{"id":56880,"date":"2024-10-10T09:20:00","date_gmt":"2024-10-10T14:20:00","guid":{"rendered":"https:\/\/www.projectmanager.com\/?p=56880"},"modified":"2026-07-17T13:55:04","modified_gmt":"2026-07-17T18:55:04","slug":"construction-contracts-best-practices","status":"publish","type":"post","link":"https:\/\/www.projectmanager.com\/blog\/construction-contracts-best-practices","title":{"rendered":"14 Types of Construction Contracts: Pros, Cons &#038; Best Practices"},"content":{"rendered":"<h2 id=\"section-1\">What Is a Construction Contract?<\/h2>\n<p>In simple terms, construction contracts are legally binding agreements that explain the work that a general contractor will perform and the payment that a project owner will make. These contracts play a key role in <a href=\"\/guides\/construction-project-management\">construction management<\/a>.<\/p>\n<p>However, construction projects vary greatly in terms of complexity and size, so there\u2019s not a one-size-fits-all approach when it comes to construction contracts. That\u2019s why several types of construction contracts have been developed, such as lump sum, cost-plus, time &amp; materials (TM) and unit pricing contracts.<\/p>\n<p>Whichever contract type you use, <a href=\"\/\">ProjectManager<\/a> is project management software that can help you manage your construction projects. ProjectManager\u2019s online Gantt charts help you build detailed construction plans with costs, resource hours and dependencies, which is ideal for construction firms or contractors who have multiple contracts with owners and subcontractors alike.<\/p>\n<p>Make a detailed WBS on the left side of the Gantt chart to break your project into phases and milestones, then execute tasks with your team using more project views: list, kanban, sheet or calendar. There&#8217;s even a mobile app and a built-in timesheet function so it&#8217;s easy for field teams to update tasks and hours. Get started today for free.<\/p>\n<figure id=\"attachment_63416\" aria-describedby=\"caption-attachment-63416\" style=\"width: 1554px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.projectmanager.com\/freetrial?edition=d\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-63416 size-full\" src=\"\/wp-content\/uploads\/2024\/11\/Work-breakdown-structure-screenshot-Gantt-CTA-1.png\" alt=\"Gantt in ProjectManager\" width=\"1554\" height=\"831\" \/><\/a><figcaption id=\"caption-attachment-63416\" class=\"wp-caption-text\">Build a portfolio of detailed project plans with Gantt charts. <a href=\"\/software\/Gantt\">Learn more<\/a><\/figcaption><\/figure>\n<h2>Why Are Construction Contracts Necessary?<\/h2>\n<p>Construction contracts protect both parties in the agreement. These <a href=\"https:\/\/www.projectmanager.com\/blog\/what-is-construction-administration\">construction administration<\/a> documents detail what work will be completed, when it&#8217;ll be completed and how much it&#8217;ll cost. They also outline methods of communication and how disputes will be handled if they arise.<\/p>\n<p>By including information about communication and changes, construction contracts streamline the decision-making process. Ideally, <a href=\"https:\/\/www.projectmanager.com\/training\/how-to-analyze-risks-project\">project risks<\/a> have been anticipated and the contract outlines how best to proceed. A construction contract is, first and foremost, an agreement, but it serves as a roadmap of sorts as well.<\/p>\n<figure id=\"attachment_64093\" aria-describedby=\"caption-attachment-64093\" style=\"width: 600px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.projectmanager.com\/templates\/risk-tracking-template\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-64093 size-medium\" src=\"\/wp-content\/uploads\/2022\/09\/Risk-Tracking-Screenshot-600x262.webp\" alt=\"Risk tracking template\" width=\"600\" height=\"262\" srcset=\"\/wp-content\/uploads\/2022\/09\/Risk-Tracking-Screenshot-600x262.webp 600w, \/wp-content\/uploads\/2022\/09\/Risk-Tracking-Screenshot-300x131.webp 300w, \/wp-content\/uploads\/2022\/09\/Risk-Tracking-Screenshot-768x336.webp 768w, \/wp-content\/uploads\/2022\/09\/Risk-Tracking-Screenshot-450x197.webp 450w, \/wp-content\/uploads\/2022\/09\/Risk-Tracking-Screenshot.webp 1398w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><figcaption id=\"caption-attachment-64093\" class=\"wp-caption-text\">Risk tracking template <a href=\"https:\/\/www.projectmanager.com\/templates\/risk-tracking-template\">Free download<\/a><\/figcaption><\/figure>\n<h2 id=\"section-2\">Who Is Involved in Construction Contracts?<\/h2>\n<p>Construction contracts involve two parties; owners and contractors. Owners need a job outsourced and the <a href=\"\/training\/getting-the-most-from-contractors\">contractor<\/a> executes the job. The two parties work together to draw up a contract and agree on the terms of completion and payment.<\/p>\n<p>Owners contract builders when they need to execute a specialized job they cannot perform on their own. They may also contract builders when the scale of the project is too large for them alone. Construction projects, in particular, often require owners to hire several different contractors. In this case, thorough construction contracts are crucial to successful project management.<\/p>\n<figure id=\"attachment_65904\" aria-describedby=\"caption-attachment-65904\" style=\"width: 600px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.projectmanager.com\/templates\/contractor-estimate-template\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-65904 size-medium\" src=\"\/wp-content\/uploads\/2023\/02\/contractor-estimate-template-projectmanager-600x435.jpg\" alt=\"Contractor estimate template\" width=\"600\" height=\"435\" srcset=\"\/wp-content\/uploads\/2023\/02\/contractor-estimate-template-projectmanager-600x435.jpg 600w, \/wp-content\/uploads\/2023\/02\/contractor-estimate-template-projectmanager-300x217.jpg 300w, \/wp-content\/uploads\/2023\/02\/contractor-estimate-template-projectmanager-768x557.jpg 768w, \/wp-content\/uploads\/2023\/02\/contractor-estimate-template-projectmanager-450x326.jpg 450w, \/wp-content\/uploads\/2023\/02\/contractor-estimate-template-projectmanager.jpg 1512w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><figcaption id=\"caption-attachment-65904\" class=\"wp-caption-text\">Contractor estimate template <a href=\"https:\/\/www.projectmanager.com\/templates\/contractor-estimate-template\">Free download<\/a><\/figcaption><\/figure>\n<h2 id=\"section-3\">Types of Construction Contracts<\/h2>\n<p>Because construction projects take many forms, different projects require contracts with different characteristics. All types of construction contracts define a timeline, budget, quality requirements and other aspects that need to be defined in every construction project. The two main differences between these types of construction contracts are how the disbursement will be made and the <a href=\"\/training\/what-is-project-risk\">risks<\/a> and rewards that each party assumes.<\/p>\n<p>Before creating a construction contract, it&#8217;s important to know the type of contract that best suits your needs.<\/p>\n<h3>1. Lump-Sum Contract<\/h3>\n<p>A lump-sum contract (also called a <a href=\"\/blog\/fixed-price-contract\">fixed price contract<\/a>) names a total price for the entire job. This price accounts for all time and materials regardless of changes or issues. This type of contract protects owners against unforeseen changes and setbacks.<\/p>\n<p>Lump-sum contracts can seem as though they favor the owner over the contractor, but there are ways to balance the scales. Many contractors charge an additional percentage for signing lump sum contracts, as they&#8217;ll be taking a higher risk. Additionally, incentive programs are often put in place by owners to reward jobs being completed early.<\/p>\n<h3>2. Cost-Plus Contract<\/h3>\n<p>Cost-plus contracts are made of two parts: a predetermined fee and accumulated costs. This fee is the agreed price owners will pay contractors. It can be a dollar amount, a percentage of the total project cost or another form of payment. The defining characteristic of a <a href=\"https:\/\/www.projectmanager.com\/blog\/cost-plus-contract\">cost-plus contract<\/a> is it reports expenses as they occur rather than deducting costs from a set budget.<\/p>\n<p>A cost-plus contract is used when construction project expenses are uncertain. While this can seem like a liability, cost-plus contracts often include incentives for coming in under budget and set caps on expenditures. This avoids conflict and ensures contractors are paid a fair overhead.<\/p>\n<h3>3. Time and Materials Contract<\/h3>\n<p>Time and materials contracts are a fitting choice when the scope of a project is completely unknown. In this case, contractors charge an hourly rate for labor and for materials as needed. Because this leaves uncertainty, these contracts must be specific and prepare for almost anything. An owner should include incentives for construction projects completed ahead of <a href=\"https:\/\/www.projectmanager.com\/blog\/make-a-construction-schedule\">schedule<\/a> and\/or under budget.<\/p>\n<p>A <a href=\"\/blog\/time-and-materials-contract\">time and materials contract<\/a> is a good choice for small projects as they require close supervision. For example, all costs must be carefully monitored and classified to document them and ensure contracts are followed. As you can imagine, this becomes increasingly difficult the larger the project. The advantage of choosing a time and materials contract is it protects owners from overpaying contractors.<\/p>\n<div class=\"template-download-holder\">\n\t<div class=\"template-download-image-holder\">\n\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"900\" src=\"\/wp-content\/uploads\/2024\/03\/RFP-template-featured-image.jpg\" class=\"attachment-large size-large\" alt=\"Request for proposal template featured image\" srcset=\"\/wp-content\/uploads\/2024\/03\/RFP-template-featured-image.jpg 1600w, \/wp-content\/uploads\/2024\/03\/RFP-template-featured-image-600x338.jpg 600w, \/wp-content\/uploads\/2024\/03\/RFP-template-featured-image-300x169.jpg 300w, \/wp-content\/uploads\/2024\/03\/RFP-template-featured-image-768x432.jpg 768w, \/wp-content\/uploads\/2024\/03\/RFP-template-featured-image-1536x864.jpg 1536w, \/wp-content\/uploads\/2024\/03\/RFP-template-featured-image-450x253.jpg 450w, \/wp-content\/uploads\/2024\/03\/RFP-template-featured-image-384x216.jpg 384w, \/wp-content\/uploads\/2024\/03\/RFP-template-featured-image-800x451.jpg 800w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/>\t<\/div><p class=\"intro\">Get your free<\/p>\n<h3>RFP Template For Word<\/h3>\n<p class=\"subtitle\">\n\tUse this free RFP Template For Word  for Word to manage your projects better.<\/p>\n\t\t<button type=\"button\" data-file-id=\"69872\" data-categoryname=\"In blog post\" class=\"button green template-lightbox-trigger-69872\">Download Word File<\/button>\n\t<\/div> \n\n<p>&nbsp;<\/p>\n<h3>4. Unit Price Contract<\/h3>\n<p>A unit pricing contract is used when an owner wishes to buy a large quantity of a certain product. Each product is a unit and costs a set price. These items can also often be charged in <a href=\"https:\/\/www.projectmanager.com\/blog\/what-is-bill-of-quantities\">bulk quantities<\/a> for a reduced price.<\/p>\n<p>Unit pricing contracts are advantageous when an owner knows exactly how much of a specific product they need, such as when a <a href=\"\/blog\/what-is-bill-of-quantities\">bill of quantities<\/a> has been drafted or a material takeoff has been done. Using this type of contract and buying all the units at once is also a good way to protect against potential future inflation of material prices. By buying all of the items at once, owners generally pay less than they would in the future and don\u2019t have to worry about drawing up future contracts.<\/p>\n<figure id=\"attachment_66152\" aria-describedby=\"caption-attachment-66152\" style=\"width: 450px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.projectmanager.com\/templates\/bill-of-quantities-template\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-66152 size-small-medium\" src=\"\/wp-content\/uploads\/2023\/03\/bill-of-quantities-template-1-450x219.jpg\" alt=\"Bill of quantities template\" width=\"450\" height=\"219\" srcset=\"\/wp-content\/uploads\/2023\/03\/bill-of-quantities-template-1-450x219.jpg 450w, \/wp-content\/uploads\/2023\/03\/bill-of-quantities-template-1-600x293.jpg 600w, \/wp-content\/uploads\/2023\/03\/bill-of-quantities-template-1-300x146.jpg 300w, \/wp-content\/uploads\/2023\/03\/bill-of-quantities-template-1-768x375.jpg 768w, \/wp-content\/uploads\/2023\/03\/bill-of-quantities-template-1.jpg 1501w\" sizes=\"auto, (max-width: 450px) 100vw, 450px\" \/><\/a><figcaption id=\"caption-attachment-66152\" class=\"wp-caption-text\">Bill of quantities template <a href=\"https:\/\/www.projectmanager.com\/templates\/bill-of-quantities-template\">Free download<\/a><\/figcaption><\/figure>\n<h3>5. Design-Build Contract<\/h3>\n<p>In most cases, project owners receive completed designs during the construction bidding process. However, in a design-build contract, the design and construction are done simultaneously and handled with one contract, as opposed to traditional construction contracting methods.<\/p>\n<p>This type of construction contract allows for increased communication between the designer and the construction team and speeds up the <a href=\"\/blog\/construction-bids-mastering-construction-bidding\">bidding<\/a> and construction process.<\/p>\n<h3>6. Guaranteed Maximum Price (GMP) Contract<\/h3>\n<p>A guaranteed maximum price (GMP) contract defines the maximum price that a project owner has to pay for a project. If the <a href=\"https:\/\/www.projectmanager.com\/blog\/construction-cost-management\">construction costs<\/a> exceed said guaranteed maximum price, the general contractor will cover the additional expenses.<\/p>\n<p>For that reason, this contract type requires that general contractors create the most accurate construction estimate possible. It might sound risky, but it doesn\u2019t have to be. General contractors can easily create estimates using <a href=\"https:\/\/www.projectmanager.com\/blog\/best-construction-estimating-software\">construction estimating software<\/a> like ProjectManager or hire a specialized construction estimator to create realistic and profitable estimates.<\/p>\n<figure id=\"attachment_61664\" aria-describedby=\"caption-attachment-61664\" style=\"width: 1600px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.projectmanager.com\/industries\/construction-project-management\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-61664 size-large\" src=\"\/wp-content\/uploads\/2021\/01\/estimate-template-argo-redesign-1600x529.jpg\" alt=\"construction estimating software\" width=\"1600\" height=\"529\" srcset=\"\/wp-content\/uploads\/2021\/01\/estimate-template-argo-redesign-1600x529.jpg 1600w, \/wp-content\/uploads\/2021\/01\/estimate-template-argo-redesign-600x198.jpg 600w, \/wp-content\/uploads\/2021\/01\/estimate-template-argo-redesign-300x99.jpg 300w, \/wp-content\/uploads\/2021\/01\/estimate-template-argo-redesign-768x254.jpg 768w, \/wp-content\/uploads\/2021\/01\/estimate-template-argo-redesign-1536x508.jpg 1536w, \/wp-content\/uploads\/2021\/01\/estimate-template-argo-redesign-450x149.jpg 450w, \/wp-content\/uploads\/2021\/01\/estimate-template-argo-redesign.jpg 1828w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/a><figcaption id=\"caption-attachment-61664\" class=\"wp-caption-text\">Make an estimate and stick to your schedule with ProjectManager. <a href=\"\/industries\/construction-project-management\">Learn more<\/a><\/figcaption><\/figure>\n<h3>7. Incentive Construction Contracts<\/h3>\n<p>Under an incentive construction contract, the project owner and contractor agree on an extra payment fee that\u2019s given to the contractor depending on whether the project is delivered on time and under <a href=\"\/blog\/construction-budget-quick-guide\">budget<\/a>.<\/p>\n<figure id=\"attachment_70847\" aria-describedby=\"caption-attachment-70847\" style=\"width: 450px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.projectmanager.com\/templates\/project-budget-template\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-70847 size-small-medium\" src=\"\/wp-content\/uploads\/2023\/08\/Project-Budget-Screenshot-450x125.jpg\" alt=\"Project budget template\" width=\"450\" height=\"125\" srcset=\"\/wp-content\/uploads\/2023\/08\/Project-Budget-Screenshot-450x125.jpg 450w, \/wp-content\/uploads\/2023\/08\/Project-Budget-Screenshot-600x167.jpg 600w, \/wp-content\/uploads\/2023\/08\/Project-Budget-Screenshot-300x83.jpg 300w, \/wp-content\/uploads\/2023\/08\/Project-Budget-Screenshot-768x214.jpg 768w, \/wp-content\/uploads\/2023\/08\/Project-Budget-Screenshot.jpg 1477w\" sizes=\"auto, (max-width: 450px) 100vw, 450px\" \/><\/a><figcaption id=\"caption-attachment-70847\" class=\"wp-caption-text\">Project budget template <a href=\"https:\/\/www.projectmanager.com\/templates\/project-budget-template\">Free download<\/a><\/figcaption><\/figure>\n<p>If the contractor misses the <a href=\"https:\/\/www.projectmanager.com\/guides\/project-timeline\">timeline<\/a> or exceeds the budget, they still need to complete the project and meet the owner\u2019s requirements even without earning the extra payment fee.<\/p>\n<h3>8. Integrated Project Delivery Contract<\/h3>\n<p>This type of contract is mostly used for large, complex projects. Similar to the design-build contract, it uses a single contract for <a href=\"\/blog\/architectural-design-process\">design<\/a> and construction, but it also involves a multi-party agreement between the owner, builder and designer where they share risks, agree on costs, set waivers and follow lean principles.<\/p>\n<p>The main purpose of this construction contract is to provide a detailed framework that spreads the risks and rewards evenly among the parties. For example, an IPD construction contract involves a lump sum profit that\u2019s divided among the owner, designer and builder if the project achieves financial results.<\/p>\n<a class=\"trapdoor\" href=\"https:\/\/https:\/\/learn.projectmanager.com\/construction-management-ebook\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-79091 size-full\" src=\"\/wp-content\/uploads\/2026\/01\/2026_construction_ebook_banner-ad.jpg\" alt=\"2026 construction eBook ad\" width=\"2021\" height=\"521\" srcset=\"\/wp-content\/uploads\/2026\/01\/2026_construction_ebook_banner-ad.jpg 2021w, \/wp-content\/uploads\/2026\/01\/2026_construction_ebook_banner-ad-600x155.jpg 600w, \/wp-content\/uploads\/2026\/01\/2026_construction_ebook_banner-ad-1600x412.jpg 1600w, \/wp-content\/uploads\/2026\/01\/2026_construction_ebook_banner-ad-300x77.jpg 300w, \/wp-content\/uploads\/2026\/01\/2026_construction_ebook_banner-ad-768x198.jpg 768w, \/wp-content\/uploads\/2026\/01\/2026_construction_ebook_banner-ad-1536x396.jpg 1536w, \/wp-content\/uploads\/2026\/01\/2026_construction_ebook_banner-ad-450x116.jpg 450w\" sizes=\"auto, (max-width: 2021px) 100vw, 2021px\" \/><\/a>\n<h3>9. Subcontractor Agreement<\/h3>\n<p>This legally binding contract is between a general contractor and a <a href=\"https:\/\/www.projectmanager.com\/blog\/subcontractor-management-in-construction\">subcontractor.<\/a> It outlines the terms and conditions under which the subcontractor will perform specific tasks or provide certain services as part of a larger construction project.<\/p>\n<p>Some key components of a subcontractor agreement include the scope of work that the subcontractor is expected to perform. Payment terms are also defined, such as how and when the subcontractor will be compensated. There\u2019s a timeline that includes deadlines for the work and any milestones that must be met. Responsibilities are outlined. Insurance coverage and liability protection for both parties are also defined.<\/p>\n<h3>10. Turnkey Contract<\/h3>\n<p>This agreement is where the contractor agrees to deliver a completed project that&#8217;s ready for immediate use by the owner. The contractor will take full responsibility for both the project\u2019s design and construction. This type of construction contract is usually found in commercial projects, infrastructure development and large-scale facilities.<\/p>\n<p>There is a single point of responsibility, meaning the contractor manages the entire project, and the contract is typically based on a fixed price. A defined <a href=\"https:\/\/www.projectmanager.com\/blog\/project-scope\">project scope<\/a> details what the contractor is responsible for delivering and the agreement will also specify a timeline for completion.<\/p>\n<h3>11. Build-Operate-Transfer (BOT) Contract<\/h3>\n<p>This project financing and <a href=\"https:\/\/www.projectmanager.com\/blog\/construction-delivery-methods\">delivery model<\/a> is commonly used in large infrastructure projects where a private entity or contractor is responsible for the design, construction and operation of a facility for a specified period before transferring ownership to the government or public authority. This contract is popular in sectors like transportation, energy and public utilities.<\/p>\n<p>Risks associated with construction, operation and maintenance are primarily borne by the private contractor, while the public authority retains ownership after the transfer. It establishes a long-term partnership between the public and private sectors, which facilitates investment in infrastructure. As financing is on the private entity, these arrangements help alleviate the immediate financial burden on public budgets.<\/p>\n<h3>12. Public-Private Partnership (PPP) Contract<\/h3>\n<p>As the name suggests, this contract is a collaborative agreement between a government entity and a private sector company. This model is used to finance, design and operate public infrastructure projects, leveraging the strengths of both sectors. It can be found in <a href=\"\/guides\/construction-project-management\">construction projects<\/a> ranging from transportation, water supply and sanitation, energy generation and distribution and healthcare facilities to education instructions.<\/p>\n<p>Both parties share risks and rewards associated with the project. The private sector usually does the design, construction and <a href=\"https:\/\/www.projectmanager.com\/blog\/operations-mgmt-functions-roles-skills\">operation<\/a>, while the public sector provides oversight and regulatory support. The contracts tend to span several years, sometimes decades, allowing for the private partner to recover their investment and earn a profit through service fees or tolls.<\/p>\n<h3>13. Engineering, Procurement and Construction (EPC) Contract<\/h3>\n<p>Widely used project delivery method in construction, particularly for large infrastructure and industrial projects, involves a single contractor, known as the EPC contractor. They take on the responsibility for engineering, <a href=\"https:\/\/www.projectmanager.com\/blog\/project-procurement-management-quick-guide\">procurement<\/a> and construction of a project from start to finish. This is popular due to streamlining the process, reducing complexity and fixed pricing that provides budget certainty.<\/p>\n<p>This type of construction contract can be found in projects for sectors such as energy (power plants, renewable energy projects), oil and gas (refineries, pipelines), water treatment facilities and infrastructure (roads, bridges). This contract is designed to enhance efficiency and accountability, making it a popular choice for these <a href=\"https:\/\/www.projectmanager.com\/blog\/manage-a-complex-project\">larger projects<\/a>.<\/p>\n<h3>14. Open-Book Contract<\/h3>\n<p>In this type of construction contract, the contractor provides full transparency regarding the <a href=\"https:\/\/www.projectmanager.com\/training\/how-to-track-project-expenses\">costs and expenses<\/a> associated with a project. This structure allows the owner to review the contractor\u2019s financial records, invoices and other relevant documents related to the project. This collaborative approach fosters a relationship that can lead to better decision-making.<\/p>\n<p>It creates trust and accountability between the parties and flexibility about changes based on real-time cost data. By monitoring costs closely, owners can identify areas for savings or efficiencies. However, the need for detailed documentation and <a href=\"https:\/\/www.projectmanager.com\/blog\/construction-reporting-basics\">regular reporting<\/a> can create an administrative burden. There is also potential for disputes if the contractor\u2019s expenses are perceived as excessive or unjustified.<\/p>\n<h2 id=\"section-4\">What Should Be Included In a Construction Contract?<\/h2>\n<p>While each type of construction contract works differently, they still share some elements needed for any construction project.<\/p>\n<ul>\n<li><strong>Contract Sum:<\/strong> Any construction contract should indicate the contract sum, which is the total value that the project owner will pay the contractor for the <a href=\"https:\/\/www.projectmanager.com\/blog\/project-execution\">execution of work<\/a>. The contract sum should cover all the project costs and expenses plus the contractor\u2019s profit margin.<\/li>\n<li><strong>Retainage:<\/strong> The project owner and contractor must agree on a <a href=\"https:\/\/www.projectmanager.com\/blog\/what-is-retainage-in-construction\">retainage<\/a> rate, which is a percentage of the payment that the project owner withholds until the contractor completes the duties outlined in the contract.<\/li>\n<li><strong>Scope of Work:<\/strong> The <a href=\"\/training\/write-scope-work\">scope of work<\/a> is a document that describes all the tasks and deliverables of a project. In simple terms, it defines what will and won\u2019t be done in a construction project, which is important for estimating costs and making a budget. Our scope of work template is a helpful tool that helps you define the tasks and deliverables that make up the scope of your project.<\/li>\n<\/ul>\n<figure id=\"attachment_69043\" aria-describedby=\"caption-attachment-69043\" style=\"width: 446px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.projectmanager.com\/templates\/scope-of-work-template\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-69043\" src=\"\/wp-content\/uploads\/2023\/12\/Scope-of-work-template-screenshot-600x611.png\" alt=\"Scope Of Work Template Screenshot\" width=\"446\" height=\"454\" \/><\/a><figcaption id=\"caption-attachment-69043\" class=\"wp-caption-text\">ProjectManager&#8217;s Scope of Work Template for Word <a href=\"https:\/\/www.projectmanager.com\/templates\/scope-of-work-template\">Download now<\/a><\/figcaption><\/figure>\n<ul>\n<li><strong>Responsibilities of Owner and Contractor:<\/strong> A construction contract should outline responsibilities for both parties. For example, by signing a contract, the contractor assumes responsibility for completing the scope of work while the owner agrees to pay for that work. If either party fails to meet such obligations, the contract might be terminated.<\/li>\n<li><strong>Payment Terms:<\/strong> Construction contracts must define how payment will be made to the contractor. There are several construction project management documents and tools you can use for payroll management such as timesheets, schedules of values or payment schedules.<\/li>\n<li><strong>Change Management:<\/strong> Changes might be risky for your project, but they don\u2019t have to be if you establish a <a href=\"\/blog\/change-management-process\">change management process<\/a> and use tools and documents like change requests, change orders and change logs.<\/li>\n<li><strong>Construction Specifications:<\/strong> Construction specifications are the detailed description of the materials, workmanship, tools and quality standards that the project owner and contractor agree upon.<\/li>\n<li><strong>Construction Timeline &amp; Contract Duration:<\/strong> The contract should specify due dates for the completion of construction deliverables and the duration of the contract. You can use our Gantt chart template for <a href=\"\/templates\/gantt-chart-template\">Excel<\/a>, <a href=\"\/blog\/how-to-make-a-gantt-chart-word\">Word<\/a> or <a href=\"\/blog\/gantt-chart-power-point\">PowerPoint<\/a> to create a project timeline you can attach to your construction documents.<\/li>\n<\/ul>\n<figure id=\"attachment_61338\" aria-describedby=\"caption-attachment-61338\" style=\"width: 600px\" class=\"wp-caption aligncenter\"><a href=\"\/templates\/gantt-chart-template\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-61338 size-medium\" src=\"\/wp-content\/uploads\/2020\/09\/Gantt-Chart-Screenshot-600x243.jpg\" alt=\"Gantt Chart template for Microsoft Excel\" width=\"600\" height=\"243\" srcset=\"\/wp-content\/uploads\/2020\/09\/Gantt-Chart-Screenshot-600x243.jpg 600w, \/wp-content\/uploads\/2020\/09\/Gantt-Chart-Screenshot-1600x648.jpg 1600w, \/wp-content\/uploads\/2020\/09\/Gantt-Chart-Screenshot-300x121.jpg 300w, \/wp-content\/uploads\/2020\/09\/Gantt-Chart-Screenshot-768x311.jpg 768w, \/wp-content\/uploads\/2020\/09\/Gantt-Chart-Screenshot-1536x622.jpg 1536w, \/wp-content\/uploads\/2020\/09\/Gantt-Chart-Screenshot-450x182.jpg 450w, \/wp-content\/uploads\/2020\/09\/Gantt-Chart-Screenshot.jpg 1645w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><figcaption id=\"caption-attachment-61338\" class=\"wp-caption-text\">Gantt chart template <a href=\"https:\/\/www.projectmanager.com\/templates\/gantt-chart-template\">Free download<\/a><\/figcaption><\/figure>\n<ul>\n<li><strong>Terms and Conditions:<\/strong> Contracts contain terms and conditions such as indemnification clauses whenever the contractor fails to meet the <a href=\"\/blog\/project-quality-management-quick-guide\">quality standards<\/a> or omits part of the scope of work due to negligence.<\/li>\n<li><strong>Regulatory Compliance:<\/strong> Most contracts require the contractor to meet local requirements, building codes and other regulations.<\/li>\n<li><strong>Warranty:<\/strong> Some contracts require the contractor to offer a warranty, which requires them to fix and repair any issues and defects that arise within a defined period.<\/li>\n<li><strong>Construction Drawings:<\/strong> Some construction contracts involve the creation of <a href=\"\/blog\/construction-documents\">construction documents<\/a> such as construction schedules, blueprints, drawings, estimates and more.<\/li>\n<\/ul>\n<h2>Request for Proposal (RFP) Template<\/h2>\n<p>This free <a href=\"\/templates\/request-for-proposal-template\">request for proposal template<\/a> allows you to list all the information you\u2019d like to get from the construction contractors who will send project proposals to bid on your construction project. A detailed RFP helps you avoid any misunderstandings with construction contractors by clearly defining the project scope, timeline, budget, selection criteria and more.<\/p>\n<figure id=\"attachment_69874\" aria-describedby=\"caption-attachment-69874\" style=\"width: 1600px\" class=\"wp-caption aligncenter\"><a href=\"\/templates\/request-for-proposal-template\"><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"820\" class=\"aligncenter size-large wp-image-69874\" src=\"\/wp-content\/uploads\/2024\/03\/RFP-Template-screenshot-1600x820.png\" alt=\"Request for Proposal Template\" srcset=\"\/wp-content\/uploads\/2024\/03\/RFP-Template-screenshot-1600x820.png 1600w, \/wp-content\/uploads\/2024\/03\/RFP-Template-screenshot-600x307.png 600w, \/wp-content\/uploads\/2024\/03\/RFP-Template-screenshot-300x154.png 300w, \/wp-content\/uploads\/2024\/03\/RFP-Template-screenshot-768x394.png 768w, \/wp-content\/uploads\/2024\/03\/RFP-Template-screenshot-1536x787.png 1536w, \/wp-content\/uploads\/2024\/03\/RFP-Template-screenshot-450x231.png 450w, \/wp-content\/uploads\/2024\/03\/RFP-Template-screenshot.png 1643w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/a><figcaption id=\"caption-attachment-69874\" class=\"wp-caption-text\">Free Request For Proposal template. <a href=\"https:\/\/www.projectmanager.com\/templates\/request-for-proposal-template\">Download now<\/a><\/figcaption><\/figure>\n<p>We offer a variety of free <a href=\"\/blog\/8-free-excel-construction-templates\">construction project management templates for Excel<\/a> you can use to manage all aspects of your project.<\/p>\n<h2 id=\"section-5\">Construction Contracts Best Practices<\/h2>\n<p>No matter what type of <a href=\"https:\/\/www.projectmanager.com\/construction-plan\">construction project you\u2019re planning<\/a>, these best practices ensure your contract is a clear, detailed arrangement.<\/p>\n<h3>Include Incentives<\/h3>\n<p>One of the best ways to set a construction project up for success is by creating incentives. Incentives are useful when the scope is undetermined and the budget, time and labor costs are up in the air. Incentives encourage both contractors and owners to work efficiently and complete a project on time and under budget.<\/p>\n<h3>Clearly Outline Expectations<\/h3>\n<p>Be clear when conveying expectations on how expenses will be reported, how communication will be maintained or how any other aspect of a construction project is managed. Outline a contract and break it into key points to which the contractor can refer back.<\/p>\n<h3>Create Contingencies<\/h3>\n<p>The best construction contracts have <a href=\"https:\/\/www.projectmanager.com\/blog\/contingency-plan\">contingency plans.<\/a> More often than not, something unexpected will happen during a construction project. When construction contracts have contingencies, both the owner and the builder have a roadmap of what to do when something goes wrong.<\/p>\n<h2 id=\"section-6\">What to Avoid When Writing Construction Contracts<\/h2>\n<p>Here are three common mistakes to learn from and avoid in your construction contracts.<\/p>\n<h3>Not Being Specific<\/h3>\n<p>One common mistake is to generalize rather than specify. The point of a construction contract is to detail the exact terms of the agreement between an owner and a builder, leaving no room for interpretation. There&#8217;s no such thing as an overly detailed contract.<\/p>\n<p>With this in mind, construction contracts should remain clear and unclouded by unnecessary details. Find a balance between anticipating everything that should be included and editing down information that dilutes the key points. Our <a href=\"\/blog\/8-free-excel-construction-templates\">construction management templates<\/a> are a great place to start creating your construction project documentation.<\/p>\n<h3>Not Establishing Communication<\/h3>\n<p>When writing a construction contract, specify exactly how and when a contractor should communicate. This communication can be in the form of regular check-ins or only in the case of significant changes, but both parties must know when to run something by one another before <a href=\"https:\/\/www.projectmanager.com\/blog\/project-decision-log\">making decisions<\/a>.<\/p>\n<p>Lack of communication is detrimental to construction projects. Because there are so many moving parts, everyone must understand their role in one another. A well-written construction contract sets up a system of communication and makes it clear where to direct questions and updates.<\/p>\n<h3>Not Detailing How to Manage Changes<\/h3>\n<p>Changes are inevitable in any project, but never more so than in construction projects. Construction projects have countless moving parts and involve many individuals and many different contractors. This means adjustments are a natural part of the project.<\/p>\n<p>A detailed construction contract means these changes don\u2019t have to be bumps in the road. When contracts stipulate exactly how changes should be made, who makes them, and how the process looks, everything runs smoothly. On the other hand, when these details aren&#8217;t clear, contractors won&#8217;t know how to make changes, who to go to for approval and how to document what changes were made.<\/p>\n<h2 id=\"section-7\">ProjectManager &amp; Construction Contracts<\/h2>\n<p><a href=\"https:\/\/www.projectmanager.com\">ProjectManager <\/a>gives you the power to manage construction projects from start to finish, on the go. Create a comprehensive project plan, complete documents and assign tasks from the job site or anywhere else you get work done.<\/p>\n<h3>Interactive Gantt Charts<\/h3>\n<p>We have an <a href=\"https:\/\/www.projectmanager.com\/software\/gantt-chart\">online Gantt chart<\/a> for you to plan your construction project from start to finish. Add durations to your tasks and a bar chart will be generated. You can link dependent tasks and set milestones across the timeline.<\/p>\n<a href=\"\/software\/gantt-chart\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-69562 size-large\" src=\"\/wp-content\/uploads\/2024\/02\/Construction-Gantt-chart-showing-task-lists-and-due-dates-1600x728.webp\" alt=\"Gantt chart in ProjectManager\" width=\"1600\" height=\"728\" \/><\/a>\n<h3>Resource and Team Management<\/h3>\n<p>Managing resources can be complicated, but our <a href=\"https:\/\/www.projectmanager.com\/software\/resource-management\">online resource management software <\/a>gives you the real-time data you need to make informed decisions. Categorize your teams, supplies and equipment and add hourly rates. When hours are logged, the actual cost is automatically compared to the planned cost.<\/p>\n<a href=\"\/software\/resource-management\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-65504 size-large\" src=\"\/wp-content\/uploads\/2023\/01\/Workload-Light-2554x1372-1-1600x860.png\" alt=\"Workload chart in ProjectManager\" width=\"1600\" height=\"860\" srcset=\"\/wp-content\/uploads\/2023\/01\/Workload-Light-2554x1372-1-1600x860.png 1600w, \/wp-content\/uploads\/2023\/01\/Workload-Light-2554x1372-1-600x322.png 600w, \/wp-content\/uploads\/2023\/01\/Workload-Light-2554x1372-1-300x161.png 300w, \/wp-content\/uploads\/2023\/01\/Workload-Light-2554x1372-1-768x413.png 768w, \/wp-content\/uploads\/2023\/01\/Workload-Light-2554x1372-1-1536x825.png 1536w, \/wp-content\/uploads\/2023\/01\/Workload-Light-2554x1372-1-2048x1100.png 2048w, \/wp-content\/uploads\/2023\/01\/Workload-Light-2554x1372-1-450x242.png 450w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/a>\n<h3>Timesheets<\/h3>\n<p>As your teams log their hours, our <a href=\"\/software\/timesheets\">time-tracking feature<\/a> automatically updates when workers finish their tasks, making payroll a breeze. You can also track your team&#8217;s progress on the real-time dashboard, which displays key project KPIs in scannable graphs and charts.<\/p>\n<a href=\"\/software\/timesheets\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-65492 size-large\" src=\"\/wp-content\/uploads\/2023\/01\/Timesheet-Light-2554x1372-1-e1709159471615-1600x536.png\" alt=\"ProjectManager's timesheets\" width=\"1600\" height=\"536\" \/><\/a>\n<h2 id=\"section-8\">Related Construction Project Management Content<\/h2>\n<p>Contracts aren&#8217;t the only type of construction document that you&#8217;ll need to create during the life cycle of your project. There are many other forms, reports and templates you might need to use to manage all the areas of your project. If you&#8217;d like to save some time, you can use our dozens of <a href=\"\/pm-templates\">project management templates<\/a>, which can help you easily make all your construction project documentation.<\/p>\n<ul>\n<li><a href=\"\/blog\/construction-documents\">26 Construction Documents (Templates Included)<\/a><\/li>\n<li><a href=\"\/blog\/construction-reporting-basics\">Construction Reporting: Types of Construction Reports<\/a><\/li>\n<li><a href=\"\/blog\/8-free-excel-construction-templates\">11 Free Excel Construction Templates<\/a><\/li>\n<li><a href=\"https:\/\/www.projectmanager.com\/es\/contrato-de-construccion\">\u00bfQu\u00e9 es un Contrato de Construcci\u00f3n? Ejemplos de Contratos de Construcci\u00f3n<\/a><\/li>\n<li><a href=\"https:\/\/www.projectmanager.com\/fr\/types-de-contrats-de-construction\">14 types de contrats de construction : avantages et inconv\u00e9nients<\/a><\/li>\n<li><a href=\"https:\/\/www.projectmanager.com\/de\/bauvertragen\">14 Arten von Bauvertr\u00e4gen: Vorteile, Nachteile und Best Practices<\/a><\/li>\n<\/ul>\n<p><em>ProjectManager is <a href=\"\/industries\/construction-project-management\">construction project management software<\/a> that has the tools you need to manage your construction project. Our robust features make planning, scheduling and reporting down to the last task more efficient and effective. Plus, the data you get is more accurate because it\u2019s updated as your team works. <a href=\"https:\/\/www.projectmanager.com\/freetrial?edition=d\">Try ProjectManager for free with this 30-day trial offer.<\/a><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>What Is a Construction Contract? In simple terms, construction contracts are legally binding agreements that explain the work that a&#8230;<br \/><a class=\"excerpt-read-more button blue\" href=\"https:\/\/www.projectmanager.com\/blog\/construction-contracts-best-practices\">Read More<\/a><\/p>\n","protected":false},"author":45,"featured_media":68049,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_yoast_wpseo_meta-robots-noindex":0,"_yoast_wpseo_canonical":"","_yoast_wpseo_opengraph-title":"","_yoast_wpseo_opengraph-description":"","_yoast_wpseo_opengraph-image":"","_yoast_wpseo_twitter-title":"","_yoast_wpseo_twitter-description":"","head_code_insert":"<link rel=\"alternate\" hreflang=\"en-us\" href=\"https:\/\/www.projectmanager.com\/blog\/construction-contracts-best-practices\"\/>\n<link rel=\"alternate\" hreflang=\"es\" href=\"https:\/\/www.projectmanager.com\/es\/contrato-de-construccion\"\/>\n<link rel=\"alternate\" hreflang=\"fr\" href=\"https:\/\/www.projectmanager.com\/fr\/types-de-contrats-de-construction\"\/>\n<link rel=\"alternate\" hreflang=\"de\" href=\"https:\/\/www.projectmanager.com\/de\/bauvertragen\"\/>\n<link rel=\"alternate\" hreflang=\"x-default\" href=\"https:\/\/www.projectmanager.com\/blog\/construction-contracts-best-practices\"\/>","footnotes":""},"categories":[317,320,131],"tags":[],"class_list":["post-56880","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction","category-project-documents","category-blog"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>14 Types of Construction Contracts: Pros, Cons &amp; Best Practices<\/title>\n<meta name=\"description\" content=\"A construction contract is a formal agreement of terms between an owner and a contractor or specialist who intends to take on a job.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.projectmanager.com\/blog\/construction-contracts-best-practices\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"14 Types of Construction Contracts: Pros, Cons &amp; Best Practices\" \/>\n<meta property=\"og:description\" content=\"A construction contract is a formal agreement of terms between an owner and a contractor or specialist who intends to take on a job.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.projectmanager.com\/blog\/construction-contracts-best-practices\" \/>\n<meta property=\"og:site_name\" content=\"ProjectManager\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/projectmanage\/\" \/>\n<meta property=\"article:published_time\" content=\"2024-10-10T14:20:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-17T18:55:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.projectmanager.com\/wp-content\/uploads\/2023\/09\/construction-teams.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"770\" \/>\n\t<meta property=\"og:image:height\" content=\"502\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"William Malsam\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@Malsam_PM\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"William Malsam\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"18 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/construction-contracts-best-practices#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/construction-contracts-best-practices\"},\"author\":{\"name\":\"William Malsam\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#\\\/schema\\\/person\\\/3483ea14874d0b9e9a9532f8e4899a3c\"},\"headline\":\"14 Types of Construction Contracts: Pros, Cons &#038; Best Practices\",\"datePublished\":\"2024-10-10T14:20:00+00:00\",\"dateModified\":\"2026-07-17T18:55:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/construction-contracts-best-practices\"},\"wordCount\":3496,\"publisher\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/construction-contracts-best-practices#primaryimage\"},\"thumbnailUrl\":\"\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/construction-teams.jpg\",\"articleSection\":[\"Construction\",\"Project Documents\",\"Project Management Blog\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/construction-contracts-best-practices\",\"url\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/construction-contracts-best-practices\",\"name\":\"14 Types of Construction Contracts: Pros, Cons & Best Practices\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/construction-contracts-best-practices#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/construction-contracts-best-practices#primaryimage\"},\"thumbnailUrl\":\"\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/construction-teams.jpg\",\"datePublished\":\"2024-10-10T14:20:00+00:00\",\"dateModified\":\"2026-07-17T18:55:04+00:00\",\"description\":\"A construction contract is a formal agreement of terms between an owner and a contractor or specialist who intends to take on a job.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/construction-contracts-best-practices#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/construction-contracts-best-practices\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/construction-contracts-best-practices#primaryimage\",\"url\":\"\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/construction-teams.jpg\",\"contentUrl\":\"\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/construction-teams.jpg\",\"width\":770,\"height\":502,\"caption\":\"Construction Teams image\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/construction-contracts-best-practices#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.projectmanager.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"14 Types of Construction Contracts: Pros, Cons &#038; Best Practices\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#website\",\"url\":\"https:\\\/\\\/www.projectmanager.com\\\/\",\"name\":\"ProjectManager\",\"description\":\"The Best Project Management Software for Managing your Projects\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.projectmanager.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#organization\",\"name\":\"ProjectManager\",\"url\":\"https:\\\/\\\/www.projectmanager.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/ProjectManager-Logo-for-Website.png\",\"contentUrl\":\"\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/ProjectManager-Logo-for-Website.png\",\"width\":696,\"height\":696,\"caption\":\"ProjectManager\"},\"image\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/projectmanage\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/projectmanager.com\\\/\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/projectmanagervideos\",\"https:\\\/\\\/en.wikipedia.org\\\/wiki\\\/ProjectManager.com\"],\"description\":\"ProjectManager is a project and portfolio management software that offers online project management tools like Gantt charts, dashboards, kanban boards, task management features and more. With advanced planning and scheduling, automated cost and time tracking, risk analysis and resource management, our platform ensures flawless execution for construction, manufacturing and professional services teams, while providing unbeatable insights at every stage.\",\"legalName\":\"ProjectManager.com, Inc.\",\"foundingDate\":\"2008-01-01\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":\"11\",\"maxValue\":\"50\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#\\\/schema\\\/person\\\/3483ea14874d0b9e9a9532f8e4899a3c\",\"name\":\"William Malsam\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ee3696da4cbc91bc109142d860805e760b29e78d19b8fcab925873e4fb974260?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ee3696da4cbc91bc109142d860805e760b29e78d19b8fcab925873e4fb974260?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ee3696da4cbc91bc109142d860805e760b29e78d19b8fcab925873e4fb974260?s=96&d=mm&r=g\",\"caption\":\"William Malsam\"},\"description\":\"William is the Director of Content at ProjectManager.com. He writes and edits content for the website, blog, and bi-weekly newsletter.\",\"sameAs\":[\"https:\\\/\\\/x.com\\\/Malsam_PM\"],\"knowsAbout\":[\"Project management\",\"Project planning\",\"Blogs\"],\"knowsLanguage\":[\"English\"],\"jobTitle\":\"Project Management Expert Writer\",\"worksFor\":\"ProjectManager.com\",\"url\":\"https:\\\/\\\/www.projectmanager.com\\\/author\\\/williammalsam\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"14 Types of Construction Contracts: Pros, Cons & Best Practices","description":"A construction contract is a formal agreement of terms between an owner and a contractor or specialist who intends to take on a job.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.projectmanager.com\/blog\/construction-contracts-best-practices","og_locale":"en_US","og_type":"article","og_title":"14 Types of Construction Contracts: Pros, Cons & Best Practices","og_description":"A construction contract is a formal agreement of terms between an owner and a contractor or specialist who intends to take on a job.","og_url":"https:\/\/www.projectmanager.com\/blog\/construction-contracts-best-practices","og_site_name":"ProjectManager","article_publisher":"https:\/\/www.facebook.com\/projectmanage\/","article_published_time":"2024-10-10T14:20:00+00:00","article_modified_time":"2026-07-17T18:55:04+00:00","og_image":[{"width":770,"height":502,"url":"https:\/\/www.projectmanager.com\/wp-content\/uploads\/2023\/09\/construction-teams.jpg","type":"image\/jpeg"}],"author":"William Malsam","twitter_card":"summary_large_image","twitter_creator":"@Malsam_PM","twitter_misc":{"Written by":"William Malsam","Est. reading time":"18 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.projectmanager.com\/blog\/construction-contracts-best-practices#article","isPartOf":{"@id":"https:\/\/www.projectmanager.com\/blog\/construction-contracts-best-practices"},"author":{"name":"William Malsam","@id":"https:\/\/www.projectmanager.com\/#\/schema\/person\/3483ea14874d0b9e9a9532f8e4899a3c"},"headline":"14 Types of Construction Contracts: Pros, Cons &#038; Best Practices","datePublished":"2024-10-10T14:20:00+00:00","dateModified":"2026-07-17T18:55:04+00:00","mainEntityOfPage":{"@id":"https:\/\/www.projectmanager.com\/blog\/construction-contracts-best-practices"},"wordCount":3496,"publisher":{"@id":"https:\/\/www.projectmanager.com\/#organization"},"image":{"@id":"https:\/\/www.projectmanager.com\/blog\/construction-contracts-best-practices#primaryimage"},"thumbnailUrl":"\/wp-content\/uploads\/2023\/09\/construction-teams.jpg","articleSection":["Construction","Project Documents","Project Management Blog"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.projectmanager.com\/blog\/construction-contracts-best-practices","url":"https:\/\/www.projectmanager.com\/blog\/construction-contracts-best-practices","name":"14 Types of Construction Contracts: Pros, Cons & Best Practices","isPartOf":{"@id":"https:\/\/www.projectmanager.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.projectmanager.com\/blog\/construction-contracts-best-practices#primaryimage"},"image":{"@id":"https:\/\/www.projectmanager.com\/blog\/construction-contracts-best-practices#primaryimage"},"thumbnailUrl":"\/wp-content\/uploads\/2023\/09\/construction-teams.jpg","datePublished":"2024-10-10T14:20:00+00:00","dateModified":"2026-07-17T18:55:04+00:00","description":"A construction contract is a formal agreement of terms between an owner and a contractor or specialist who intends to take on a job.","breadcrumb":{"@id":"https:\/\/www.projectmanager.com\/blog\/construction-contracts-best-practices#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.projectmanager.com\/blog\/construction-contracts-best-practices"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.projectmanager.com\/blog\/construction-contracts-best-practices#primaryimage","url":"\/wp-content\/uploads\/2023\/09\/construction-teams.jpg","contentUrl":"\/wp-content\/uploads\/2023\/09\/construction-teams.jpg","width":770,"height":502,"caption":"Construction Teams image"},{"@type":"BreadcrumbList","@id":"https:\/\/www.projectmanager.com\/blog\/construction-contracts-best-practices#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.projectmanager.com\/"},{"@type":"ListItem","position":2,"name":"14 Types of Construction Contracts: Pros, Cons &#038; Best Practices"}]},{"@type":"WebSite","@id":"https:\/\/www.projectmanager.com\/#website","url":"https:\/\/www.projectmanager.com\/","name":"ProjectManager","description":"The Best Project Management Software for Managing your Projects","publisher":{"@id":"https:\/\/www.projectmanager.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.projectmanager.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.projectmanager.com\/#organization","name":"ProjectManager","url":"https:\/\/www.projectmanager.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.projectmanager.com\/#\/schema\/logo\/image\/","url":"\/wp-content\/uploads\/2026\/06\/ProjectManager-Logo-for-Website.png","contentUrl":"\/wp-content\/uploads\/2026\/06\/ProjectManager-Logo-for-Website.png","width":696,"height":696,"caption":"ProjectManager"},"image":{"@id":"https:\/\/www.projectmanager.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/projectmanage\/","https:\/\/www.linkedin.com\/company\/projectmanager.com\/","https:\/\/www.youtube.com\/user\/projectmanagervideos","https:\/\/en.wikipedia.org\/wiki\/ProjectManager.com"],"description":"ProjectManager is a project and portfolio management software that offers online project management tools like Gantt charts, dashboards, kanban boards, task management features and more. With advanced planning and scheduling, automated cost and time tracking, risk analysis and resource management, our platform ensures flawless execution for construction, manufacturing and professional services teams, while providing unbeatable insights at every stage.","legalName":"ProjectManager.com, Inc.","foundingDate":"2008-01-01","numberOfEmployees":{"@type":"QuantitativeValue","minValue":"11","maxValue":"50"}},{"@type":"Person","@id":"https:\/\/www.projectmanager.com\/#\/schema\/person\/3483ea14874d0b9e9a9532f8e4899a3c","name":"William Malsam","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/ee3696da4cbc91bc109142d860805e760b29e78d19b8fcab925873e4fb974260?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/ee3696da4cbc91bc109142d860805e760b29e78d19b8fcab925873e4fb974260?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ee3696da4cbc91bc109142d860805e760b29e78d19b8fcab925873e4fb974260?s=96&d=mm&r=g","caption":"William Malsam"},"description":"William is the Director of Content at ProjectManager.com. He writes and edits content for the website, blog, and bi-weekly newsletter.","sameAs":["https:\/\/x.com\/Malsam_PM"],"knowsAbout":["Project management","Project planning","Blogs"],"knowsLanguage":["English"],"jobTitle":"Project Management Expert Writer","worksFor":"ProjectManager.com","url":"https:\/\/www.projectmanager.com\/author\/williammalsam"}]}},"_links":{"self":[{"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/posts\/56880","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/users\/45"}],"replies":[{"embeddable":true,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/comments?post=56880"}],"version-history":[{"count":1,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/posts\/56880\/revisions"}],"predecessor-version":[{"id":81812,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/posts\/56880\/revisions\/81812"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/media\/68049"}],"wp:attachment":[{"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/media?parent=56880"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/categories?post=56880"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/tags?post=56880"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}