Implementation plan example in ProjectManager\" width=\"1919\" height=\"944\" srcset=\"\/wp-content\/uploads\/2023\/02\/operations-implementation-gantt-chart-150.png 1919w, \/wp-content\/uploads\/2023\/02\/operations-implementation-gantt-chart-150-600x295.png 600w, \/wp-content\/uploads\/2023\/02\/operations-implementation-gantt-chart-150-1600x787.png 1600w, \/wp-content\/uploads\/2023\/02\/operations-implementation-gantt-chart-150-300x148.png 300w, \/wp-content\/uploads\/2023\/02\/operations-implementation-gantt-chart-150-768x378.png 768w, \/wp-content\/uploads\/2023\/02\/operations-implementation-gantt-chart-150-1536x756.png 1536w, \/wp-content\/uploads\/2023\/02\/operations-implementation-gantt-chart-150-450x221.png 450w\" sizes=\"auto, (max-width: 1919px) 100vw, 1919px\" \/><\/a><figcaption id=\"caption-attachment-69955\" class=\"wp-caption-text\">Implementation plan example in ProjectManager<\/figcaption><\/figure>\n<h2>More Free Project Implementation Templates<\/h2>\n<p>There are many <a href=\"https:\/\/www.projectmanager.com\/blog\/free-pmo-templates-excel-word\">free project management templates for Excel and Word<\/a> that can be downloaded for free from our site. These templates cover every aspect of managing a project across multiple industries. Here are just a few examples that can help with project implementation.<\/p>\n<h3><a href=\"https:\/\/www.projectmanager.com\/templates\/gantt-chart-template\">Gantt Chart Template<\/a><\/h3>\n<p>A Gantt chart is a classic project management scheduling tool that organizes tasks on a timeline to show the entire project. This free Gantt chart template for Excel helps project managers create a realistic timeline for their projects and, therefore, is crucial for the development of an implementation plan.<\/p>\n<h3><a href=\"https:\/\/www.projectmanager.com\/templates\/raci-matrix-template\">RACI Chart Template<\/a><\/h3>\n<p>Another aspect of the project implementation is defining the roles and responsibilities of the project team. This free RACI chart template for Excel helps everyone know what they\u2019re responsible for by breaking roles down to responsible, accountable, consulted and informed.<\/p>\n<h3><a href=\"https:\/\/www.projectmanager.com\/templates\/project-budget-template\">Project Budget Template<\/a><\/h3>\n<p>An accurate budget must be determined at the very beginning of the project. Using this free project budget template for Excel will help project managers forecast costs realistically. It captures labor costs, consultant fees, raw materials, software licenses, trave and even telephone charges, office space and equipment rental, general administrative costs and insurance.<\/p>\n<h2 id=\"section-8\">Benefits of an Implementation Plan for the Project Implementation Process<\/h2>\n<p>The implementation plan plays a large role in the success of your overall strategic plan. But more than that, communicating both your strategic plan and the implementation of it therein to your team members helps them feel as if they have a sense of ownership within the company\u2019s long-term direction.<\/p>\n<h3>Increased Cooperation<\/h3>\n<p>An implementation plan that\u2019s well communicated also helps to <a href=\"https:\/\/www.projectmanager.com\/team-management\">increase cooperation<\/a> across all teams through all the steps of the implementation process. It\u2019s easy to work in a silo\u2014you know exactly what your daily process is and how to execute it. But reaching across the aisle and making sure your team is aligned on the project goals that you\u2019re also trying to meet? That\u2019s another story entirely. With an implementation plan in place, it helps to bridge the divide just a little easier.<\/p>\n<h3>Buy-In<\/h3>\n<p>Additionally, with an implementation plan that\u2019s thoroughly researched and well-defined, you can <a href=\"https:\/\/projectmanager.com\/stakeholder-management\">ensure buy-in from stakeholders<\/a> and key partners involved in the project. And no matter which milestone you\u2019re at, you can continue to get that buy-in time and time again with proper documentation.<\/p>\n<h3>Guidance<\/h3>\n<p>At the end of the day, the biggest benefit of an implementation plan is that it makes it that much easier for the company to meet its long-term goals. When everyone across all teams knows exactly what you want to accomplish and how to do it, it\u2019s easy to make it happen.<\/p>\n<h2>Implementation Plan FAQ<\/h2>\n<p>There&#8217;s more to know about implementation plans. It&#8217;s a big subject and we&#8217;ve tried to be thorough as possible, but if you have any further questions, hopefully we&#8217;ve answered them below.<\/p>\n<h3>What Is the Difference Between an Action Plan and an Implementation Plan?<\/h3>\n<p>The main difference between an action plan and an implementation plan is that an action plan focuses exclusively on describing work packages and tasks, while the implementation plan is more holistic and addresses other variables that affect the implementation process such as risks, resources and team roles &amp; responsibilities.<\/p>\n<h3>What Is an Implementation Plan in Business?<\/h3>\n<p>A business implementation plan is the set of steps that a company follows to execute its strategic plan and achieve all the business goals that are described there.<\/p>\n<h3>What Is an Implementation Plan in Project Management?<\/h3>\n<p>Implementation plans have many uses in project management. They\u2019re a planning tool that allows project managers to control smaller projects within their project plan. For example, they might need an implementation plan to execute risk mitigation actions, change requests or produce specific deliverables.<\/p>\n<h2>How to Make an Implementation Plan With ProjectManager<\/h2>\n<p>Creating and managing an implementation plan is a huge responsibility and one that requires diligence, patience and great organizational skills.<\/p>\n<p>When it comes to a project implementation plan, there are many ways to make one that\u2019s best suited for your team. With <a href=\"https:\/\/projectmanager.com\/\">ProjectManager<\/a>, you get access to both agile and waterfall planning so you can plan in sprints for large or small projects, track issues and collaborate easily. Try <a href=\"https:\/\/projectmanager.com\/software\/kanban\">kanban boards<\/a> for managing backlogs or for making workflows in departments.<\/p>\n<a href=\"\/software\/kanban\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-71969 size-full\" src=\"\/wp-content\/uploads\/2024\/10\/IT-project-plan-on-a-kanban-board-software-development-2024.png\" alt=\"Kanban board for managing the implementation process\" width=\"2559\" height=\"1393\" srcset=\"\/wp-content\/uploads\/2024\/10\/IT-project-plan-on-a-kanban-board-software-development-2024.png 2559w, \/wp-content\/uploads\/2024\/10\/IT-project-plan-on-a-kanban-board-software-development-2024-600x327.png 600w, \/wp-content\/uploads\/2024\/10\/IT-project-plan-on-a-kanban-board-software-development-2024-1600x871.png 1600w, \/wp-content\/uploads\/2024\/10\/IT-project-plan-on-a-kanban-board-software-development-2024-300x163.png 300w, \/wp-content\/uploads\/2024\/10\/IT-project-plan-on-a-kanban-board-software-development-2024-768x418.png 768w, \/wp-content\/uploads\/2024\/10\/IT-project-plan-on-a-kanban-board-software-development-2024-1536x836.png 1536w, \/wp-content\/uploads\/2024\/10\/IT-project-plan-on-a-kanban-board-software-development-2024-2048x1115.png 2048w, \/wp-content\/uploads\/2024\/10\/IT-project-plan-on-a-kanban-board-software-development-2024-450x245.png 450w\" sizes=\"auto, (max-width: 2559px) 100vw, 2559px\" \/><\/a>\n<p>Switching up the activities after a milestone meeting with stakeholders? You can easily update your implementation plan with our software features. Add new tasks, set due dates, and track how far along your team is on their current activities.<\/p>\n<h2>Related Project Planning Content<\/h2>\n<ul>\n<li><a href=\"https:\/\/www.projectmanager.com\/blog\/research-plan\">How to Write a Research Plan for a Project<\/a><\/li>\n<li><a href=\"https:\/\/www.projectmanager.com\/blog\/project-plan-examples\">8 Project Plan Examples (Templates Included)<\/a><\/li>\n<li><a href=\"https:\/\/www.projectmanager.com\/blog\/schedule-planning\">What Is Schedule Planning in Project Management?<\/a><\/li>\n<li><a href=\"https:\/\/www.projectmanager.com\/blog\/project-planning-phase\">Project Planning Phase: Key Activities and Outcomes<\/a><\/li>\n<li><a href=\"https:\/\/www.projectmanager.com\/blog\/project-management-plan-example\">Project Management Plan Example: In-Depth Analysis with Pictures<\/a><\/li>\n<li><a href=\"https:\/\/www.projectmanager.com\/es\/plan-de-implementacion\">\u00bfQu\u00e9 es un plan de implementaci\u00f3n? ejemplo y plantilla gratis<\/a><\/li>\n<\/ul>\n<p><em>Implementation plans are the backbone of an organization\u2019s strategic overall plan. With ProjectManager, give your organization the project management software they need to gain insight into all resources needed, view activities on their lists and collaborate with ease. <a href=\"https:\/\/www.projectmanager.com\/freetrial?edition=d\">Sign up for our free 30-day trial today.<\/a><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>What Is Project Implementation? Project implementation, or project execution, is the process of completing tasks to deliver a project successfully&#8230;.<br \/><a class=\"excerpt-read-more button blue\" href=\"https:\/\/www.projectmanager.com\/blog\/implementation-plan\">Read More<\/a><\/p>\n","protected":false},"author":45,"featured_media":49446,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_yoast_wpseo_meta-robots-noindex":0,"_yoast_wpseo_canonical":"","_yoast_wpseo_opengraph-title":"","_yoast_wpseo_opengraph-description":"","_yoast_wpseo_opengraph-image":"","_yoast_wpseo_twitter-title":"","_yoast_wpseo_twitter-description":"","head_code_insert":"<link rel=\"alternate\" hreflang=\"en-us\" href=\"https:\/\/www.projectmanager.com\/blog\/implementation-plan\" \/>\r\n<link rel=\"alternate\" hreflang=\"es\" href=\"https:\/\/www.projectmanager.com\/es\/plan-de-implementacion\" \/>\r\n<link rel=\"alternate\" hreflang=\"x-default\" href=\"https:\/\/www.projectmanager.com\/blog\/implementation-plan\" \/>","footnotes":""},"categories":[195,193,131],"tags":[],"class_list":["post-49303","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-planning","category-project-management","category-blog"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>What Is an Implementation Plan &amp; How Do I Create One? (Example Included)<\/title>\n<meta name=\"description\" content=\"Implementation plans are key to your project&#039;s success. Learn what they are, how to create one, &amp; how ProjectManager can keep yours on track!\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.projectmanager.com\/blog\/implementation-plan\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"What Is an Implementation Plan? (Template &amp; Example Included)\" \/>\n<meta property=\"og:description\" content=\"Implementation plans are key to your project&#039;s success. Learn what they are, how to create one, &amp; how ProjectManager can keep yours on track!\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.projectmanager.com\/blog\/implementation-plan\" \/>\n<meta property=\"og:site_name\" content=\"ProjectManager\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/projectmanage\/\" \/>\n<meta property=\"article:published_time\" content=\"2024-10-28T18:52:31+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-24T20:21:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.projectmanager.com\/wp-content\/uploads\/2019\/12\/191230_Blog_Feature_Implementation.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"William Malsam\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@Malsam_PM\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"William Malsam\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/implementation-plan#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/implementation-plan\"},\"author\":{\"name\":\"William Malsam\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#\\\/schema\\\/person\\\/3483ea14874d0b9e9a9532f8e4899a3c\"},\"headline\":\"What Is an Implementation Plan? (Template &#038; Example Included)\",\"datePublished\":\"2024-10-28T18:52:31+00:00\",\"dateModified\":\"2026-04-24T20:21:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/implementation-plan\"},\"wordCount\":3286,\"publisher\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/implementation-plan#primaryimage\"},\"thumbnailUrl\":\"\\\/wp-content\\\/uploads\\\/2019\\\/12\\\/191230_Blog_Feature_Implementation.jpg\",\"articleSection\":[\"Planning\",\"Project Management\",\"Project Management Blog\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/implementation-plan\",\"url\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/implementation-plan\",\"name\":\"What Is an Implementation Plan & How Do I Create One? (Example Included)\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/implementation-plan#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/implementation-plan#primaryimage\"},\"thumbnailUrl\":\"\\\/wp-content\\\/uploads\\\/2019\\\/12\\\/191230_Blog_Feature_Implementation.jpg\",\"datePublished\":\"2024-10-28T18:52:31+00:00\",\"dateModified\":\"2026-04-24T20:21:51+00:00\",\"description\":\"Implementation plans are key to your project's success. Learn what they are, how to create one, & how ProjectManager can keep yours on track!\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/implementation-plan#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/implementation-plan\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/implementation-plan#primaryimage\",\"url\":\"\\\/wp-content\\\/uploads\\\/2019\\\/12\\\/191230_Blog_Feature_Implementation.jpg\",\"contentUrl\":\"\\\/wp-content\\\/uploads\\\/2019\\\/12\\\/191230_Blog_Feature_Implementation.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Feature Implementation\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/implementation-plan#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.projectmanager.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"What Is an Implementation Plan? (Template &#038; Example Included)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#website\",\"url\":\"https:\\\/\\\/www.projectmanager.com\\\/\",\"name\":\"ProjectManager\",\"description\":\"The Best Project Management Software for Managing your Projects\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.projectmanager.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#organization\",\"name\":\"ProjectManager\",\"url\":\"https:\\\/\\\/www.projectmanager.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/ProjectManager-Logo-for-Website.png\",\"contentUrl\":\"\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/ProjectManager-Logo-for-Website.png\",\"width\":696,\"height\":696,\"caption\":\"ProjectManager\"},\"image\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/projectmanage\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/projectmanager.com\\\/\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/projectmanagervideos\",\"https:\\\/\\\/en.wikipedia.org\\\/wiki\\\/ProjectManager.com\"],\"description\":\"ProjectManager is a project and portfolio management software that offers online project management tools like Gantt charts, dashboards, kanban boards, task management features and more. With advanced planning and scheduling, automated cost and time tracking, risk analysis and resource management, our platform ensures flawless execution for construction, manufacturing and professional services teams, while providing unbeatable insights at every stage.\",\"legalName\":\"ProjectManager.com, Inc.\",\"foundingDate\":\"2008-01-01\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":\"11\",\"maxValue\":\"50\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#\\\/schema\\\/person\\\/3483ea14874d0b9e9a9532f8e4899a3c\",\"name\":\"William Malsam\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ee3696da4cbc91bc109142d860805e760b29e78d19b8fcab925873e4fb974260?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ee3696da4cbc91bc109142d860805e760b29e78d19b8fcab925873e4fb974260?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ee3696da4cbc91bc109142d860805e760b29e78d19b8fcab925873e4fb974260?s=96&d=mm&r=g\",\"caption\":\"William Malsam\"},\"description\":\"William is the Director of Content at ProjectManager.com. He writes and edits content for the website, blog, and bi-weekly newsletter.\",\"sameAs\":[\"https:\\\/\\\/x.com\\\/Malsam_PM\"],\"knowsAbout\":[\"Project management\",\"Project planning\",\"Blogs\"],\"knowsLanguage\":[\"English\"],\"jobTitle\":\"Project Management Expert Writer\",\"worksFor\":\"ProjectManager.com\",\"url\":\"https:\\\/\\\/www.projectmanager.com\\\/author\\\/williammalsam\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"What Is an Implementation Plan & How Do I Create One? (Example Included)","description":"Implementation plans are key to your project's success. Learn what they are, how to create one, & how ProjectManager can keep yours on track!","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.projectmanager.com\/blog\/implementation-plan","og_locale":"en_US","og_type":"article","og_title":"What Is an Implementation Plan? (Template & Example Included)","og_description":"Implementation plans are key to your project's success. Learn what they are, how to create one, & how ProjectManager can keep yours on track!","og_url":"https:\/\/www.projectmanager.com\/blog\/implementation-plan","og_site_name":"ProjectManager","article_publisher":"https:\/\/www.facebook.com\/projectmanage\/","article_published_time":"2024-10-28T18:52:31+00:00","article_modified_time":"2026-04-24T20:21:51+00:00","og_image":[{"width":1920,"height":1080,"url":"https:\/\/www.projectmanager.com\/wp-content\/uploads\/2019\/12\/191230_Blog_Feature_Implementation.jpg","type":"image\/jpeg"}],"author":"William Malsam","twitter_card":"summary_large_image","twitter_creator":"@Malsam_PM","twitter_misc":{"Written by":"William Malsam","Est. reading time":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.projectmanager.com\/blog\/implementation-plan#article","isPartOf":{"@id":"https:\/\/www.projectmanager.com\/blog\/implementation-plan"},"author":{"name":"William Malsam","@id":"https:\/\/www.projectmanager.com\/#\/schema\/person\/3483ea14874d0b9e9a9532f8e4899a3c"},"headline":"What Is an Implementation Plan? (Template &#038; Example Included)","datePublished":"2024-10-28T18:52:31+00:00","dateModified":"2026-04-24T20:21:51+00:00","mainEntityOfPage":{"@id":"https:\/\/www.projectmanager.com\/blog\/implementation-plan"},"wordCount":3286,"publisher":{"@id":"https:\/\/www.projectmanager.com\/#organization"},"image":{"@id":"https:\/\/www.projectmanager.com\/blog\/implementation-plan#primaryimage"},"thumbnailUrl":"\/wp-content\/uploads\/2019\/12\/191230_Blog_Feature_Implementation.jpg","articleSection":["Planning","Project Management","Project Management Blog"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.projectmanager.com\/blog\/implementation-plan","url":"https:\/\/www.projectmanager.com\/blog\/implementation-plan","name":"What Is an Implementation Plan & How Do I Create One? (Example Included)","isPartOf":{"@id":"https:\/\/www.projectmanager.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.projectmanager.com\/blog\/implementation-plan#primaryimage"},"image":{"@id":"https:\/\/www.projectmanager.com\/blog\/implementation-plan#primaryimage"},"thumbnailUrl":"\/wp-content\/uploads\/2019\/12\/191230_Blog_Feature_Implementation.jpg","datePublished":"2024-10-28T18:52:31+00:00","dateModified":"2026-04-24T20:21:51+00:00","description":"Implementation plans are key to your project's success. Learn what they are, how to create one, & how ProjectManager can keep yours on track!","breadcrumb":{"@id":"https:\/\/www.projectmanager.com\/blog\/implementation-plan#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.projectmanager.com\/blog\/implementation-plan"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.projectmanager.com\/blog\/implementation-plan#primaryimage","url":"\/wp-content\/uploads\/2019\/12\/191230_Blog_Feature_Implementation.jpg","contentUrl":"\/wp-content\/uploads\/2019\/12\/191230_Blog_Feature_Implementation.jpg","width":1920,"height":1080,"caption":"Feature Implementation"},{"@type":"BreadcrumbList","@id":"https:\/\/www.projectmanager.com\/blog\/implementation-plan#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.projectmanager.com\/"},{"@type":"ListItem","position":2,"name":"What Is an Implementation Plan? (Template &#038; Example Included)"}]},{"@type":"WebSite","@id":"https:\/\/www.projectmanager.com\/#website","url":"https:\/\/www.projectmanager.com\/","name":"ProjectManager","description":"The Best Project Management Software for Managing your Projects","publisher":{"@id":"https:\/\/www.projectmanager.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.projectmanager.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.projectmanager.com\/#organization","name":"ProjectManager","url":"https:\/\/www.projectmanager.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.projectmanager.com\/#\/schema\/logo\/image\/","url":"\/wp-content\/uploads\/2026\/06\/ProjectManager-Logo-for-Website.png","contentUrl":"\/wp-content\/uploads\/2026\/06\/ProjectManager-Logo-for-Website.png","width":696,"height":696,"caption":"ProjectManager"},"image":{"@id":"https:\/\/www.projectmanager.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/projectmanage\/","https:\/\/www.linkedin.com\/company\/projectmanager.com\/","https:\/\/www.youtube.com\/user\/projectmanagervideos","https:\/\/en.wikipedia.org\/wiki\/ProjectManager.com"],"description":"ProjectManager is a project and portfolio management software that offers online project management tools like Gantt charts, dashboards, kanban boards, task management features and more. With advanced planning and scheduling, automated cost and time tracking, risk analysis and resource management, our platform ensures flawless execution for construction, manufacturing and professional services teams, while providing unbeatable insights at every stage.","legalName":"ProjectManager.com, Inc.","foundingDate":"2008-01-01","numberOfEmployees":{"@type":"QuantitativeValue","minValue":"11","maxValue":"50"}},{"@type":"Person","@id":"https:\/\/www.projectmanager.com\/#\/schema\/person\/3483ea14874d0b9e9a9532f8e4899a3c","name":"William Malsam","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/ee3696da4cbc91bc109142d860805e760b29e78d19b8fcab925873e4fb974260?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/ee3696da4cbc91bc109142d860805e760b29e78d19b8fcab925873e4fb974260?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ee3696da4cbc91bc109142d860805e760b29e78d19b8fcab925873e4fb974260?s=96&d=mm&r=g","caption":"William Malsam"},"description":"William is the Director of Content at ProjectManager.com. He writes and edits content for the website, blog, and bi-weekly newsletter.","sameAs":["https:\/\/x.com\/Malsam_PM"],"knowsAbout":["Project management","Project planning","Blogs"],"knowsLanguage":["English"],"jobTitle":"Project Management Expert Writer","worksFor":"ProjectManager.com","url":"https:\/\/www.projectmanager.com\/author\/williammalsam"}]}},"_links":{"self":[{"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/posts\/49303","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/users\/45"}],"replies":[{"embeddable":true,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/comments?post=49303"}],"version-history":[{"count":0,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/posts\/49303\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/media\/49446"}],"wp:attachment":[{"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/media?parent=49303"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/categories?post=49303"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/tags?post=49303"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}