{"id":69718,"date":"2024-03-08T14:00:39","date_gmt":"2024-03-08T20:00:39","guid":{"rendered":"https:\/\/www.projectmanager.com\/?p=69718"},"modified":"2026-04-28T14:42:40","modified_gmt":"2026-04-28T19:42:40","slug":"rfi-in-construction","status":"publish","type":"post","link":"https:\/\/www.projectmanager.com\/blog\/rfi-in-construction","title":{"rendered":"RFI in Construction: A Quick Guide for Contractors"},"content":{"rendered":"<p>An army of subcontractors each with their own specific discipline complete construction projects. But how do they know what to work on? An RFI in construction is a request for information. This construction document helps subcontractors understand what they need to do if they have any questions.<\/p>\n<p>First, we\u2019ll explain what an RFI in construction is and then list what should be included in one. We\u2019ll also note the difference between an RFI in construction and other <a href=\"\/guides\/construction-project-management\">construction project management<\/a> documents before going into the construction RFI process, the different types of RFIs and more.<\/p>\n<h2>What Is an RFI in Construction?<\/h2>\n<p>An RFI in construction is a process for getting clarification about documents, drawings, specifications or other project conditions when there are questions or confusion about what to do. The <a href=\"https:\/\/www.projectmanager.com\/blog\/request-for-information\">request for information<\/a> identifies these information gaps or ambiguities and the decisions regarding them are shared over the project&#8217;s life cycle.<\/p>\n<p>The general contractor or the subcontractor will submit an RFI in construction, which isn&#8217;t only a process for clarifying issues, but it\u2019s also a contractual obligation. Notification of errors, conflicts or omissions discovered on the job site on the construction documentation must be made. The written form of an RFI in construction retrieves this information from a design, engineering or construction professional.<\/p>\n<p>Clarifying information that wasn\u2019t included or unclear in the scope of the construction contract is critical to delivering a project on time, within budget and meeting quality standards. Once those issues have been resolved, the general contractor and subcontractor need to stay in constant communication. The general contractor will create project plans and schedules with <a href=\"\/guides\/gantt-chart\">Gantt charts<\/a>, but subcontractors need different tools to execute their work.<\/p>\n<p><a href=\"\/\">ProjectManager<\/a> is award-winning construction project management software that has multiple project views that update in real time to foster collaboration. General contractors can link dependencies, filter for the critical path and set a baseline to track project variance, while subcontractors can view the project with the visual workflow of a kanban board, manage work with task lists or use the sheet or calendar view. All views are updated together to keep everyone on the same page. Get started with ProjectManager today for free.<\/p>\n<figure id=\"attachment_63413\" aria-describedby=\"caption-attachment-63413\" style=\"width: 1554px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.projectmanager.com\/freetrial\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-63413 size-full\" src=\"\/wp-content\/uploads\/2022\/07\/construction-gantt-resources-costs-150-CTA-BUTTON-1.jpg\" alt=\"ProjectManager's Gantt chart\" width=\"1554\" height=\"831\" srcset=\"\/wp-content\/uploads\/2022\/07\/construction-gantt-resources-costs-150-CTA-BUTTON-1.jpg 1554w, \/wp-content\/uploads\/2022\/07\/construction-gantt-resources-costs-150-CTA-BUTTON-1-600x321.jpg 600w, \/wp-content\/uploads\/2022\/07\/construction-gantt-resources-costs-150-CTA-BUTTON-1-300x160.jpg 300w, \/wp-content\/uploads\/2022\/07\/construction-gantt-resources-costs-150-CTA-BUTTON-1-768x411.jpg 768w, \/wp-content\/uploads\/2022\/07\/construction-gantt-resources-costs-150-CTA-BUTTON-1-1536x821.jpg 1536w, \/wp-content\/uploads\/2022\/07\/construction-gantt-resources-costs-150-CTA-BUTTON-1-450x241.jpg 450w\" sizes=\"auto, (max-width: 1554px) 100vw, 1554px\" \/><\/a><figcaption id=\"caption-attachment-63413\" class=\"wp-caption-text\">ProjectManager\u2019s Gantt charts are powerful planning and scheduling tools. <a href=\"\/software\/gantt-chart\" target=\"_blank\" rel=\"noopener\">Learn more<\/a><\/figcaption><\/figure>\n<h2>What Should Be Included in a Construction RFI?<\/h2>\n<p>There\u2019s no one-size-fits-all construction RFI. They can include many different categories depending on their purpose. The list below isn&#8217;t definitive but includes those categories that a typical RFI in construction will include.<\/p>\n<ul>\n<li><strong>Design clarifications:<\/strong> Clarifies conflicts, incomplete plans and specifications<\/li>\n<li><strong>Design change:<\/strong> Notes changes that come about due to construction errors, sequencing problems, etc.<\/li>\n<li><strong>Substitutions:<\/strong> This can include value engineering, material availability and ease of use to name a few<\/li>\n<li><strong>Project details:<\/strong> The name, address and other identifying information<\/li>\n<li><strong>Addresser\u2019s details:<\/strong> Such as company name and contact information<\/li>\n<li><strong>RFI number:<\/strong> This usually starts with a zero and increases by one with each new request<\/li>\n<li><strong>Description:<\/strong> Detailed description of the RFI<\/li>\n<li><strong>Date:<\/strong> When RFI was submitted and the deadline for response<\/li>\n<li><strong>Contract terms:<\/strong> Verifying the specifics of a contract when unclear<\/li>\n<\/ul>\n<h2>How Does a Construction RFI Differ From Other Construction Request Documents?<\/h2>\n<p>An RFI in construction is but one of many construction documents. Each document has a specific meaning and is unique from the others. There are several different types of request <a href=\"https:\/\/www.projectmanager.com\/blog\/construction-documents\">documents in construction<\/a>, each with its purpose. Let\u2019s define a few in comparison to an RFI in construction.<\/p>\n<h3>Request for Information (RFI) vs. Request for Proposal (RFP)<\/h3>\n<p>A <a href=\"https:\/\/www.projectmanager.com\/blog\/rfp-request-for-proposals-templates\">request for proposal<\/a> is asking for in-depth project information. This could be things such as methods, timelines and specific pricing details. These are mostly used by the client who is requesting a detailed understanding of the requirements to finish the project. As we\u2019ve already defined, RFI construction documents clarify questions about specifics during construction.<\/p>\n<h3>Request for Information (RFI) vs. Request for Quote (RFQ)<\/h3>\n<p>A request for quote is also generally used when a client needs information about a specific product or service, rather than clarification over some omission, as with an RFI construction document. The RFQ asks how a vendor or contractor should handle a specific aspect of a project, from cost estimation to work descriptions. You can use our free <a href=\"\/templates\/request-for-quote-rfq-template\">request for quote template<\/a> (RFQ) to help you get started.<\/p>\n<h3>Request for Information (RFI) vs. Request for Tender (RFT)<\/h3>\n<p>A request for tender is more specific than either an RFI, RFQ or RFP. The respondent sets clear and binding terms if the tender is accepted. It\u2019s a request for a contract and the response is considered legally binding. This is different from an RFI construction document that answers questions regarding the clarity of something.<\/p>\n<div class=\"template-download-holder\">\n\t<div class=\"template-download-image-holder\">\n\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"900\" src=\"\/wp-content\/uploads\/2021\/01\/Request-for-Information-RFI-Template.png\" class=\"attachment-large size-large\" alt=\"\" srcset=\"\/wp-content\/uploads\/2021\/01\/Request-for-Information-RFI-Template.png 1600w, \/wp-content\/uploads\/2021\/01\/Request-for-Information-RFI-Template-600x338.png 600w, \/wp-content\/uploads\/2021\/01\/Request-for-Information-RFI-Template-300x169.png 300w, \/wp-content\/uploads\/2021\/01\/Request-for-Information-RFI-Template-768x432.png 768w, \/wp-content\/uploads\/2021\/01\/Request-for-Information-RFI-Template-1536x864.png 1536w, \/wp-content\/uploads\/2021\/01\/Request-for-Information-RFI-Template-450x253.png 450w, \/wp-content\/uploads\/2021\/01\/Request-for-Information-RFI-Template-384x216.png 384w, \/wp-content\/uploads\/2021\/01\/Request-for-Information-RFI-Template-800x451.png 800w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/>\t<\/div><p class=\"intro\">Get your free<\/p>\n<h3>RFI Template<\/h3>\n<p class=\"subtitle\">\n\tUse this free RFI Template  for Word to manage your projects better.<\/p>\n\t\t<button type=\"button\" data-file-id=\"68255\" data-categoryname=\"In blog post\" class=\"button green template-lightbox-trigger-68255\">Download Word File<\/button>\n\t<\/div> \n\n<p>&nbsp;<\/p>\n<h2>The Construction RFI Process<\/h2>\n<p>The RFI process can take many shapes and forms. A subcontractor might ask for an RFI from a general contractor, or it can be the general contractor using an RFI to get more information from the architect or project owner. Anyone can use an RFI document to ask for more information about a construction project.<\/p>\n<p>Usually, it\u2019s the party executing the work that finds gaps and missing information in construction documents like the <a href=\"https:\/\/www.projectmanager.com\/training\/write-scope-work\">scope of work<\/a> or construction blueprints. They can\u2019t complete the work if they\u2019re missing any information, so they use the RFI. There are different ways to approach the construction RFI process, but it will generally follow these steps.<\/p>\n<h3>1. Soliciting Party Asks for More Information Using an RFI<\/h3>\n<p>The <a href=\"\/blog\/construction-general-contractor\">general contractor<\/a> or subcontractor writes the RFI construction document to clarify something, such as the contract, design, specifications or standards. The RFI is then submitted to the party with the information to answer the question.<\/p>\n<h3>2. The Receiving Party Reviews the RFI and Sends the Requested Information<\/h3>\n<p>The RFI is accepted and reviewed. If the RFI can be answered, it&#8217;s returned to the soliciting party. If not, it&#8217;s sent to the architect, engineer, consultant, subcontractor, client or appropriate person to answer it in detail.<\/p>\n<h3>3. Soliciting Party Evaluates the Response<\/h3>\n<p>The soliciting party then looks over the response to their RFI and, if no further clarification is required, the work commences again. If not, the soliciting party will review and resubmit the RFI and the process is repeated.<\/p>\n<h2>What Are the Benefits of Using an RFI?<\/h2>\n<p>Using an RFI construction document is beneficial in many ways. It helps projects with a higher level of uncertainty run more smoothly. RFIs clarify information that might not be well described and provide certainty where there is uncertainty.<\/p>\n<p>It also helps in understanding the <a href=\"https:\/\/www.projectmanager.com\/blog\/construction-budget-quick-guide\">construction budget<\/a> by providing a better understanding of the cost of an item or service. This allows one to survey more suppliers to get an average cost for the item or service.<\/p>\n<p>Having an RFI construction document also gathers information in a formal, structured and comparable way. It shows suppliers that they\u2019re in competition and one\u2019s decision is based on specific information and not prejudice for a preferred supplier. All this saves time and resources, streamlines the procure-to-pay process and promotes healthy competition.<\/p>\n<h2>Types of Construction RFIs<\/h2>\n<p>There are many types of construction RFIs, more than a dozen primary types. Here are some of the more commonly used ones.<\/p>\n<ul>\n<li><strong>Design Construction RFI:<\/strong> Organizes, communicates and coordinates the design and associated documents for the project participants<\/li>\n<li><strong>Feasibility Construction RFI:<\/strong> Addresses concerns with the project\u2019s feasibility as brought up in the <a href=\"\/training\/how-to-conduct-a-feasibility-study\">feasibility study<\/a><\/li>\n<li><strong>Change Construction RFI:<\/strong> Can be for a change in specifications, materials or methods in the project<\/li>\n<li><strong>Resource Scheduling Construction RFI:<\/strong> When the need to adjust the project\u2019s timeline is identified<\/li>\n<li><strong>Incomplete Specifications RFI:<\/strong> When a specification appears incomplete<\/li>\n<li><strong>Scope Construction RFI:<\/strong> When something in the original <a href=\"\/training\/write-scope-work\">scope of work<\/a> is unnecessary and is proposed to be removed<\/li>\n<li><strong>Construction Site RFI:<\/strong> Request to organize and coordinate construction-related procedures, schedules and safety items<\/li>\n<\/ul>\n<h2>RFI Construction Example<\/h2>\n<p>To better illustrate what a construction RFI is, let\u2019s look at an example. For instance, if Acme Construction was working on erecting an apartment building, but the subcontractor responsible for the flooring noted that the initial drawing needed to be clarified because the specs didn\u2019t identify the type of wood required, an RFI would be issued to the general contractor.<\/p>\n<p>The general contractor looks over the RFI and speaks to the client or property owner, if necessary to identify the type of wood that&#8217;s required for the flooring. Once the general contractor knows the answer to the subcontractor\u2019s query, it&#8217;s responded to on the RFI and returned to the <a href=\"\/blog\/subcontractor-management-in-construction\">subcontractor<\/a>. If there are no further questions, the subcontractor will commence with the work.<\/p>\n<h2>RFI Construction Template<\/h2>\n<p>Of course, an RFI for construction has a bit more information than that. There&#8217;s the RFI number, the date the RFI is submitted and when a response is needed. There can also be attachments. All of this and more is included in our <a href=\"https:\/\/www.projectmanager.com\/templates\/rfi-template\">free request for information template for Word<\/a>. Download it now and use it for all your construction RFI needs.<\/p>\n<figure id=\"attachment_61473\" aria-describedby=\"caption-attachment-61473\" style=\"width: 592px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.projectmanager.com\/templates\/rfi-template\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-61473 \" src=\"\/wp-content\/uploads\/2021\/01\/RFI-Screenshot.jpg\" alt=\"ProjectManager's RFI construction template\" width=\"592\" height=\"529\" srcset=\"\/wp-content\/uploads\/2021\/01\/RFI-Screenshot.jpg 810w, \/wp-content\/uploads\/2021\/01\/RFI-Screenshot-600x536.jpg 600w, \/wp-content\/uploads\/2021\/01\/RFI-Screenshot-300x268.jpg 300w, \/wp-content\/uploads\/2021\/01\/RFI-Screenshot-768x686.jpg 768w, \/wp-content\/uploads\/2021\/01\/RFI-Screenshot-450x402.jpg 450w\" sizes=\"auto, (max-width: 592px) 100vw, 592px\" \/><\/a><figcaption id=\"caption-attachment-61473\" class=\"wp-caption-text\">Free RFI template. <a href=\"https:\/\/www.projectmanager.com\/templates\/rfi-template\">Download now<\/a><\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<h2>More Free Construction Project Management Templates<\/h2>\n<p>The RFI construction template is but one of over 100 project management templates for Excel and Word that you can download for free. We have free templates for every phase of your project and for many different industries. Here are some of the <a href=\"\/blog\/8-free-excel-construction-templates\">construction project management templates<\/a> you can download now for free.<\/p>\n<h3><a href=\"https:\/\/www.projectmanager.com\/templates\/project-budget-template\">Project Budget Template<\/a><\/h3>\n<p>Construction projects cost money and the more accurate your estimate of those costs, the safer your profit margin. Use our free project budget template for Excel to accurately estimate your labor, materials and other costs to create a realistic budget for your project.<\/p>\n<h3><a href=\"https:\/\/www.projectmanager.com\/templates\/scope-of-work-template\">Scope of Work Template<\/a><\/h3>\n<p>The scope of work describes everything a project covers and what it doesn\u2019t cover. Use our free scope of work template for Word to guide your crew throughout the execution of your construction project to show them how those tasks meet the project\u2019s goals and objectives.<\/p>\n<h3><a href=\"https:\/\/www.projectmanager.com\/templates\/construction-schedule-template\">Construction Schedule Template<\/a><\/h3>\n<p>Our free construction schedule template takes you right into our software for a free trial. Now you can do more than what any template can offer, from allocating resources and linking dependencies to creating a budget and filtering for the critical path.<\/p>\n<h2>How ProjectManager Helps Manage Construction Projects<\/h2>\n<p>If you used the construction schedule template in our app, you\u2019ll have seen how superior project management software is to static templates that need to be manually updated. Templates just slow you down, and they\u2019re no good for collaboration. <a href=\"\/\">ProjectManager<\/a> is award-winning construction project management software that helps you plan, manage and track your project in real time. We\u2019ve already talked about our multiple project views, but that\u2019s only the beginning of the powerful features you\u2019ll find in our software.<\/p>\n<h3>Plan, Schedule and Track Resource Utilization<\/h3>\n<p>Construction projects are busy. From architects and engineers in the office to subcontractors on the job site, there are many people to manage. Once you onboard everyone in our software you can set their availability, from PTO to holidays and vacation time, which makes it easier to <a href=\"\/software\/resource-management\">schedule your resources. <\/a><\/p>\n<p>Then, check out our color-coded workload chart to view the team\u2019s allocation of tasks. You can balance their workload right from the chart and keep them working at capacity and productive.<\/p>\n<h3><a href=\"\/software\/resource-management\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-68538 size-full\" src=\"\/wp-content\/uploads\/2023\/10\/tab-workload-1.jpg\" alt=\"ProjectManager's workload chart\" width=\"1558\" height=\"972\" srcset=\"\/wp-content\/uploads\/2023\/10\/tab-workload-1.jpg 1558w, \/wp-content\/uploads\/2023\/10\/tab-workload-1-600x374.jpg 600w, \/wp-content\/uploads\/2023\/10\/tab-workload-1-300x187.jpg 300w, \/wp-content\/uploads\/2023\/10\/tab-workload-1-768x479.jpg 768w, \/wp-content\/uploads\/2023\/10\/tab-workload-1-1536x958.jpg 1536w, \/wp-content\/uploads\/2023\/10\/tab-workload-1-450x281.jpg 450w\" sizes=\"auto, (max-width: 1558px) 100vw, 1558px\" \/><\/a><br \/>\nMake Budgets and Track Project Costs<\/h3>\n<p>All your project costs can be planned, managed and tracked in our Gantt chart, including human and nonhuman resources. Then you can track project costs and more from our real-time dashboards, which give you a high-level overview of the project. Easy-to-read graphs and charts show cost, time, workload and more.<\/p>\n<p>There\u2019s no time-consuming and complicated setup as you\u2019ll find with competitor\u2019s products. Our dashboard is ready when you are. If you need more detail, use our <a href=\"\/software\/reporting\">customizable reports<\/a>, from status to variance, workload and timesheet reports, all of which can be filtered and shared to keep stakeholders informed.<\/p>\n<a href=\"\/software\/dashboard\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-63501 size-large\" src=\"\/wp-content\/uploads\/2022\/07\/Dashboard-light-mode-1600x857.jpg\" alt=\"Dashboard image light mode ProjectManager\" width=\"1600\" height=\"857\" srcset=\"\/wp-content\/uploads\/2022\/07\/Dashboard-light-mode-1600x857.jpg 1600w, \/wp-content\/uploads\/2022\/07\/Dashboard-light-mode-600x321.jpg 600w, \/wp-content\/uploads\/2022\/07\/Dashboard-light-mode-300x161.jpg 300w, \/wp-content\/uploads\/2022\/07\/Dashboard-light-mode-768x411.jpg 768w, \/wp-content\/uploads\/2022\/07\/Dashboard-light-mode-1536x823.jpg 1536w, \/wp-content\/uploads\/2022\/07\/Dashboard-light-mode-2048x1097.jpg 2048w, \/wp-content\/uploads\/2022\/07\/Dashboard-light-mode-450x241.jpg 450w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/a>\n<h2>Related Construction Project Management Content<\/h2>\n<p>Looking for more construction project management articles? You\u2019ve come to the right place. We publish weekly blogs and have tutorial videos and free templates that are all easily accessible on our site. Here are some of the construction-related articles we\u2019ve posted.<\/p>\n<ul>\n<li><a href=\"https:\/\/www.projectmanager.com\/blog\/construction-documents\">26 Construction Documents (Templates Included)<\/a><\/li>\n<li><a href=\"https:\/\/www.projectmanager.com\/blog\/8-free-excel-construction-templates\">Free Excel Construction Templates<\/a><\/li>\n<li><a href=\"https:\/\/www.projectmanager.com\/blog\/rfp-request-for-proposals-templates\">RFP: A Quick Guide to Request for Proposals (Templates Included)<\/a><\/li>\n<li><a href=\"https:\/\/www.projectmanager.com\/blog\/best-construction-scheduling-software\">Best Construction Scheduling Software: Free &amp; Paid Options Ranked<\/a><\/li>\n<li><a href=\"https:\/\/www.projectmanager.com\/blog\/a-quick-guide-to-change-orders\">Change Orders in Construction Project Management<\/a><\/li>\n<\/ul>\n<p><em>ProjectManager is online project and portfolio management software that connects teams whether they\u2019re in the office, out on the job site or anywhere in between. They can share files, comment at the task level and stay updated with email and in-app notifications. <a href=\"\/pricing\">Get started with ProjectManager today for free.<\/a><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>An army of subcontractors each with their own specific discipline complete construction projects. But how do they know what to&#8230;<br \/><a class=\"excerpt-read-more button blue\" href=\"https:\/\/www.projectmanager.com\/blog\/rfi-in-construction\">Read More<\/a><\/p>\n","protected":false},"author":45,"featured_media":69814,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_yoast_wpseo_meta-robots-noindex":0,"_yoast_wpseo_canonical":"","_yoast_wpseo_opengraph-title":"","_yoast_wpseo_opengraph-description":"","_yoast_wpseo_opengraph-image":"","_yoast_wpseo_twitter-title":"","_yoast_wpseo_twitter-description":"","head_code_insert":"","footnotes":""},"categories":[317,320,131],"tags":[],"class_list":["post-69718","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction","category-project-documents","category-blog"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>RFI in Construction: A Quick Guide for Contractors - ProjectManager<\/title>\n<meta name=\"description\" content=\"An RFI for construction is a request for information. Learn what that is, why it&#039;s so important and the key components and process.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.projectmanager.com\/blog\/rfi-in-construction\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"RFI in Construction: A Quick Guide for Contractors\" \/>\n<meta property=\"og:description\" content=\"An RFI for construction is a request for information. Learn what that is, why it&#039;s so important and the key components and process.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.projectmanager.com\/blog\/rfi-in-construction\" \/>\n<meta property=\"og:site_name\" content=\"ProjectManager\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/projectmanage\/\" \/>\n<meta property=\"article:published_time\" content=\"2024-03-08T20:00:39+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-28T19:42:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.projectmanager.com\/wp-content\/uploads\/2024\/03\/RFI-in-Construction.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"940\" \/>\n\t<meta property=\"og:image:height\" content=\"540\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"William Malsam\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@Malsam_PM\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"William Malsam\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/rfi-in-construction#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/rfi-in-construction\"},\"author\":{\"name\":\"William Malsam\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#\\\/schema\\\/person\\\/3483ea14874d0b9e9a9532f8e4899a3c\"},\"headline\":\"RFI in Construction: A Quick Guide for Contractors\",\"datePublished\":\"2024-03-08T20:00:39+00:00\",\"dateModified\":\"2026-04-28T19:42:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/rfi-in-construction\"},\"wordCount\":2157,\"publisher\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/rfi-in-construction#primaryimage\"},\"thumbnailUrl\":\"\\\/wp-content\\\/uploads\\\/2024\\\/03\\\/RFI-in-Construction.jpg\",\"articleSection\":[\"Construction\",\"Project Documents\",\"Project Management Blog\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/rfi-in-construction\",\"url\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/rfi-in-construction\",\"name\":\"RFI in Construction: A Quick Guide for Contractors - ProjectManager\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/rfi-in-construction#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/rfi-in-construction#primaryimage\"},\"thumbnailUrl\":\"\\\/wp-content\\\/uploads\\\/2024\\\/03\\\/RFI-in-Construction.jpg\",\"datePublished\":\"2024-03-08T20:00:39+00:00\",\"dateModified\":\"2026-04-28T19:42:40+00:00\",\"description\":\"An RFI for construction is a request for information. Learn what that is, why it's so important and the key components and process.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/rfi-in-construction#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/rfi-in-construction\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/rfi-in-construction#primaryimage\",\"url\":\"\\\/wp-content\\\/uploads\\\/2024\\\/03\\\/RFI-in-Construction.jpg\",\"contentUrl\":\"\\\/wp-content\\\/uploads\\\/2024\\\/03\\\/RFI-in-Construction.jpg\",\"width\":940,\"height\":540},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/blog\\\/rfi-in-construction#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.projectmanager.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"RFI in Construction: A Quick Guide for Contractors\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#website\",\"url\":\"https:\\\/\\\/www.projectmanager.com\\\/\",\"name\":\"ProjectManager\",\"description\":\"The Best Project Management Software for Managing your Projects\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.projectmanager.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#organization\",\"name\":\"ProjectManager\",\"url\":\"https:\\\/\\\/www.projectmanager.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/ProjectManager-Logo-for-Website.png\",\"contentUrl\":\"\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/ProjectManager-Logo-for-Website.png\",\"width\":696,\"height\":696,\"caption\":\"ProjectManager\"},\"image\":{\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/projectmanage\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/projectmanager.com\\\/\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/projectmanagervideos\",\"https:\\\/\\\/en.wikipedia.org\\\/wiki\\\/ProjectManager.com\"],\"description\":\"ProjectManager is a project and portfolio management software that offers online project management tools like Gantt charts, dashboards, kanban boards, task management features and more. With advanced planning and scheduling, automated cost and time tracking, risk analysis and resource management, our platform ensures flawless execution for construction, manufacturing and professional services teams, while providing unbeatable insights at every stage.\",\"legalName\":\"ProjectManager.com, Inc.\",\"foundingDate\":\"2008-01-01\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":\"11\",\"maxValue\":\"50\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.projectmanager.com\\\/#\\\/schema\\\/person\\\/3483ea14874d0b9e9a9532f8e4899a3c\",\"name\":\"William Malsam\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ee3696da4cbc91bc109142d860805e760b29e78d19b8fcab925873e4fb974260?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ee3696da4cbc91bc109142d860805e760b29e78d19b8fcab925873e4fb974260?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ee3696da4cbc91bc109142d860805e760b29e78d19b8fcab925873e4fb974260?s=96&d=mm&r=g\",\"caption\":\"William Malsam\"},\"description\":\"William is the Director of Content at ProjectManager.com. He writes and edits content for the website, blog, and bi-weekly newsletter.\",\"sameAs\":[\"https:\\\/\\\/x.com\\\/Malsam_PM\"],\"knowsAbout\":[\"Project management\",\"Project planning\",\"Blogs\"],\"knowsLanguage\":[\"English\"],\"jobTitle\":\"Project Management Expert Writer\",\"worksFor\":\"ProjectManager.com\",\"url\":\"https:\\\/\\\/www.projectmanager.com\\\/author\\\/williammalsam\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"RFI in Construction: A Quick Guide for Contractors - ProjectManager","description":"An RFI for construction is a request for information. Learn what that is, why it's so important and the key components and process.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.projectmanager.com\/blog\/rfi-in-construction","og_locale":"en_US","og_type":"article","og_title":"RFI in Construction: A Quick Guide for Contractors","og_description":"An RFI for construction is a request for information. Learn what that is, why it's so important and the key components and process.","og_url":"https:\/\/www.projectmanager.com\/blog\/rfi-in-construction","og_site_name":"ProjectManager","article_publisher":"https:\/\/www.facebook.com\/projectmanage\/","article_published_time":"2024-03-08T20:00:39+00:00","article_modified_time":"2026-04-28T19:42:40+00:00","og_image":[{"width":940,"height":540,"url":"https:\/\/www.projectmanager.com\/wp-content\/uploads\/2024\/03\/RFI-in-Construction.jpg","type":"image\/jpeg"}],"author":"William Malsam","twitter_card":"summary_large_image","twitter_creator":"@Malsam_PM","twitter_misc":{"Written by":"William Malsam","Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.projectmanager.com\/blog\/rfi-in-construction#article","isPartOf":{"@id":"https:\/\/www.projectmanager.com\/blog\/rfi-in-construction"},"author":{"name":"William Malsam","@id":"https:\/\/www.projectmanager.com\/#\/schema\/person\/3483ea14874d0b9e9a9532f8e4899a3c"},"headline":"RFI in Construction: A Quick Guide for Contractors","datePublished":"2024-03-08T20:00:39+00:00","dateModified":"2026-04-28T19:42:40+00:00","mainEntityOfPage":{"@id":"https:\/\/www.projectmanager.com\/blog\/rfi-in-construction"},"wordCount":2157,"publisher":{"@id":"https:\/\/www.projectmanager.com\/#organization"},"image":{"@id":"https:\/\/www.projectmanager.com\/blog\/rfi-in-construction#primaryimage"},"thumbnailUrl":"\/wp-content\/uploads\/2024\/03\/RFI-in-Construction.jpg","articleSection":["Construction","Project Documents","Project Management Blog"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.projectmanager.com\/blog\/rfi-in-construction","url":"https:\/\/www.projectmanager.com\/blog\/rfi-in-construction","name":"RFI in Construction: A Quick Guide for Contractors - ProjectManager","isPartOf":{"@id":"https:\/\/www.projectmanager.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.projectmanager.com\/blog\/rfi-in-construction#primaryimage"},"image":{"@id":"https:\/\/www.projectmanager.com\/blog\/rfi-in-construction#primaryimage"},"thumbnailUrl":"\/wp-content\/uploads\/2024\/03\/RFI-in-Construction.jpg","datePublished":"2024-03-08T20:00:39+00:00","dateModified":"2026-04-28T19:42:40+00:00","description":"An RFI for construction is a request for information. Learn what that is, why it's so important and the key components and process.","breadcrumb":{"@id":"https:\/\/www.projectmanager.com\/blog\/rfi-in-construction#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.projectmanager.com\/blog\/rfi-in-construction"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.projectmanager.com\/blog\/rfi-in-construction#primaryimage","url":"\/wp-content\/uploads\/2024\/03\/RFI-in-Construction.jpg","contentUrl":"\/wp-content\/uploads\/2024\/03\/RFI-in-Construction.jpg","width":940,"height":540},{"@type":"BreadcrumbList","@id":"https:\/\/www.projectmanager.com\/blog\/rfi-in-construction#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.projectmanager.com\/"},{"@type":"ListItem","position":2,"name":"RFI in Construction: A Quick Guide for Contractors"}]},{"@type":"WebSite","@id":"https:\/\/www.projectmanager.com\/#website","url":"https:\/\/www.projectmanager.com\/","name":"ProjectManager","description":"The Best Project Management Software for Managing your Projects","publisher":{"@id":"https:\/\/www.projectmanager.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.projectmanager.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.projectmanager.com\/#organization","name":"ProjectManager","url":"https:\/\/www.projectmanager.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.projectmanager.com\/#\/schema\/logo\/image\/","url":"\/wp-content\/uploads\/2026\/06\/ProjectManager-Logo-for-Website.png","contentUrl":"\/wp-content\/uploads\/2026\/06\/ProjectManager-Logo-for-Website.png","width":696,"height":696,"caption":"ProjectManager"},"image":{"@id":"https:\/\/www.projectmanager.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/projectmanage\/","https:\/\/www.linkedin.com\/company\/projectmanager.com\/","https:\/\/www.youtube.com\/user\/projectmanagervideos","https:\/\/en.wikipedia.org\/wiki\/ProjectManager.com"],"description":"ProjectManager is a project and portfolio management software that offers online project management tools like Gantt charts, dashboards, kanban boards, task management features and more. With advanced planning and scheduling, automated cost and time tracking, risk analysis and resource management, our platform ensures flawless execution for construction, manufacturing and professional services teams, while providing unbeatable insights at every stage.","legalName":"ProjectManager.com, Inc.","foundingDate":"2008-01-01","numberOfEmployees":{"@type":"QuantitativeValue","minValue":"11","maxValue":"50"}},{"@type":"Person","@id":"https:\/\/www.projectmanager.com\/#\/schema\/person\/3483ea14874d0b9e9a9532f8e4899a3c","name":"William Malsam","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/ee3696da4cbc91bc109142d860805e760b29e78d19b8fcab925873e4fb974260?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/ee3696da4cbc91bc109142d860805e760b29e78d19b8fcab925873e4fb974260?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ee3696da4cbc91bc109142d860805e760b29e78d19b8fcab925873e4fb974260?s=96&d=mm&r=g","caption":"William Malsam"},"description":"William is the Director of Content at ProjectManager.com. He writes and edits content for the website, blog, and bi-weekly newsletter.","sameAs":["https:\/\/x.com\/Malsam_PM"],"knowsAbout":["Project management","Project planning","Blogs"],"knowsLanguage":["English"],"jobTitle":"Project Management Expert Writer","worksFor":"ProjectManager.com","url":"https:\/\/www.projectmanager.com\/author\/williammalsam"}]}},"_links":{"self":[{"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/posts\/69718","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/users\/45"}],"replies":[{"embeddable":true,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/comments?post=69718"}],"version-history":[{"count":0,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/posts\/69718\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/media\/69814"}],"wp:attachment":[{"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/media?parent=69718"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/categories?post=69718"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.projectmanager.com\/wp-json\/wp\/v2\/tags?post=69718"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}