{"id":63477,"date":"2022-07-28T14:00:31","date_gmt":"2022-07-28T19:00:31","guid":{"rendered":"https:\/\/www.projectmanager.com\/?p=63477"},"modified":"2025-11-20T09:43:10","modified_gmt":"2025-11-20T15:43:10","slug":"design-development-architecture","status":"publish","type":"post","link":"https:\/\/www.projectmanager.com\/blog\/design-development-architecture","title":{"rendered":"What Is Design Development (DD) In Architecture?"},"content":{"rendered":"<p>Before setting foot on the construction site, a long process has already unfolded. The architecture design process allows a concept to become a reality. It takes place over several phases, one of the most important being design development.<\/p>\n<p>Design development (DD) in architecture is critical to the success of any construction project management plan. To see how it fits into the larger picture, let&#8217;s look at architecture design and the specifics of design development.<\/p>\n<h2>Understanding the Architecture Design Process<\/h2>\n<p>There are five phases to the architecture design process: schematic design, design development, construction documents, bidding and construction administration. Each phase is important to the smooth delivery of your construction project. This process helps turn a vacant lot or a preexisting building into the vision that the owner has for the property by refining the concept into a schematic design. This means the designer and owner work together to achieve the goals of the construction project in terms of scope, purpose and functionality.<\/p>\n<p>The design development phase executes the schematic design phase and further refines the details that were initially established. For example, the designer finalizes the schematic design that was approved by the client and begins the work on the general structural details for the building. This includes the placement of doors and windows as well as deciding on the materials that will be used in construction. There&#8217;s still give and take between the designer and the architect and costs are estimated but changes could still occur.<\/p>\n<p>Next, construction documents such as blueprints and technical specifications are executed, helping with the bidding phase, permit applications and other related documents that assist the general contractor when building. The fourth phase is bidding to connect the <a href=\"https:\/\/www.projectmanager.com\/blog\/how-to-manage-a-construction-company\">construction company<\/a> with the designer and owner. Lastly, the designer oversees the work to make sure the construction administration conforms to the plans.<\/p>\n<p>The architecture design process, including design development, is a collaborative affair. <a href=\"\/\">ProjectManager<\/a> is online construction project management software that\u2019s designed to connect everyone on the project team in real time. We make it easy to share files, comment on work and tag people to bring them into the conversation. Any updates automatically trigger email notifications and in-app alerts to keep everyone updated. That way the designer, owner and contractors are always available no matter where or when they work. Get started with ProjectManager today for free.<\/p>\n<figure id=\"attachment_63037\" aria-describedby=\"caption-attachment-63037\" style=\"width: 1554px\" class=\"wp-caption alignnone\"><a href=\"\/freetrial?edition=d&amp;cycle=year\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-63037 size-full\" src=\"\/wp-content\/uploads\/2022\/06\/Construction-overlay-CTA-Task.jpg\" alt=\"ProjectManager's task card with collaboration\" width=\"1554\" height=\"874\" srcset=\"\/wp-content\/uploads\/2022\/06\/Construction-overlay-CTA-Task.jpg 1554w, \/wp-content\/uploads\/2022\/06\/Construction-overlay-CTA-Task-600x337.jpg 600w, \/wp-content\/uploads\/2022\/06\/Construction-overlay-CTA-Task-300x169.jpg 300w, \/wp-content\/uploads\/2022\/06\/Construction-overlay-CTA-Task-768x432.jpg 768w, \/wp-content\/uploads\/2022\/06\/Construction-overlay-CTA-Task-1536x864.jpg 1536w, \/wp-content\/uploads\/2022\/06\/Construction-overlay-CTA-Task-450x253.jpg 450w, \/wp-content\/uploads\/2022\/06\/Construction-overlay-CTA-Task-384x216.jpg 384w, \/wp-content\/uploads\/2022\/06\/Construction-overlay-CTA-Task-800x451.jpg 800w\" sizes=\"auto, (max-width: 1554px) 100vw, 1554px\" \/><\/a><figcaption id=\"caption-attachment-63037\" class=\"wp-caption-text\">ProjectManager fosters better collaboration with real-time data. <a href=\"\/software\/collaboration\"><strong>Learn more<\/strong><\/a><\/figcaption><\/figure>\n<h2>What Is the Purpose of Design Development (DD)?<\/h2>\n<p>Design development is an important phase in the architecture design process as it\u2019s easier to make changes on paper (or digitally) than after construction has started. Design development takes more precise measurements and adds details to the final <a href=\"https:\/\/www.projectmanager.com\/blog\/construction-documents\">construction documents<\/a> so the cost estimation is more precise.<\/p>\n<p>This is key to accepting the <a href=\"https:\/\/www.projectmanager.com\/blog\/construction-bids-mastering-construction-bidding\">right bid for the job<\/a>. If you send misinformation, you\u2019ll pay the difference when it\u2019s too late to make changes. Connecting with the right contractor is critical for a successful construction project. Not only will you need to accurately forecast your cost estimates, but you need to document the work to find a general contractor with the necessary expertise.<\/p>\n<p>The main purpose of the design development phase is to define and develop the important aspects of the project including the exterior and interior of the building, layouts, room sizes and the materials you\u2019ll need. Engineers also contribute to the heating, ventilation and air conditioning (HVAC), plumbing and electrical systems.<\/p>\n<p>The purpose of the design development is not, however, to supply instructions on how to install the system, <a href=\"https:\/\/www.projectmanager.com\/blog\/construction-quality-control\">quality control requirements<\/a> and other technical information. While an updated cost estimation is often done at this phase, the design development isn&#8217;t a specification book, which has written instructions for the drawings and is done later in the process.<\/p>\n<div class=\"template-download-holder\">\n\t<div class=\"template-download-image-holder\">\n\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"900\" src=\"\/wp-content\/uploads\/2024\/02\/Quality-control-template.jpg\" class=\"attachment-large size-large\" alt=\"Quality Control Template\" srcset=\"\/wp-content\/uploads\/2024\/02\/Quality-control-template.jpg 1600w, \/wp-content\/uploads\/2024\/02\/Quality-control-template-600x338.jpg 600w, \/wp-content\/uploads\/2024\/02\/Quality-control-template-300x169.jpg 300w, \/wp-content\/uploads\/2024\/02\/Quality-control-template-768x432.jpg 768w, \/wp-content\/uploads\/2024\/02\/Quality-control-template-1536x864.jpg 1536w, \/wp-content\/uploads\/2024\/02\/Quality-control-template-450x253.jpg 450w, \/wp-content\/uploads\/2024\/02\/Quality-control-template-384x216.jpg 384w, \/wp-content\/uploads\/2024\/02\/Quality-control-template-800x451.jpg 800w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/>\t<\/div><p class=\"intro\">Get your free<\/p>\n<h3>Quality Control Template<\/h3>\n<p class=\"subtitle\">\n\tUse this free Quality Control Template to manage your projects better.<\/p>\n\t<a class=\"button green\" href=\"https:\/\/www.projectmanager.com\/templates\/quality-control-template\">Get the Template<\/a>\n<\/div> \n\n<p>&nbsp;<\/p>\n<h2>Design Development Documents<\/h2>\n<p>The design development phase of the architecture design process is made up of various documents that together define the parameters of the project. These design development documents include civil drawings, architectural drawings, structural drawings and mechanical drawings. Let\u2019s take a closer look at each type.<\/p>\n<h3>Civil Drawings<\/h3>\n<p>A civil drawing also called a site drawing, is a technical drawing that contains grading, landscaping and other construction site details. These drawings have plans, cross-sections and profiles that give the civil engineer a clear picture of everything to be found at the construction project&#8217;s location. Civil drawings are used in the construction of bridges, buildings, canals, harbors, roadways, railroads, pipelines, public utility systems and more.<\/p>\n<h3>Architectural Drawings<\/h3>\n<p>Architectural drawings are sketches, diagrams, plans or schematics used in the <a href=\"https:\/\/www.projectmanager.com\/blog\/architectural-design-process\">design process<\/a> and during construction. The drawings show the inside and outside of the structure&#8217;s appearance and have precise measurements and details to execute the construction plan. There are multiple drawings with sheets indicating different aspects of the construction including everything from electrical and mechanical systems to plumbing. These drawings are often reproduced in the blueprint process and are sometimes created by computer-aided design (CAD) tools.<\/p>\n<h3>Structural Drawings<\/h3>\n<p>Structural drawings are engineering drawings that detail the building structure and process. Registered engineers create structural drawings that are based on architectural drawings. These deal with load-carrying parts of the structure and show the size, dimensions and materials that should be used. Structural drawings don\u2019t detail surface finishes, partition walls or even mechanical systems, they&#8217;re only structural and require approval from the building authority.<\/p>\n<h3>Mechanical Drawings<\/h3>\n<p>Mechanical drawings show the various mechanical systems in the building including HVAC, elevators or escalators. All HVAC work must first be planned with mechanical drawings and they use the floor and ceiling plans as guides. When completed, the mechanical drawings are added to the construction drawings, which are all used in the permitting process. They also help with the <a href=\"https:\/\/www.projectmanager.com\/blog\/basics-project-cost-management\">cost estimates<\/a> and the bidding process.<\/p>\n<h2>Elements of Design Development (DD)<\/h2>\n<p>There are five deliverables during the design development phase of the architecture design process: plans, sections, elevations, materials and specifications. We\u2019ve already talked about them in the context of defining design development and the various documents that are part of that process. They\u2019re critical to providing the client with preliminary pricing on the project so it\u2019s worth covering the specifics.<\/p>\n<h3>1. Plans<\/h3>\n<p>The plans include the floor and reflected ceiling plans for every level of the structure. These plans should be as complete as possible with the exception of minor details. They should define programmatic areas, such as lobbies, restrooms, residential units, classrooms, etc.<\/p>\n<p><strong>Related:<\/strong> <a href=\"https:\/\/www.projectmanager.com\/templates\/project-plan-template\">Free Project Plan for Word<\/a><\/p>\n<h3>2. Sections<\/h3>\n<p>As the name implies, these are section drawings including wall and detail sections. They are drawn to scale, showing clearance, infrastructure, adjacent context and any other helpful references.<\/p>\n<h3>3. Elevations<\/h3>\n<p>Elevation of the site is crucial to construction, as well as elevation for the structure itself. As for the building, facade considerations are included with dimensions and materials. All openings, such as fixed and operable doors and windows, should be indicated.<\/p>\n<h3>4. Materials<\/h3>\n<p>This isn&#8217;t a complete <a href=\"https:\/\/www.projectmanager.com\/blog\/material-takeoff-in-construction\">list of materials<\/a>, at least not at this phase in the architecture design process, but it shows the basic materials for all elements of the structure, envelope and interior. These materials should be noted and coordinated graphically across all the drawings. The draft finish schedule, which includes the floor, wall and ceiling finishes, is also included.<\/p>\n<h3>5. Specifications<\/h3>\n<p>Again, specifications will not be complete at this point in the process, however, an outline document is needed. This helps with creating more accurate construction documents and also assists in the bidding and construction of the project.<\/p>\n<h2>How ProjectManager Helps with Design Development<\/h2>\n<p>While straightforward, the design development and larger architecture design process involve a lot of back and forth. For effective collaboration, it\u2019s important that everyone is always working on the most up-to-date documents. With unlimited file storage, ProjectManager\u2019s <a href=\"https:\/\/www.projectmanager.com\/industries\/construction-project-management\">online construction project management software<\/a> ensures that everything is updated and at your fingertips.<\/p>\n<h3>Work Using Your Choice of Tools<\/h3>\n<p>The design development done by the architect and the design team requires owner input as well as feedback from the general contractor and subcontractors. These are very distinct disciplines that use different tools. Designers tend to like the visual workflow kanban boards, construction companies plan schedules and resources on more detailed Gantts and their crews check off work on list views. Owners have a higher view and rather see a calendar with milestones to ensure the project is on target. Our software has multiple project views that are updated automatically and in real time so there\u2019s one source of truth.<\/p>\n<h3><a href=\"\/software\/gantt-chart\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-63410 size-full\" src=\"\/wp-content\/uploads\/2022\/07\/Construction-Gantt-Costs-Resources.jpg\" alt=\"ProjectManager's Gantt chart\" width=\"2554\" height=\"1372\" srcset=\"\/wp-content\/uploads\/2022\/07\/Construction-Gantt-Costs-Resources.jpg 2554w, \/wp-content\/uploads\/2022\/07\/Construction-Gantt-Costs-Resources-600x322.jpg 600w, \/wp-content\/uploads\/2022\/07\/Construction-Gantt-Costs-Resources-1600x860.jpg 1600w, \/wp-content\/uploads\/2022\/07\/Construction-Gantt-Costs-Resources-300x161.jpg 300w, \/wp-content\/uploads\/2022\/07\/Construction-Gantt-Costs-Resources-768x413.jpg 768w, \/wp-content\/uploads\/2022\/07\/Construction-Gantt-Costs-Resources-1536x825.jpg 1536w, \/wp-content\/uploads\/2022\/07\/Construction-Gantt-Costs-Resources-2048x1100.jpg 2048w, \/wp-content\/uploads\/2022\/07\/Construction-Gantt-Costs-Resources-450x242.jpg 450w\" sizes=\"auto, (max-width: 2554px) 100vw, 2554px\" \/><\/a><br \/>\nTrack Your Construction Design in Real Time<\/h3>\n<p>The design team is responsible for making sure the general contractor executes the plans correctly. Ensuring that everything is going according to plan, especially if you\u2019re not on the job site, requires real-time monitoring. Our live dashboards automatically capture and calculate six project metrics, which are displayed in easy-to-read graphs and charts. No setup is required and there are even customizable reports to delve deeper into the data. Dashboards can also be shared to update owners on progress.<\/p>\n<a href=\"\/software\/dashboard\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-62654 size-full\" src=\"\/wp-content\/uploads\/2022\/05\/Dashboard_Construction_Wide_Zoom-150.webp\" alt=\"dashboard showing project metrics in real-time\" width=\"1568\" height=\"816\" srcset=\"\/wp-content\/uploads\/2022\/05\/Dashboard_Construction_Wide_Zoom-150.webp 1568w, \/wp-content\/uploads\/2022\/05\/Dashboard_Construction_Wide_Zoom-150-600x312.webp 600w, \/wp-content\/uploads\/2022\/05\/Dashboard_Construction_Wide_Zoom-150-300x156.webp 300w, \/wp-content\/uploads\/2022\/05\/Dashboard_Construction_Wide_Zoom-150-768x400.webp 768w, \/wp-content\/uploads\/2022\/05\/Dashboard_Construction_Wide_Zoom-150-1536x799.webp 1536w, \/wp-content\/uploads\/2022\/05\/Dashboard_Construction_Wide_Zoom-150-450x234.webp 450w\" sizes=\"auto, (max-width: 1568px) 100vw, 1568px\" \/><\/a>\n<p>Our software is equipped with features that carry you from design through construction to deliver success. Once you have the design development done, general contractors can plan schedules, resources and more. Everyone on the construction project team is connected whether on-site, in the office or working remotely. Make sure your design is executed properly and on time with resource management tools and more.<\/p>\n<p><em>ProjectManager is award-winning software that helps with design development, planning, monitoring and reporting on your construction project. Plus, it\u2019s all on a collaborative platform that connects everyone on the construction project team in real time so they can work better together. <a href=\"\/freetrial?edition=d&amp;cycle=year\">Get started with ProjectManager today for free.<\/a><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Before setting foot on the construction site, a long process has already unfolded. The architecture design process allows a concept&#8230;<br \/><a class=\"excerpt-read-more button blue\" href=\"https:\/\/www.projectmanager.com\/blog\/design-development-architecture\">Read More<\/a><\/p>\n","protected":false},"author":80,"featured_media":63586,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_yoast_wpseo_meta-robots-noindex":0,"_yoast_wpseo_canonical":"","_yoast_wpseo_opengraph-title":"","_yoast_wpseo_opengraph-description":"","_yoast_wpseo_opengraph-image":"","_yoast_wpseo_twitter-title":"","_yoast_wpseo_twitter-description":"","head_code_insert":"","footnotes":""},"categories":[317,195,131,233],"tags":[],"class_list":["post-63477","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction","category-planning","category-blog","category-risk-management"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>What Is Design Development (DD) In Architecture?<\/title>\n<meta name=\"description\" content=\"Design development is a key step toward executing a smooth construction project. Learn what you need for design development.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.projectmanager.com\/blog\/design-development-architecture\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"What Is Design Development (DD) In Architecture?\" \/>\n<meta property=\"og:description\" content=\"Design development is a key step toward executing a smooth construction project. Learn what you need for design development.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.projectmanager.com\/blog\/design-development-architecture\" \/>\n<meta property=\"og:site_name\" content=\"ProjectManager\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/projectmanage\/\" \/>\n<meta property=\"article:published_time\" content=\"2022-07-28T19:00:31+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-11-20T15:43:10+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.projectmanager.com\/wp-content\/uploads\/2022\/07\/220726-BLOG-DesignDevelopment.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"940\" \/>\n\t<meta property=\"og:image:height\" content=\"540\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Brenna Schwartz\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Brenna Schwartz\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/design-development-architecture#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/design-development-architecture\"},\"author\":{\"name\":\"Brenna Schwartz\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#\\\/schema\\\/person\\\/3babbf5a52c750fb25915b3364446afd\"},\"headline\":\"What Is Design Development (DD) In Architecture?\",\"datePublished\":\"2022-07-28T19:00:31+00:00\",\"dateModified\":\"2025-11-20T15:43:10+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/design-development-architecture\"},\"wordCount\":1638,\"publisher\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/design-development-architecture#primaryimage\"},\"thumbnailUrl\":\"\\\/wp-content\\\/uploads\\\/2022\\\/07\\\/220726-BLOG-DesignDevelopment.jpg\",\"articleSection\":[\"Construction\",\"Planning\",\"Project Management Blog\",\"Risk Management\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/design-development-architecture\",\"url\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/design-development-architecture\",\"name\":\"What Is Design Development (DD) In Architecture?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/design-development-architecture#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/design-development-architecture#primaryimage\"},\"thumbnailUrl\":\"\\\/wp-content\\\/uploads\\\/2022\\\/07\\\/220726-BLOG-DesignDevelopment.jpg\",\"datePublished\":\"2022-07-28T19:00:31+00:00\",\"dateModified\":\"2025-11-20T15:43:10+00:00\",\"description\":\"Design development is a key step toward executing a smooth construction project. Learn what you need for design development.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/design-development-architecture#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/design-development-architecture\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/design-development-architecture#primaryimage\",\"url\":\"\\\/wp-content\\\/uploads\\\/2022\\\/07\\\/220726-BLOG-DesignDevelopment.jpg\",\"contentUrl\":\"\\\/wp-content\\\/uploads\\\/2022\\\/07\\\/220726-BLOG-DesignDevelopment.jpg\",\"width\":940,\"height\":540},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/design-development-architecture#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.projectmanager.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"What Is Design Development (DD) In Architecture?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#website\",\"url\":\"https:\\\/\\\/www.projectmanager.com\\\/\",\"name\":\"ProjectManager\",\"description\":\"The Best Project Management Software for Managing your Projects\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.projectmanager.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#organization\",\"name\":\"ProjectManager\",\"url\":\"https:\\\/\\\/www.projectmanager.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/ProjectManager-Logo-for-Website.png\",\"contentUrl\":\"\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/ProjectManager-Logo-for-Website.png\",\"width\":696,\"height\":696,\"caption\":\"ProjectManager\"},\"image\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/projectmanage\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/projectmanager.com\\\/\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/projectmanagervideos\",\"https:\\\/\\\/en.wikipedia.org\\\/wiki\\\/ProjectManager.com\"],\"description\":\"ProjectManager is a project and portfolio management software that offers online project management tools like Gantt charts, dashboards, kanban boards, task management features and more. With advanced planning and scheduling, automated cost and time tracking, risk analysis and resource management, our platform ensures flawless execution for construction, manufacturing and professional services teams, while providing unbeatable insights at every stage.\",\"legalName\":\"ProjectManager.com, Inc.\",\"foundingDate\":\"2008-01-01\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":\"11\",\"maxValue\":\"50\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#\\\/schema\\\/person\\\/3babbf5a52c750fb25915b3364446afd\",\"name\":\"Brenna Schwartz\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1aa8033dcde585fba7a7c89a36a3c3b77f3a1edc74e8af777cea42a9c36baf14?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1aa8033dcde585fba7a7c89a36a3c3b77f3a1edc74e8af777cea42a9c36baf14?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1aa8033dcde585fba7a7c89a36a3c3b77f3a1edc74e8af777cea42a9c36baf14?s=96&d=mm&r=g\",\"caption\":\"Brenna Schwartz\"},\"description\":\"Brenna Koeneke is ProjectManager's Content Marketing Manager with over five years of professional writing and editing experience. She lives in Denver where she produces white papers, eBooks and other long-form content.\",\"url\":\"https:\\\/\\\/www.projectmanager.com\\\/author\\\/brennakoeneke\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"What Is Design Development (DD) In Architecture?","description":"Design development is a key step toward executing a smooth construction project. Learn what you need for design development.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.projectmanager.com\/blog\/design-development-architecture","og_locale":"en_US","og_type":"article","og_title":"What Is Design Development (DD) In Architecture?","og_description":"Design development is a key step toward executing a smooth construction project. Learn what you need for design development.","og_url":"https:\/\/www.projectmanager.com\/blog\/design-development-architecture","og_site_name":"ProjectManager","article_publisher":"https:\/\/www.facebook.com\/projectmanage\/","article_published_time":"2022-07-28T19:00:31+00:00","article_modified_time":"2025-11-20T15:43:10+00:00","og_image":[{"width":940,"height":540,"url":"https:\/\/www.projectmanager.com\/wp-content\/uploads\/2022\/07\/220726-BLOG-DesignDevelopment.jpg","type":"image\/jpeg"}],"author":"Brenna Schwartz","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Brenna Schwartz","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.projectmanager.com\/blog\/design-development-architecture#article","isPartOf":{"@id":"https:\/\/www.projectmanager.com\/blog\/design-development-architecture"},"author":{"name":"Brenna Schwartz","@id":"https:\/\/www.projectmanager.com\/#\/schema\/person\/3babbf5a52c750fb25915b3364446afd"},"headline":"What Is Design Development (DD) In Architecture?","datePublished":"2022-07-28T19:00:31+00:00","dateModified":"2025-11-20T15:43:10+00:00","mainEntityOfPage":{"@id":"https:\/\/www.projectmanager.com\/blog\/design-development-architecture"},"wordCount":1638,"publisher":{"@id":"https:\/\/www.projectmanager.com\/#organization"},"image":{"@id":"https:\/\/www.projectmanager.com\/blog\/design-development-architecture#primaryimage"},"thumbnailUrl":"\/wp-content\/uploads\/2022\/07\/220726-BLOG-DesignDevelopment.jpg","articleSection":["Construction","Planning","Project Management Blog","Risk Management"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.projectmanager.com\/blog\/design-development-architecture","url":"https:\/\/www.projectmanager.com\/blog\/design-development-architecture","name":"What Is Design Development (DD) In Architecture?","isPartOf":{"@id":"https:\/\/www.projectmanager.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.projectmanager.com\/blog\/design-development-architecture#primaryimage"},"image":{"@id":"https:\/\/www.projectmanager.com\/blog\/design-development-architecture#primaryimage"},"thumbnailUrl":"\/wp-content\/uploads\/2022\/07\/220726-BLOG-DesignDevelopment.jpg","datePublished":"2022-07-28T19:00:31+00:00","dateModified":"2025-11-20T15:43:10+00:00","description":"Design development is a key step toward executing a smooth construction project. Learn what you need for design development.","breadcrumb":{"@id":"https:\/\/www.projectmanager.com\/blog\/design-development-architecture#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.projectmanager.com\/blog\/design-development-architecture"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.projectmanager.com\/blog\/design-development-architecture#primaryimage","url":"\/wp-content\/uploads\/2022\/07\/220726-BLOG-DesignDevelopment.jpg","contentUrl":"\/wp-content\/uploads\/2022\/07\/220726-BLOG-DesignDevelopment.jpg","width":940,"height":540},{"@type":"BreadcrumbList","@id":"https:\/\/www.projectmanager.com\/blog\/design-development-architecture#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.projectmanager.com\/"},{"@type":"ListItem","position":2,"name":"What Is Design Development (DD) In Architecture?"}]},{"@type":"WebSite","@id":"https:\/\/www.projectmanager.com\/#website","url":"https:\/\/www.projectmanager.com\/","name":"ProjectManager","description":"The Best Project Management Software for Managing your Projects","publisher":{"@id":"https:\/\/www.projectmanager.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.projectmanager.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.projectmanager.com\/#organization","name":"ProjectManager","url":"https:\/\/www.projectmanager.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.projectmanager.com\/#\/schema\/logo\/image\/","url":"\/wp-content\/uploads\/2026\/06\/ProjectManager-Logo-for-Website.png","contentUrl":"\/wp-content\/uploads\/2026\/06\/ProjectManager-Logo-for-Website.png","width":696,"height":696,"caption":"ProjectManager"},"image":{"@id":"https:\/\/www.projectmanager.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/projectmanage\/","https:\/\/www.linkedin.com\/company\/projectmanager.com\/","https:\/\/www.youtube.com\/user\/projectmanagervideos","https:\/\/en.wikipedia.org\/wiki\/ProjectManager.com"],"description":"ProjectManager is a project and portfolio management software that offers online project management tools like Gantt charts, dashboards, kanban boards, task management features and more. With advanced planning and scheduling, automated cost and time tracking, risk analysis and resource management, our platform ensures flawless execution for construction, manufacturing and professional services teams, while providing unbeatable insights at every stage.","legalName":"ProjectManager.com, Inc.","foundingDate":"2008-01-01","numberOfEmployees":{"@type":"QuantitativeValue","minValue":"11","maxValue":"50"}},{"@type":"Person","@id":"https:\/\/www.projectmanager.com\/#\/schema\/person\/3babbf5a52c750fb25915b3364446afd","name":"Brenna Schwartz","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/1aa8033dcde585fba7a7c89a36a3c3b77f3a1edc74e8af777cea42a9c36baf14?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/1aa8033dcde585fba7a7c89a36a3c3b77f3a1edc74e8af777cea42a9c36baf14?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1aa8033dcde585fba7a7c89a36a3c3b77f3a1edc74e8af777cea42a9c36baf14?s=96&d=mm&r=g","caption":"Brenna Schwartz"},"description":"Brenna Koeneke is ProjectManager's Content Marketing Manager with over five years of professional writing and editing experience. She lives in Denver where she produces white papers, eBooks and other long-form content.","url":"https:\/\/www.projectmanager.com\/author\/brennakoeneke"}]}},"_links":{"self":[{"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/posts\/63477","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/users\/80"}],"replies":[{"embeddable":true,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/comments?post=63477"}],"version-history":[{"count":0,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/posts\/63477\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/media\/63586"}],"wp:attachment":[{"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/media?parent=63477"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/categories?post=63477"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/tags?post=63477"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}